My bookmarksSign up free

2014/713/EU: Commission Decision of 13 October 2014 on the… Article 1

2014/713/EU: Commission Decision of 13 October 2014 on the… Article 1

Article 1

The Commission establishes for the development of harmonised electricity rules this annual priority list for 2015: — network connection rules: — rules on requirements for grid connection applicable to generators (Commission adoption phase), — demand connection (Commission adoption phase), — rules on high-voltage direct current transmission system connection (finalise network code and start Commission adoption phase), — system operation rules: — rules on load-frequency control and reserves (Commission adoption phase), — rules on emergency requirements & procedures (finalise network code and start Commission adoption phase), — rules on operational security (Commission adoption phase), — rules on operational planning and scheduling (Commission adoption phase), — rules on capacity allocation and congestion management for day-ahead and intraday markets, including capacity calculation (Commission adoption phase), — balancing rules including network-related reserve power (finalise network code and start Commission adoption phase), — rules for longer term (forward) capacity allocation (Commission adoption phase), — rules regarding harmonised transmission tariff structures (scoping by ACER to prepare framework guideline  ( 5 ) ).

Read the full instrument →

Other provisions in 2014/713/EU: Commission Decision of 13 October 2014 on the…

Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗ · Data as of 2026-07-04

CitationArticle 1 of 2014/713/EU: Commission Decision of 13 October 2014 on the… (LawPlayer, data as of 2026-07-04)