Article 1
Open ↗The Commission establishes for the development of harmonised electricity rules this annual priority list for 2015: — network connection rules: — rules on requirements for grid connection applicable to generators (Commission adoption phase), — demand connection (Commission adoption phase), — rules on high-voltage direct current transmission system connection (finalise network code and start Commission adoption phase), — system operation rules: — rules on load-frequency control and reserves (Commission adoption phase), — rules on emergency requirements & procedures (finalise network code and start Commission adoption phase), — rules on operational security (Commission adoption phase), — rules on operational planning and scheduling (Commission adoption phase), — rules on capacity allocation and congestion management for day-ahead and intraday markets, including capacity calculation (Commission adoption phase), — balancing rules including network-related reserve power (finalise network code and start Commission adoption phase), — rules for longer term (forward) capacity allocation (Commission adoption phase), — rules regarding harmonised transmission tariff structures (scoping by ACER to prepare framework guideline ( 5 ) ).