Inputs and off-takes after the gas day
Article 37
1. No later than the end of gas day D+1, the transmission system operator shall provide each network user with an initial allocation for its inputs and off-takes on day D and an initial daily imbalance quantity. (a) For the information models base case and variant 1, all gas delivered to the distribution system shall be allocated; (b) for the information model variant 2, the non daily metered off-takes shall equal the forecast of a network user’s non daily metered off-takes provided day ahead; (c) for the information model variant 1, an initial allocation and an initial daily imbalance quantity shall be considered as the final allocation and the final daily imbalance quantity. 2. Where an interim measure referred to in Articles 47 to 51 applies, an initial allocation and an initial daily imbalance quantity can be provided within three gas days after gas day D in case it would not be technically or operationally feasible to comply with paragraph 1. 3. The transmission system operator shall provide each network user with the final allocation for its inputs and off-takes and the final daily imbalance quantity within a period of time defined under the applicable national rules.