Procedures for demand units within a demand facility or a closed distribution system connected at a voltage level of or below 1 000 V
Article 32
1. The operational notification procedure for a demand unit within a demand facility or a closed distribution system connected at a voltage level of or below 1 000 V shall comprise an installation document. 2. The installation document template shall be provided by the relevant system operator, and the contents agreed with the relevant TSO, either directly or indirectly through a third party. 3. Based on an installation document, the demand facility owner or the CDSO shall submit information, directly or indirectly through a third party, to the relevant system operator or relevant TSO. The date of this submission shall be prior to the offer in the market of the capacity of the demand response by the demand unit. The requirements set in the installation document shall differentiate between different types of connections and between the different categories of demand response services. 4. For subsequent demand units with demand response, separate installation documents shall be provided. 5. The content of the installation document of individual demand units may be aggregated by the relevant system operator or relevant TSO. 6. The installation document shall contain the following items: (a) the location at which the demand unit with demand response is connected to the network; (b) the maximum capacity of the demand response installation in kW; (c) the type of demand response services; (d) the demand unit certificate and the equipment certificate as relevant for the demand response service, or if not available, equivalent information; (e) the contact details of the demand facility owner, the closed distribution system operator or the third party aggregating the demand units from the demand facility or the closed distribution system.