1.   With regard to the reactive power capability simulation of a transmission-connected distribution facility: (a) a steady-state load flow simulation model of the network of the transmission-connected distribution system shall be used in order to calculate the reactive power exchange under different load and generation conditions; (b) a combination of steady-state minimum and maximum load and generation conditions resulting in the lowest and highest reactive power exchange shall be part of the simulations; (c) calculating the reactive power export at an active power flow of less than 25 % of the maximum import capability at the connection point shall be part of the simulations in accordance with Article 15. 2.   The relevant TSO may specify the method for compliance simulation of the active control of reactive power set out in Article 15(3). 3.   The simulation shall be deemed passed if the results demonstrate compliance with the requirements set out in Article 15.

Read the full instrument → · Read this in context: CHAPTER 3 — Compliance simulation →

Other provisions in CHAPTER 3 — Compliance simulation

Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗ · Data as of 2026-07-04

CitationArticle 43 of Commission Regulation (EU) 2016/1388 (LawPlayer, data as of 2026-07-04)

© European Union, https://eur-lex.europa.eu, 1998-2026. Reuse authorised under Commission Decision 2011/833/EU, provided the source is acknowledged.

What to look at next