Procedure in case of post-construction assessment
Article 8
1. In case of post-construction assessment, referred to in Articles 19 and 23 of Directive 2013/53/EU, where the notified body has to affix under his responsibility the watercraft identification number, the unique code of manufacturer is indicated by the post-construction assessment identification code and shall be assigned by the national authority of the Member State where the notified body is established. 2. When assigning the post-construction assessment identification code the notified bodies shall have it registered in the notified bodies' register.