Structural data exchange
Article 45
1. Each SGU which is a power generating facility owner of a type D power generating module connected to the transmission system shall provide the TSO with at least the following data: (a) general data of the power generating module, including installed capacity and primary energy source; (b) turbine and power generating facility data including time for cold and warm start; (c) data for short-circuit current calculation; (d) power generating facility transformer data; (e) FCR data of power generating modules offering or providing that service, in accordance with Article 154; (f) FRR data of power generating modules offering or providing that service, in accordance with Article 158; (g) RR data of power generating modules that offer or provide that service in accordance with Article 161; (h) data necessary for restoration of the transmission system; (i) data and models necessary for performing dynamic simulation; (j) protection data; (k) data necessary for determining the costs of remedial actions in accordance with Article 78(1)(b); where a TSO makes use of market based mechanisms in line with Article 4(2)(d), the provision of prices to be paid by the TSO shall be considered sufficient; (l) voltage and reactive power control capability. 2. Each SGU which is a power generating facility owner of a type B or a type C power generating module connected to the transmission system shall provide the TSO with at least the following data: (a) general data of the power generating module, including installed capacity and primary energy source; (b) data for short-circuit current calculation; (c) FCR data according to the definition and requirements of the Article 173 for power generating modules offering or providing that service; (d) FRR data for power generating modules that offer or provide that service; (e) RR data for power generating modules that offer or provide that service; (f) protection data; (g) reactive power control capability; (h) data necessary for determining the costs of remedial actions in accordance with Article 78(1)(b); where a TSO makes use of market based mechanisms in line with Article 4(2)(d), the provision of prices to be paid by the TSO shall be considered sufficient; (i) data necessary for performing dynamic stability assessment according to Article 38. 3. A TSO may request the power generating facility owner of a power generating module connected to the transmission system to provide further data where appropriate for operational security analysis in accordance with Title 2 of Part III. 4. Each HVDC system owner or interconnector owner shall provide the TSO with the following data regarding the HVDC system or interconnector: (a) nameplate data of the installation; (b) transformers data; (c) data on filters and filter banks; (d) reactive power compensation data; (e) active power control capability; (f) reactive power and voltage control capability; (g) active or reactive operational mode prioritization, if existing; (h) frequency response capability; (i) dynamic models for dynamic simulation; (j) protection data; and (k) fault-ride-through capability. 5. Each AC interconnector owner shall provide the TSO with at least the following data: (a) nameplate data of the installation; (b) electrical parameters; (c) associated protections.