Real-time data exchange

Article 47

1.   Unless otherwise provided by the TSO, each significant grid user which is a power generating facility owner of type B, C or D power generating module shall provide the TSO, in real-time, at least the following data: (a) position of the circuit breakers at the connection point or another point of interaction agreed with the TSO; (b) active and reactive power at the connection point or another point of interaction agreed with the TSO; and (c) in the case of power generating facility with consumption other than auxiliary consumption net active and reactive power. 2.   Unless otherwise provided by the TSO, each HVDC system or AC interconnector owner shall provide, in real-time, at least the following data regarding the connection point of the HVDC system or AC interconnector to the TSOs: (a) position of the circuit breakers; (b) operational status; and (c) active and reactive power.

Read the full instrument → · Read this in context: CHAPTER 4 — Data exchange between TSOs, owners of interconnectors or other lines and power generating modules connected to the transmission system →

Other provisions in CHAPTER 4 — Data exchange between TSOs, owners of interconnectors or other lines and power generating modules connected to the transmission system

Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗ · Data as of 2026-07-04

CitationArticle 47 of Commission Regulation (EU) 2017/1485 (LawPlayer, data as of 2026-07-04)

© European Union, https://eur-lex.europa.eu, 1998-2026. Reuse authorised under Commission Decision 2011/833/EU, provided the source is acknowledged.

What to look at next