LawPlayer
My bookmarks

Council Implementing Decision (EU) 2018/1993 Article 2

Council Implementing Decision (EU) 2018/1993 Article 2

Architecture of the IPCR

Article 2

1.   The IPCR shall have two modes of activation, to be decided by the Presidency, depending on the gravity of the crisis and the needs for the response: (a) information sharing mode, which shall serve to establish a clear picture of the situation and to prepare the ground for a possible full activation; (b) full activation mode, which implies the preparation of response measures. 2.   The IPCR shall consist of the supporting elements that are essential to ensuring informed decision-making within the Council and an effective political coordination at Union level. These supporting elements shall be the following: (a) informal roundtables convened by the Presidency with the support and advice of the General Secretariat of the Council (‘GSC’), as referred to in Article 7; (b) integrated situational awareness and analysis (‘ISAA’) capability developed by the Commission services and the EEAS within their respective roles and responsibilities, as referred to in Article 8; (c) a Council-owned, dedicated and protected web platform facilitating a timely exchange of information, as referred to in Article 9; and (d) a central 24/7 contact point at Union level with Member States' competent authorities and other stakeholders, which shall be provided for by the European Commission Emergency Response Coordination Centre, as referred to in Article 10. 3.   In order to enhance the decision-making at Union political level, the supporting elements referred to in points (a), (b) and (c) of paragraph 2 shall have the following characteristics: (a) be tailored to the needs of the political decision-making level, under the guidance of the Presidency following the activation of the IPCR and in consultation with the Commission services and the EEAS; (b) cover all the key sectors affected by the crisis; (c) be integrated, bringing together the different dimensions of a crisis in a coherent way; (d) have the appropriate level of detail needed; and (e) be delivered in a timely manner, allowing sufficient time ahead of formal discussions.

Read the full instrument →

Other provisions in Council Implementing Decision (EU) 2018/1993

CitationArticle 2 of Council Implementing Decision (EU) 2018/1993 (LawPlayer, data as of 2026-07-04)

DATA NOTES

About the data

Sources

This page

Law
Article 2 of Council Implementing Decision (EU) 2018/1993 is headed “Architecture of the IPCR” and is a provision of EU legislation.
Text
The text of Article 2 of Council Implementing Decision (EU) 2018/1993 begins “1. The IPCR shall have two modes of activation, to be decided by the Presidency, depending on the gravity of the crisis and the needs for…”.
Previous
On LawPlayer, the provision listed immediately before Article 2 of Council Implementing Decision (EU) 2018/1993 is Article 1.
Next
On LawPlayer, the provision listed immediately after Article 2 of Council Implementing Decision (EU) 2018/1993 is Article 3.
Synced
LawPlayer last synced the text of Council Implementing Decision (EU) 2018/1993 from EUR-Lex (Publications Office of the European Union) on 4 July 2026.
Article 2 of Council Implementing Decision (EU) 2018/1993 is reproduced on LawPlayer from EUR-Lex (Publications Office of the European Union).

Sources

© European Union, https://eur-lex.europa.eu, 1998-2026. Reuse authorised under Commission Decision 2011/833/EU, provided the source is acknowledged. · Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Data as of 2026-07-04Read the official text ↗

About

LawPlayer is a privately run legal research website for reading EU legislation article by article, built for lawyers, in-house counsel and students who need to check the legal text quickly.EU law entry

What to look at next