LawPlayer
My bookmarksSign up freeSign up free

Commission Implementing Regulation (EU) 2018/2066 Article 75b

Commission Implementing Regulation (EU) 2018/2066 Article 75b

Monitoring plans

Article 75b

1.   Article 11, Article 12(2), Articles 13 and 14, Article 15(1) and (2), and Article 16 shall apply. For that purpose: (a)  any reference to operator or aircraft operator shall be read as if it were a reference to the regulated entity; (b)  any reference to aviation activity shall be read as if it were a reference to the activity of the regulated entity. 2.   At the latest 4 months before a regulated entity commences the activity covered by Annex III to Directive 2003/87/EC, it shall submit to the competent authority a monitoring plan for approval, unless the competent authority has set an alternative time limit for this submission. The monitoring plan shall consist of a detailed, complete and transparent documentation of the monitoring methodology of a specific regulated entity and shall contain at least the elements laid down in Annex I. Together with the monitoring plan, the regulated entity shall submit the results of a risk assessment providing evidence that the proposed control activities and procedures for control activities are commensurate with the inherent risks and control risks identified. 3.   In accordance with Article 15, significant modifications to the monitoring plan of a regulated entity include: (a)  changes to the category of the regulated entity where such changes require a change in the monitoring methodology or lead to a change of the applicable materiality level pursuant to Article 23 of Implementing Regulation (EU) 2018/2067; (b)  notwithstanding Article 75n, changes regarding whether the regulated entity is considered a ‘regulated entity with low emissions’; (c)  a change in the tier applied; (d)  the introduction of new fuel streams; (e)  a change in the categorisation of fuel streams – between major or de-minimis fuel streams where such a change requires a change to the monitoring methodology; (f)  a change to the default value for a calculation factor, where the value is to be laid down in the monitoring plan; (g)  a change in the default value for the scope factor; (h)  the introduction of new methods or changes to existing methods related to sampling, analysis or calibration, where this has a direct impact on the accuracy of emissions data.

Read the full instrument →

Other provisions in Commission Implementing Regulation (EU) 2018/2066

Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗ · Data as of 2026-11-02

CitationArticle 75b of Commission Implementing Regulation (EU) 2018/2066 (LawPlayer, data as of 2026-11-02)

© European Union, https://eur-lex.europa.eu, 1998-2026. Reuse authorised under Commission Decision 2011/833/EU, provided the source is acknowledged.

What to look at next