My bookmarksSign up free

Commission Delegated Regulation (EU) 2023/2104 ANNEX II

Commission Delegated Regulation (EU) 2023/2104 ANNEX II

ANNEX IISupplementary provisions

ANNEX II ‘ANNEX IV Correction factors for avoided grid losses for the application of the harmonised efficiency reference values for separate production of electricity (referred to in Article 2(2)) Connection voltage level Correction factor (Off-site) Correction factor (On-site) ≥ 345 kV 1 0,976 ≥ 200 – < 345 kV 0,972 0,963 ≥ 100 – < 200 kV 0,963 0,951 ≥ 50 – < 100 kV 0,952 0,936 ≥ 12 – < 50 kV 0,935 0,914 ≥ 0,45 – < 12kV 0,918 0,891 < 0,45 kV 0,888 0,851 Example: A 100 kWel cogeneration unit with a reciprocating engine driven with natural gas generates electricity at 380 V. Of this, 85 % is used for own consumption and 15 % is fed into the grid. The plant was constructed in 2020. The annual ambient temperature is 15 °C (so no climatic correction is necessary). After the grid loss correction the resulting efficiency reference value for the separate production of electricity in this cogeneration unit would be, on the basis of the weighted mean of the factors in this Annex: Ref Εη = 53 % × (0,851 × 85 % + 0,888 × 15 %) = 45,4 % ’.

Read the full instrument →

Other provisions in Commission Delegated Regulation (EU) 2023/2104

Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗ · Data as of 2026-07-04

CitationANNEX II of Commission Delegated Regulation (EU) 2023/2104 (LawPlayer, data as of 2026-07-04)

© European Union, https://eur-lex.europa.eu, 1998-2026. Reuse authorised under Commission Decision 2011/833/EU, provided the source is acknowledged.

What to look at next