My bookmarksSign up free

Commission Implementing Decision (EU) 2025/165 ANNEX II

Commission Implementing Decision (EU) 2025/165 ANNEX II

ANNEX IISupplementary provisions

ANNEX II No Reference of the standard Date of withdrawal 1. EN 19:2016 Industrial valves – Marking of metallic valves 31.7.2026 2. EN 12952-3:2011 Water-tube boilers and auxiliary installations – Part 3: Design and calculation for pressure parts of the boiler 31.7.2026 3. EN 12952-8:2002 Water-tube boilers and auxiliary installations – Part 8: Requirements for firing systems for liquid and gaseous fuels for the boiler 31.7.2026 4. EN 12952-9:2002 Water-tube boilers and auxiliary installations – Part 9: Requirements for firing systems for pulverized solid fuels for the boiler 31.7.2026 5. EN 12952-16:2002 Water-tube boilers and auxiliary installations – Part 16: Requirements for grate and fluidized-bed firing systems for solid fuels for the boiler 31.7.2026 6. EN 15001-1:2009 Gas Infrastructure – Gas installation pipework with an operating pressure greater than 0,5 bar for industrial installations and greater than 5 bar for industrial and non-industrial installations – Part 1: Detailed functional requirements for design, materials, construction, inspection and testing 31.7.2026 7. EN 15776:2011+A1:2015 Unfired pressure vessels – Requirements for the design and fabrication of pressure vessels and pressure parts constructed from cast iron with an elongation after fracture equal or less than 15 % 31.7.2026

Read the full instrument →

Other provisions in Commission Implementing Decision (EU) 2025/165

Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗ · Data as of 2026-07-04

CitationANNEX II of Commission Implementing Decision (EU) 2025/165 (LawPlayer, data as of 2026-07-04)

© European Union, https://eur-lex.europa.eu, 1998-2026. Reuse authorised under Commission Decision 2011/833/EU, provided the source is acknowledged.

What to look at next