Processing of waste
Article 34
Operators shall give advance notification to the Commission of any processing campaign of material that has previously been declared as retained or conditioned waste, excluding repackaging or further conditioning without separation of elements. That advance notification shall include information on the amount of plutonium, high enriched uranium and uranium-233 per batch, the form, such as glass or high active liquid, the expected duration of the campaign, and the location of the material before and after the campaign. Such notification shall be communicated electronically to the Commission using the form set out in Annex XII, at least 200 days before the campaign starts.