LawPlayer
My bookmarks

Commission Regulation (Euratom) 2025/974 Article 9

Commission Regulation (Euratom) 2025/974 Article 9

Accounting system

Article 9

1.   Starting from the moment operators hold nuclear material, they shall maintain a system of accountancy and control for nuclear materials, which shall be effective in preventing, detecting and timely fixing irregularities leading to situations where nuclear material is incorrectly accounted for. This system shall include accounting and operating records and, in particular, information on the quantities, category, form and composition of nuclear materials as provided for in Article 21, their actual location and the particular safeguard obligation as provided for in Article 19, together with details of the recipient or shipper when nuclear materials are transferred. 2.   The system of measurements on which the records are based shall comply with the most recent international standards or shall be equivalent in quality to those standards. On the basis of those records, it must be possible to draw up and substantiate all accounting declarations made to the Commission. All records related to nuclear materials shall be retained as long as the nuclear materials are present in the installation, and for at least 5 years after the nuclear materials stopped being present in the installation, unless agreed otherwise. Further details may be specified in the particular safeguard provisions referred to in Article 8 for each installation. 3.   Accounting and operating records shall be made available in electronic form, if they are kept in this form by the installation. For installations referred to in Article 2, point (27)(a), an up-to-date list of inventory items shall be made available to the Commission’s inspectors in electronic form upon reasoned request, using the available information in accordance with the indicative format set out in Annex X.

Read the full instrument → · Read this in context: CHAPTER III — NUCLEAR MATERIAL ACCOUNTANCY →

Other provisions in CHAPTER III — NUCLEAR MATERIAL ACCOUNTANCY

CitationArticle 9 of Commission Regulation (Euratom) 2025/974 (LawPlayer, data as of 2026-07-04)

DATA NOTES

About the data

Sources

This page

Law
Article 9 of Commission Regulation (Euratom) 2025/974 is headed “Accounting system” and is a provision of EU legislation.
Text
The text of Article 9 of Commission Regulation (Euratom) 2025/974 begins “1. Starting from the moment operators hold nuclear material, they shall maintain a system of accountancy and control for nuclear materials…”.
Location
Article 9 of Commission Regulation (Euratom) 2025/974 is placed under “CHAPTER III: NUCLEAR MATERIAL ACCOUNTANCY”.
Previous
On LawPlayer, the provision listed immediately before Article 9 of Commission Regulation (Euratom) 2025/974 is Article 8.
Next
On LawPlayer, the provision listed immediately after Article 9 of Commission Regulation (Euratom) 2025/974 is Article 10.
Synced
LawPlayer last synced the text of Commission Regulation (Euratom) 2025/974 from EUR-Lex (Publications Office of the European Union) on 4 July 2026.
Article 9 of Commission Regulation (Euratom) 2025/974 is reproduced on LawPlayer from EUR-Lex (Publications Office of the European Union).

Sources

© European Union, https://eur-lex.europa.eu, 1998-2026. Reuse authorised under Commission Decision 2011/833/EU, provided the source is acknowledged. · Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Data as of 2026-07-04Read the official text ↗

About

On LawPlayer, every article of an EU act has its own page, linked to the full text and, where the act has them, to its Titles, Chapters and Sections; the same site also covers Taiwan's statutes, court judgments and company registration records, and the legislation of 13 other jurisdictions.EU law entry

What to look at next