My bookmarksSign up free
← Lembaga Letrik Sabah Act 1983

Lembaga Letrik Sabah Act 1983 s 57

Lembaga Letrik Sabah Act 1983 s 57

This legislation has been repealed. Do not cite it as law in force.

Text recovered by OCR from a scanned copy — section numbers and wording may be wrong. Check the official PDF on lom.agc.gov.my before citing.

s 57

(1) The Board shall before executing any of the Minister. several works mentioned below, submit for the approval of the Minister three copies of the respective plans and drawings as follows: (a) plans and drawings to a scale of not less than one in five hundred of dams, weirs, canals, reservoirs, tunnels, and headworks; (b) plans to a scale of not less than one in fifty _other scale approved by the Director of Lands and Surveys showing the main transmission limes; (c) plans and drawings of power houses to a scale of not less than one in five hundred. (2) If the disapproval of the Minister is not motified in respect ot any item at the expiration of twenty-eight days after the same shall have been submitted to him the said plans shall be deemed to have been approved and the Board shall be at liberty to execute the works. (3) The foregoing provisions shall also apply to any 'amended plans and drawings which the Board may submit to the Minister to meet any disapproval or objections raised by him: Provided that the Minister shall notify his approval or disapproval of or objections to any such amended plans and diawings before the expiration of fourteen days as from the date when the same shall have been so submitted, and in the event of nio notification being made within such period aforesaid the Board shall be at liberty to proceed as if approval had been given. ector of tall at a spốt tạn sê availector of ways, or 1alaysıa shall, il h a copy hin their y of the approval ›lans and less than ;, canals, e in fifty by the wing the to a scale it notified enty-eight ed to him approved e works. ; approval amended f fourteen have been tion being d shall be .given. IPt. VII, S. 57-58] (4) The Board shall not execute any of the works in respect of which plans are required to be submitted to the Minister except in accordance with approved plans and any breach of the requirements of this subsection shall render the Board liable on conviction to a penalty of one thousand ringgit for each default. Wayleaves

Malay text (authoritative)

(1) Lembaga hendaklah sebelum melaksanakan Pelan mana-mana daripada beberapa kerja yang dısebutkan di bawah ini, menghantar untuk kelulusan Menteri Menteri. tiga salinan pelan dan lukisan itu masing-masing seperti berikut: (a) pelan dan lukisan mengikut skala tidak kurang daripada satu dalam lima ratus bagi empangan, empang dasar, terusan, reservoir, terowong dan pangkal kerja; (b) pelan mengikut skala tidak kurang daripada satu dalam lima puluh ribu atau skala lain yang diluluskan oleh Pengarah Tanah dan Ukur menuniukkan talian penghantaran utama; (c) pelan dan lukisan rumah kuasa mengikut skala tidak kurane daripada satu dalam lima ratus. (2) Jika penolakan kelulusan oleh Menteri tidal liberitahu berkenaan dengan apa-apa butiran semas melaksanakan keria itu. [Bah. VII, S. 57-58] (3) Peruntukan-peruntukan yang terdahulu hendaklah juga terpakai bagi apa-apa pelan dan lukisan terpinda yang mungkin dihantar oleh Lembaga kepada Menteri supaya memenuhi apa-apa penolakan kelulusan atau apa-apa bantahan yang dibangkitkan olehnya: Dengan syarat bahawa Menteri hendaklah memberitahu kelulusan atau penolakan kelulusan bantahannya terhadap mana-mana pelan dan lukisan terpinda itu sebelum tamat tempoh empat belas hari mulai dari tarikh ia dihantarkan sedemikian, dan jika meneruskan kerja itu seolah-olah kelulusan . telah diberi. Izin-lalu di atas tanah. Izin-Lalu

Read this section in the full act → · Open Part VII →

Find Act 278 on lom.agc.gov.my ↗

Source: Laws of Malaysia, Attorney General's Chambers of Malaysia (lom.agc.gov.my). Not a copy of the Gazette printed by the Government Printer (Interpretation Acts 1948 and 1967, s 61).

What to look at next