Section 5
SEC. 5. Pre-construction Activities—In the implementation of the work, a general plan of operation shall be prepared to indicate the methods and the procedures to be followed. This plan will cover and organize all relevant fields of study, delineation of responsibilities for undertaking each phase, specifying or analyzing all analytical procedures and resources to be required for conducting the studies.