RA 9513 (Renewable Energy Act of 2008) Section 18

Payment of Transmission Charges.

Section 18

SEC. 18. Payment of Transmission Charges. — A registered renewable energy developer producing power and electricity from an intermittent RE resource may opt to pay the transmission and wheeling charges of TRANSCO or its successors-in-interest on a per kilowatt-hour basis at a cost equivalent to the average per kilowatt-hour basis at a cost equivalent to the average per kilowatt-hour rate of all other electricity transmitted through the grid.

Read the full instrument → · Open the chapter this section belongs to: CHAPTER VII →

Source: Official Gazette of the Republic of the Philippines — Philippine laws are public documents (works of the government).