RA 9513 (Renewable Energy Act of 2008) Section 20

Intermittent RE Resources.

Section 20

SEC. 20. Intermittent RE Resources. — TRANSCO or its successors-in-interest, in consultation with stakeholders, shall determine the maximum penetration limit of the Intermittent RE-based power plants to the Grid, through technical and economic analysis. Qualified and registered RE generating units with intermittent RE resources shall be considered "must dispatch" based on available energy and shall enjoy the benefit of priority dispatch. All provisions under the WESM Rules, Distribution and Grid Codes which do not allow "must dispatch" status for intermittent RE resources shall be deemed amended or modified. The PEMC and TRANSCO or its successors-in-interest shall implement technical mitigation and improvements in the system in order to ensure safety and reliability of electricity transmission. As used in this Act, RE generating unit with intermittent RE resources refers to a RE generating unit or group of units connected to a common connection point whose RE resource is location-specific, naturally difficult to precisely predict the availability of RE resource thereby making the energy generated variable, unpredictable and irregular and the availability of the resource inherently uncontrollable, which include plants utilizing wind, solar, run-of-river hydro or ocean energy.

Read the full instrument → · Open the chapter this section belongs to: CHAPTER VII →

Other provisions in CHAPTER VII

Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗ · Data as of 2026-07-04

CitationRA 9513 (Renewable Energy Act of 2008) Section 20 (LawPlayer, data as of 2026-07-04)

Source: Supreme Court E-Library, Republic of the Philippines. Philippine laws are public documents (works of the government).

What to look at next