My bookmarksSign up free

Commission Regulation (EU) 2019/554 of 5 April 2019 amending Annex VI to Directive 2007/59/EC of the European Parliament and of the Council on the certification of train drivers operating locomotives and trains on the railway system in the Community (Text with EEA relevance.)

Commission Regulation (EU) 2019/554 of 5 April 2019 amending Annex VI to Directive 2007/59/EC of the European Parliament and of the Council on the certification of train drivers operating locomotives and trains on the railway system in the Community (Text with EEA relevance.)

Regulation (EU) 2019/554 · Regulation · 2 articles

Data as of 2026-07-04 · Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗

Article 1

Point 8 of Annex VI to Directive 2007/59/EC is replaced by the following: ‘8.   LANGUAGE (1) Drivers who have to communicate with the infrastructure manager on critical safety issues must have the necessary language skills in at least one of the languages indicated by the infrastructure manager concerned. Their language skills must allow them to communicate actively and effectively in routine, degraded and emergency situations. They must be able to use the messages and communication method specified in the “Operations and traffic management” TSI. (2) In order to satisfy the requirements provided for in paragraph 1, drivers must be able to understand (both orally and in writing) and to communicate (both orally and in writing) according to level B1 of the Common European Framework of Reference for Languages (CEFR) established by the Council of Europe. (3) In case where the train operations take place in sections between the borders and the stations situated close to the borders and designated for cross border operations, drivers of trains operated by a railway undertaking may be exempted by the infrastructure manager from the requirements of paragraph 2, provided that the following procedure is applied: (a) the railway undertaking shall request the infrastructure manager for a derogation with regard to the concerned drivers. In order to ensure a fair and equal treatment of the applicants, the infrastructure manager shall apply to each submitted request for derogation the same assessment procedure, which shall be part of the network statement; (b) the infrastructure manager shall grant a derogation if the railway undertaking demonstrates that it has made sufficient arrangements for ensuring communication between the concerned drivers and the staff of the infrastructure manager in routine, degraded and emergency situations, as provided for in paragraph 1; (c) railway undertakings and infrastructure managers shall ensure that the concerned staff is aware of those rules and arrangements and receive appropriate training through their safety management systems. (4) One or several railway undertakings in cooperation with one or several infrastructure managers (“the applicants”) may carry out pilot projects to test alternative means of ensuring the effective communication required by paragraph 1. The following procedure shall apply: (a) the applicants shall identify the parts of the network and nature of the services concerned, the initial duration of the pilot project and in particular: i) specify the scope of the pilot project, ii) indicate what alternative language competences they propose to apply, iii) describe which additional tools they propose to use to support communication in routine, degraded and emergency situations, iv) demonstrate how the alternative language competences and additional tools ensure at least an equivalent level of safety to full compliance with the requirements of paragraph 1, when integrated in their respective Safety Management Systems  ( *1 ) , v) explain how they shall implement the pilot project in their Safety Management System, including training programs and documentation of the results, and vi) consult the representatives of the concerned staff in the process of preparing the application. (b) The applicants shall request the opinion of the concerned national safety authority/authorities that issued their single safety certificate(s) or safety authorisation(s), and of the European Union Agency for Railways, where it is the safety certification body (“the authorising entity or entities”). Each authorising entity shall issue an opinion on whether the alternative means ensure at least an equivalent level of safety to full compliance with the requirements of paragraph 1, within 60 days from the day the last authorising entity concerned has received the request. In case several authorising entities are involved, they are encouraged to work together and ensure coordination. The opinions shall assess in particular whether the following conditions are fulfilled: i) the proposed alternative language competences and other tools for communication are sufficient to ensure effective communication between the concerned drivers and the staff of the infrastructure manager in routine, degraded and emergency situations. ii) the safety management systems of the applicants have been adapted to using alternative language competences and other tools for communication. iii) the applicants have provided evidence that these tools have been tested under operational conditions involving drivers fulfilling the language requirements of paragraph 2. iv) all concerned staff of the railway undertaking and infrastructure manager have received appropriate training through their safety management systems. In the event of diverging opinions, the provisions of point (5) second subparagraph shall apply. (c) The applicants shall jointly submit to the Commission an application for derogation from paragraph 2, including the opinions of the authorising entity or entities and the detailed description of the pilot project on which the opinions are based. Alternatively, the participants in the project can designate a coordinator among them, who may submit the joint application on behalf of all participants in the project. (5) The Commission shall, within 60 days after receiving a complete application, grant a derogation from paragraph 2: (a) where the opinions of the authorising entity or entities are positive; and (b) where it is demonstrated that equal and non-discriminatory treatment of all applications as well as legal coherence at Union level is ensured. In the event of diverging opinions, or a failure of one or more authorising entities to deliver an opinion within the prescribed time limit, the applicants may request the Commission to find a mutually acceptable solution, in cooperation with the parties involved. If no mutually acceptable solution can be found within 90 days after receiving a request for derogation, the pilot project shall be deemed to be refused. The Commission may request the opinion of the European Union Agency for Railways, and shall do so where the opinion of each authorising entity is negative. (6) The derogation shall be granted for a limited period of time and shall not exceed 36 months. Where the derogation has been granted for a shorter period of time, it may be renewed provided that the total duration of 36 months is not exceeded. (7) On request by interested railway undertakings and where justified, an infrastructure manager shall offer other railway undertakings using a section of the network on which a pilot project is on-going, the possibility to participate in the pilot project subject to a positive opinion by the authorising entities concerned. Such additional participation shall be notified to the Commission by the infrastructure manager. In case of changes in the scope of the pilot projects, in particular the part of the network in which the project is carried out, the alternative language competences and the additional tools used for communication, the procedure described in point (4) shall apply. (8) The railway undertaking and infrastructure manager shall ensure that the operation of the pilot project is appropriately documented in their safety management systems. Records shall be kept for 24 months after the end of the pilot project, in particular of the staff involved, the training they have received, the services operated and any issues encountered during the pilot project. The concerned train drivers shall have the relevant information included in their complementary certificates. (9) After the end of each pilot project, the railway undertaking(s) and infrastructure manager(s) involved shall report to the authorising entities concerned. Where the duration of a derogation exceeds one year, the railway undertaking(s) and the infrastructure manager(s) shall report on a yearly basis within their annual safety reports according to Article 9(6) of Directive (EU) 2016/798. The national safety authorities concerned shall report the results of pilot projects in their annual reports according to Article 19 of Directive (EU) 2016/798. Based on a common framework for assessment, the European Union Agency for Railways shall analyse the results of the pilot projects and submit a report to the Commission. (10) The Commission may suspend the derogation granted if it considers that the conditions are no longer fulfilled or where safety concerns arise. A national safety authority, railway undertaking or infrastructure manager shall immediately inform the Commission in case any safety concerns arise. (11) The European Union Agency for Railways shall publish on its website a list of pilot projects authorised by the Commission, including a short description of the project and the period for which it is authorised as well as any other relevant information, such as discontinuation or suspension of the projects.

Article 2

This Regulation shall enter into force three months following the day of its publication in the Official Journal of the European Union .

Other acts of the same type
Commission Regulation (EU) 2021/1884 of 27 October 2021 amending Annex III to Regulation (EC) No 396/2005 of the European Parliament and of the Council as regards maximum residue levels for chlorantraniliprole in pulses (Text with EEA relevance)Commission Implementing Regulation (EU) 2021/1892 of 27 October 2021 amending Regulation (EC) No 1484/95 as regards fixing representative prices in the poultrymeat and egg sectors and for egg albuminCommission Implementing Regulation (EU) 2021/1900 of 27 October 2021 amending Implementing Regulation (EU) 2019/1793 on the temporary increase of official controls and emergency measures governing the entry into the Union of certain goods from certain third countries implementing Regulations (EU) 2017/625 and (EC) No 178/2002 of the European Parliament and of the Council (Text with EEA relevance)Commission Implementing Regulation (EU) 2021/1911 of 27 October 2021 amending Annex II to Implementing Regulation (EU) 2021/620 as regards the disease-free status of the Autonomous Community of Galicia and the Autonomous Community of Principado de Asturias in Spain from infection with Mycobacterium tuberculosis complex, amending Annex VIII thereto as regards the disease-free status of Autonomous Community of Islas Baleares, Huelva and Sevilla provinces and the regions of Azuaga, Badajoz, Mérida, Jerez de los Caballeros and Zafra in Badajoz province in Spain and Alentejo region and Santarém district in Lisboa e Vale do Tejo region in Portugal from infection with bluetongue virus, amending Annex IX thereto as regards the disease-free status of the Åland islands in Finland from infestation with Varroa spp and amending Annex XIII thereto as regards the disease-free status of Denmark and Finland regarding Infectious haematopoietic necrosis (Text with EEA relevance)Commission Delegated Regulation (EU) 2022/68 of 27 October 2021 amending Delegated Regulation (EU) 2019/934 supplementing Regulation (EU) No 1308/2013 of the European Parliament and of the Council as regards authorised oenological practicesCommission Implementing Regulation (EU) 2021/1880 of 26 October 2021 correcting the Polish language version of Implementing Regulation (EU) 2019/317 laying down a performance and charging scheme in the single European sky (Text with EEA relevance)Commission Regulation (EU) 2021/1881 of 26 October 2021 amending Annexes II and III to Regulation (EC) No 396/2005 of the European Parliament and of the Council as regards maximum residue levels for imidacloprid in or on certain products (Text with EEA relevance)Commission Regulation (EU) 2021/1891 of 26 October 2021 amending Annexes XIV and XV to Regulation (EU) No 142/2011 as regards imports into and transit through the Union of animal by-products and derived products (Text with EEA relevance)Commission Delegated Regulation (EU) 2022/516 of 26 October 2021 amending Annex IV to Council Regulation (EC) No 708/2007 concerning use of alien and locally absent species in aquacultureCommission Implementing Regulation (EU) 2021/1874 of 25 October 2021 correcting the German language versions of Regulation (EU) 2018/395 laying down detailed rules for the operation of balloons as well as for the flight crew licensing for balloons, and of Implementing Regulation (EU) 2018/1976 laying down detailed rules for the operation of sailplanes as well as for the flight crew licensing for sailplanesCommission Implementing Regulation (EU) 2021/1899 of 25 October 2021 entering a name in the register of protected designations of origin and protected geographical indications (‘Fertőd vidéki sárgarépa’ (PGI))Council Regulation (EU) 2021/1863 of 22 October 2021 amending Regulation (EC) No 1183/2005 imposing certain specific restrictive measures directed against persons acting in violation of the arms embargo with regard to the Democratic Republic of the Congo

Source: EUR-Lex (Publications Office of the EU), © European Union, reuse permitted under Commission Decision 2011/833/EU.

Contents

What to look at next