Regulation (EU) 2019/943 CHAPTER V — TRANSMISSION SYSTEM OPERATION

Article 28–Article 51 · 24 articles

Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗

European network of transmission system operators for electricity

Article 28

1.   Transmission system operators shall cooperate at Union level through the ENTSO for Electricity, in order to promote the completion and functioning of the internal market for electricity and cross-zonal trade and to ensure the optimal management, coordinated operation and sound technical evolution of the European electricity transmission network. 2.   In performing its functions under Union law, the ENTSO for Electricity shall act with a view to establishing a well-functioning and integrated internal market for electricity and shall contribute to the efficient and sustainable achievement of the objectives set out in the policy framework for climate and energy covering the period from 2020 to 2030, in particular by contributing to the efficient integration of electricity generated from renewable energy sources and to increases in energy efficiency while maintaining system security. The ENTSO for Electricity shall be equipped with adequate human and financial resources to carry out its duties.

The ENTSO for Electricity

Article 29

1.   The transmission system operators for electricity shall submit to the Commission and to ACER any draft amendments to the statutes, list of members or rules of procedure of the ENTSO for Electricity. 2.   Within two months of receipt of the draft amendments to the statutes, list of members or rules of procedure, ACER, after consulting the organisations representing all stakeholders, in particular the system users, including customers, shall provide an opinion to the Commission on these draft amendments to the statutes, list of members or rules of procedure. 3.   The Commission shall deliver an opinion on the draft amendments to the statutes, list of members or rules of procedures taking into account ACER's opinion as provided for in paragraph 2 and within three months of receipt of ACER's opinion. 4.   Within three months of receipt of the Commission's favourable opinion, the transmission system operators shall adopt and publish the amended statutes or rules of procedure. 5.   The documents referred to in paragraph 1 shall be submitted to the Commission and to ACER where there are changes thereto or upon the reasoned request of either of them. The Commission and ACER shall deliver an opinion in accordance with paragraphs 2, 3 and 4.

Tasks of the ENTSO for Electricity

Article 30

1.   The ENTSO for Electricity shall: (a) develop network codes in the areas set out in Article 59(1) and (2) with a view to achieving the objectives set out in Article 28; (b) adopt and publish a non-binding Union-wide ten-year network development plan, (‘Union-wide network development plan’), biennially; (c) prepare and adopt proposals related to the European resource adequacy assessment pursuant to Article 23 and proposals for the technical specifications for cross-border participation in capacity mechanisms pursuant to Article 26(11); (d) adopt recommendations relating to the coordination of technical cooperation between Union and third-country transmission system operators; (e) adopt a framework for the cooperation and coordination between regional coordination centres; (f) adopt a proposal defining the system operation region in accordance with Article 36; (g) cooperate with distribution system operators and the EU DSO entity; (h) promote the digitalisation of transmission networks including deployment of smart grids, efficient real time data acquisition and intelligent metering systems; (i) adopt common network operation tools to ensure coordination of network operation in normal and emergency conditions, including a common incident classification scale, and research plans, including the deployment of those plans through an efficient research programme. Those tools shall specify inter alia: (i) the information, including appropriate day-ahead, intraday and real-time information, useful for improving operational coordination, as well as the optimal frequency for the collection and sharing of such information; (ii) the technological platform for the exchange of information in real time and where appropriate, the technological platforms for the collection, processing and transmission of the other information referred to in point (i), as well as for the implementation of the procedures capable of increasing operational coordination between transmission system operators with a view to such coordination becoming Union-wide; (iii) how transmission system operators make available the operational information to other transmission system operators or any entity duly mandated to support them to achieve operational coordination, and to ACER; and (iv) that transmission system operators designate a contact point in charge of answering inquiries from other transmission system operators or from any entity duly mandated as referred to in point (iii), or from ACER concerning such information; (j) adopt an annual work programme; (k) contribute to the establishment of interoperability requirements and non-discriminatory and transparent procedures for accessing data as provided for in Article 24 of Directive (EU) 2019/944; (l) adopt an annual report; (m) carry out and adopt seasonal adequacy assessments pursuant to Article 9(2) of Regulation (EU) 2019/941; (n) promote cyber security and data protection in cooperation with relevant authorities and regulated entities; (o) take into account the development of demand response in fulfilling its tasks. 2.   The ENTSO for Electricity shall report to ACER on shortcomings identified regarding the establishment and performance of regional coordination centres. 3.   The ENTSO for Electricity shall publish the minutes of its assembly meetings, board meetings and committee meetings and provide the public with regular information on its decision-making and activities. 4.   The annual work programme referred to in point (j) of paragraph 1 shall contain a list and description of the network codes to be prepared, a plan on coordination of operation of the network, and research and development activities, to be realised in that year, and an indicative calendar. 5.   The ENTSO for Electricity shall provide ACER with the information that ACER requires to fulfil its tasks pursuant to Article 32(1). In order to enable the ENTSO for Electricity to meet that requirement, transmission system operators shall provide the ENTSO for Electricity with the requisite information. 6.   Upon request of the Commission, the ENTSO for Electricity shall give its views to the Commission on the adoption of the guidelines as laid down in Article 61.

Consultations

Article 31

1.   While preparing the proposals pursuant to the tasks referred to in Article 30(1), the ENTSO for Electricity shall conduct an extensive consultation process. The consultation process shall be structured in a way to enable the accommodation of stakeholder comments before the final adoption of the proposal and in an open and transparent manner, involving all relevant stakeholders, and, in particular, the organisations representing such stakeholders, in accordance with the rules of procedure referred to in Article 29. That consultation shall also involve regulatory authorities and other national authorities, supply and generation undertakings, system users including customers, distribution system operators, including relevant industry associations, technical bodies and stakeholder platforms. It shall aim at identifying the views and proposals of all relevant parties during the decision-making process. 2.   All documents and minutes of meetings related to the consultations referred to in paragraph 1 shall be made public. 3.   Before adopting the proposals referred to in Article 30(1) the ENTSO for Electricity shall indicate how the observations received during the consultation have been taken into consideration. It shall provide reasons where observations have not been taken into account.

Monitoring by ACER

Article 32

1.   ACER shall monitor the execution of the tasks of the ENTSO for Electricity referred to in Article 30(1), (2) and (3) and report its findings to the Commission. ACER shall monitor the implementation by the ENTSO for Electricity of network codes developed under Article 59. Where the ENTSO for Electricity has failed to implement such network codes, ACER shall request the ENTSO for Electricity to provide a duly reasoned explanation as to why it has failed to do so. ACER shall inform the Commission of that explanation and provide its opinion thereon. ACER shall monitor and analyse the implementation of the network codes and the guidelines adopted by the Commission as laid down in Article 58(1), and their effect on the harmonisation of applicable rules aimed at facilitating market integration as well as on non-discrimination, effective competition and the efficient functioning of the market, and report to the Commission. 2.   The ENTSO for Electricity shall submit the draft Union-wide network development plan, the draft annual work programme, including the information regarding the consultation process, and the other documents referred to in Article 30(1) to ACER for its opinion. Where it considers that the draft annual work programme or the draft Union-wide network development plan submitted by the ENTSO for Electricity does not contribute to non-discrimination, effective competition, the efficient functioning of the market or a sufficient level of cross-border interconnection open to third-party access, ACER shall provide a duly reasoned opinion as well as recommendations to the ENTSO for Electricity and to the Commission within two months of the submission.

Costs

Article 33

The costs related to the activities of the ENTSO for Electricity referred to in Articles 28 to 32 and 58 to 61 of this Regulation, and in Article 11 of Regulation (EU) No 347/2013 of the European Parliament and of the Council  ( 22 ) shall be borne by the transmission system operators and shall be taken into account in the calculation of tariffs. Regulatory authorities shall approve those costs only if they are reasonable and appropriate.

Regional cooperation of transmission system operators

Article 34

1.   Transmission system operators shall establish regional cooperation within the ENTSO for Electricity to contribute to the activities referred to in Article 30(1), (2) and (3). In particular, they shall publish a regional investment plan biennially, and may take investment decisions based on that regional investment plan. The ENTSO for Electricity shall promote cooperation between transmission system operators at regional level ensuring interoperability, communication and monitoring of regional performance in those areas which have not yet been harmonised at Union level. 2.   Transmission system operators shall promote operational arrangements in order to ensure the optimum management of the network and shall promote the development of energy exchanges, the coordinated allocation of cross-border capacity through non-discriminatory market-based solutions, paying due attention to the specific merits of implicit auctions for short-term allocations, and the integration of balancing and reserve power mechanisms. 3.   For the purposes of achieving the goals set in paragraphs 1 and 2, the geographical area covered by each regional cooperation structure may be established by the Commission, taking into account existing regional cooperation structures. Each Member State may promote cooperation in more than one geographical area. The Commission is empowered to adopt delegated acts in accordance with Article 68, supplementing this Regulation, establishing the geographical area covered by each regional cooperation structure. For that purpose, the Commission shall consult the regulatory authorities, ACER and the ENTSO for Electricity. The delegated acts referred to in this paragraph shall be without prejudice to Article 36.

Establishment and mission of regional coordination centres

Article 35

1.   By 5 July 2020, all transmission system operators of a system operation region shall submit a proposal for the establishment of regional coordination centres to the regulatory authorities concerned in accordance with the criteria set out in this Chapter. The regulatory authorities of the system operation region shall review and approve the proposal. The proposal shall at least include the following elements: (a) the Member State of the prospective seat of the regional coordination centres and the participating transmission system operators; (b) the organisational, financial and operational arrangements necessary to ensure the efficient, secure and reliable operation of the interconnected transmission system; (c) an implementation plan for the entry into operation of the regional coordination centres; (d) the statutes and rules of procedure of the regional coordination centres; (e) a description of cooperative processes in accordance with Article 38; (f) a description of the arrangements concerning the liability of the regional coordination centres in accordance with Article 47; (g) where two regional coordination centres are maintained on a rotational basis in accordance with Article 36(2), a description of the arrangements to provide clear responsibilities to those regional coordination centres and procedures on the execution of their tasks. 2.   Following approval by regulatory authorities of the proposal in paragraph 1, the regional coordination centres shall replace the regional security coordinators established pursuant to the system operation guideline adopted on the basis of Article 18(5) of Regulation (EC) No 714/2009 and shall enter into operation by 1 July 2022. 3.   Regional coordination centres shall have a legal form referred to in Annex II to Directive (EU) 2017/1132 of the European Parliament and of the Council  ( 23 ) . 4.   In performing their tasks under Union law, regional coordination centres shall act independently of individual national interests and independently of the interests of transmission system operators. 5.   Regional coordination centres shall complement the role of transmission system operators by performing the tasks of regional relevance assigned to them in accordance with Article 37. Transmission system operators shall be responsible for managing electricity flows and ensuring a secure, reliable and efficient electricity system in accordance with point (d) of Article 40(1) of Directive (EU) 2019/944.

Geographical scope of regional coordination centres

Article 36

1.   By 5 January 2020 the ENTSO for Electricity shall submit to ACER a proposal specifying which transmission system operators, bidding zones, bidding zone borders, capacity calculation regions and outage coordination regions are covered by each of the system operation regions. The proposal shall take into account the grid topology, including the degree of interconnection and of interdependency of the electricity system in terms of flows and the size of the region which shall cover at least one capacity calculation region. 2.   The transmission system operators of a system operation region shall participate in the regional coordination centre established in that region. In exceptional circumstances, where the control area of a transmission system operator is part of various synchronous areas, the transmission system operator may participate in two regional coordination centres. For the bidding zone borders adjacent to system operation regions, the proposal in paragraph 1 shall specify how the coordination between regional coordination centres for those borders is to take place. For the Continental Europe synchronous area, where the activities of two regional coordination centres may overlap in a system operation region, the transmission system operators of that system operation region shall decide to either designate a single regional coordination centre in that region or that the two regional coordination centres carry out some or all of the tasks of regional relevance in the entire system operation region on a rotational basis while other tasks are carried out by a single designated regional coordination centre. 3.   Within three months of receipt of the proposal in paragraph 1, ACER shall either approve the proposal defining the system operation regions or propose amendments. In the latter case, ACER shall consult the ENTSO for Electricity before adopting the amendments. The adopted proposal shall be published on ACER's website. 4.   The relevant transmission system operators may submit a proposal to ACER for the amendment of system operation regions defined pursuant to paragraph 1. The process set out in paragraph 3 shall apply.

Tasks of regional coordination centres

Article 37

1.   Each regional coordination centre shall carry out at least all the following tasks of regional relevance in the entire system operation region where it is established: (a) carrying out the coordinated capacity calculation in accordance with the methodologies developed pursuant to the capacity allocation and congestion management guideline adopted on the basis of Article 18(5) of Regulation (EC) No 714/2009; (b) carrying out the coordinated security analysis in accordance with the methodologies developed pursuant to the system operation guideline adopted on the basis of Article 18(5) of Regulation (EC) No 714/2009; (c) creating common grid models in accordance with the methodologies and procedures developed pursuant to the system operation guideline adopted on the basis of Article 18(5) of Regulation (EC) No 714/2009; (d) supporting the consistency assessment of transmission system operators' defence plans and restoration plans in accordance with the procedure set out in the emergency and restoration network code adopted on the basis of Article 6(11) of Regulation (EC) No 714/2009; (e) carrying out regional week ahead to at least day-ahead system adequacy forecasts and preparation of risk reducing actions in accordance with the methodology set out in Article 8 of Regulation (EU) 2019/941 and the procedures set out in the system operation guideline adopted on the basis of Article 18(5) of Regulation (EC) No 714/2009; (f) carrying out regional outage planning coordination in accordance with the procedures and methodologies set out in the system operation guideline adopted on the basis of Article 18(5) of Regulation (EC) No 714/2009; (g) training and certification of staff working for regional coordination centres; (h) supporting the coordination and optimisation of regional restoration as requested by transmission system operators; (i) carrying out post-operation and post-disturbances analysis and reporting; (j) regional sizing of reserve capacity; (k) facilitating the regional procurement of balancing capacity; (l) supporting transmission system operators, at their request, in the optimisation of inter-transmission system operators settlements; (m) carrying out tasks related to the identification of regional electricity crisis scenarios if and to the extent they are delegated to the regional coordination centres pursuant to Article 6(1) of Regulation (EU) 2019/941; (n) carrying out tasks related to the seasonal adequacy assessments if and to the extent that they are delegated to the regional coordination centres pursuant to Article 9(2) of Regulation (EU) 2019/941; (o) calculating the value for the maximum entry capacity available for the participation of foreign capacity in capacity mechanisms for the purposes of issuing a recommendation pursuant to Article 26(7); (p) carrying out tasks related to supporting transmission system operators in the identification of needs for new transmission capacity, for upgrade of existing transmission capacity or their alternatives, to be submitted to the regional groups established pursuant to Regulation (EU) No 347/2013 and included in the ten-year network development plan referred to in Article 51 of Directive (EU) 2019/944. The tasks referred to in the first subparagraph are set out in more detail in Annex I. 2.   On the basis of a proposal by the Commission or a Member State, the Committee established by Article 68 of Directive (EU) 2019/944 shall issue an opinion on the assignment of new advisory tasks to regional coordination centres. Where that Committee issues a favourable opinion on the assignment of new advisory tasks, the regional coordination centres shall carry out those tasks on the basis of a proposal developed by the ENTSO for Electricity and approved by ACER in accordance with the procedure set out in Article 27. 3.   Transmission system operators shall provide their regional coordination centres with the information necessary to carry out its tasks. 4.   Regional coordination centres shall provide transmission system operators of the system operation region with all information necessary to implement the coordinated actions and recommendations issued by regional coordination centres. 5.   For the tasks set out in this Article and not already covered by the relevant network codes or guidelines, the ENTSO for Electricity shall develop a proposal in accordance with the procedure set out in Article 27. Regional coordination centres shall carry out those tasks on the basis of the proposal following its approval by ACER.

Cooperation within and between regional coordination centres

Article 38

The day-to-day coordination within and between regional coordination centres shall be managed through cooperative processes among the transmission system operators of the region, including arrangements for coordination between regional coordination centres where relevant. The cooperative process shall be based on: (a) working arrangements to address planning and operational aspects relevant to the tasks referred to in Article 37; (b) a procedure for sharing analysis and consulting on regional coordination centres' proposals with the transmission system operators in the system operation region and relevant stakeholders and with other regional coordination centres, in an efficient and inclusive manner, in the exercise of the operational duties and tasks, in accordance with Article 40; (c) a procedure for the adoption of coordinated actions and recommendations in accordance with Article 42.

Working arrangements

Article 39

1.   Regional coordination centres shall develop working arrangements that are efficient, inclusive, transparent and facilitate consensus, in order to address planning and operational aspects related to the tasks to be carried out, taking into account, in particular, the specificities and requirements of those tasks as specified in Annex I. Regional coordination centres shall also develop a process for the revision of those working arrangements. 2.   Regional coordination centres shall ensure that the working arrangements referred to in paragraph 1 contain rules for the notification of parties concerned.

Consultation procedure

Article 40

1.   Regional coordination centres shall develop a procedure to organise, in the exercise of their daily operational duties and tasks, the appropriate and regular consultation of transmission system operators in the system operation region, other regional coordination centres and of relevant stakeholders. In order to ensure that regulatory issues can be addressed, regulatory authorities shall be involved when required. 2.   Regional coordination centres shall consult the Member States in the system operation region and, where there is a regional forum, their regional forums on matters of political relevance excluding the day-to-day activities of regional coordination centres and the implementation of their tasks. Regional coordination centres shall take due account of the recommendations of the Member States and where applicable, of their regional forums.

Transparency

Article 41

1.   Regional coordination centres shall develop a process for stakeholder involvement and shall organise regular meetings with stakeholders to discuss matters relating to the efficient, secure and reliable operation of the interconnected system and to identify shortcomings and propose improvements. 2.   The ENTSO for Electricity and regional coordination centres shall operate in full transparency towards stakeholders and the general public. They shall publish all relevant documentation on their respective websites.

Adoption and review of coordinated actions and recommendations

Article 42

1.   The transmission system operators in a system operation region shall develop a procedure for the adoption and revision of coordinated actions and recommendations issued by regional coordination centres in accordance with the criteria set out in paragraphs 2, 3, and 4. 2.   Regional coordination centres shall issue coordinated actions to the transmission system operators in respect of the tasks referred to in points (a) and (b) of Article 37(1). Transmission system operators shall implement the coordinated actions except where the implementation of the coordinated actions would result in a violation of the operational security limits defined by each transmission system operator in accordance with the system operation guideline adopted on the basis of Article 18(5) of Regulation (EC) No 714/2009. Where a transmission system operator decides not to implement a coordinated action for the reasons set out in this paragraph, it shall transparently report the detailed reasons to the regional coordination centre and the transmission system operators of the system operation region without undue delay. In such cases, the regional coordination centre shall assess the impact of that decision on the other transmission system operators of the system operation region and may propose a different set of coordinated actions subject to the procedure set out in paragraph 1. 3.   Regional coordination centres shall issue recommendations to the transmission system operators in relation to the tasks listed in points (c) to (p) of Article 37(1) or assigned in accordance with Article 37(2). Where a transmission system operator decides to deviate from a recommendation as referred to in paragraph 1, it shall submit a justification for its decision to regional coordination centres and to the other transmission system operators of the system operation region without undue delay. 4.   The review of coordinated actions or a recommendation shall be triggered at the request of one or more of the transmission system operators of the system operation region. Following the review of the coordinated action or recommendation, regional coordination centres shall confirm or modify the measure. 5.   Where a coordinated action is subject to review in accordance with paragraph 4 of this Article, the request for review shall not suspend the coordinated action except where the implementation of the coordinated action would result in a violation of the operational security limits defined by each individual transmission system operator in accordance with the system operation guideline adopted on the basis of Article 18(5) of Regulation (EC) No 714/2009. 6.   Upon the proposal of a Member State or the Commission and following consultation with the Committee established by Article 68 of Directive (EU) 2019/944, the Member States in a system operation region may jointly decide to grant the competence to issue coordinated actions to their regional coordination centre for one or more of the tasks provided for in points (c) to (p) of Article 37(1) of this Regulation.

Management board of regional coordination centres

Article 43

1.   In order to adopt measures related to their governance and to monitor their performance, the regional coordination centres shall establish a management board. 2.   The management board shall be composed of members representing all the transmission system operators that participate in the relevant regional coordination centre. 3.   The management board shall be responsible for: (a) drafting and endorsing the statutes and rules of procedure of regional coordination centres; (b) deciding upon and implementing the organisational structure; (c) preparing and endorsing the annual budget; (d) developing and endorsing the cooperative processes in accordance with Article 38. 4.   The competences of the management board shall exclude those that are related to the day-to-day activities of regional coordination centres and the performance of its tasks.

Organisational structure

Article 44

1.   The transmission system operators of a system operation region shall establish the organisational structure of regional coordination centres that supports the safety of their tasks. Their organisational structure shall specify: (a) the powers, duties and responsibilities of the personnel; (b) the relationship and reporting lines between different parts and processes of the organisation. 2.   Regional coordination centres may establish regional desks to address sub-regional specificities or establish back-up regional coordination centres for the efficient and reliable exercise of their tasks where proven to be strictly necessary.

Equipment and staff

Article 45

Regional coordination centres shall be equipped with all human, technical, physical and financial resources necessary for fulfilling their obligations under this Regulation and carrying out their tasks independently and impartially.

Monitoring and reporting

Article 46

1.   Regional coordination centres shall establish a process for the continuous monitoring of at least: (a) their operational performance; (b) the coordinated actions and recommendations issued, the extent to which the coordinated actions and recommendations have been implemented by the transmission system operators and the outcome achieved; (c) the effectiveness and efficiency of each of the tasks for which they are responsible and, where applicable, the rotation of those tasks. 2.   Regional coordination centres shall account for their costs in a transparent manner and report them to ACER and to the regulatory authorities in the system operation region. 3.   Regional coordination centres shall submit an annual report on the outcome of the monitoring provided for in paragraph 1 and information on their performance to the ENTSO for Electricity, ACER, the regulatory authorities in the system operation region and the Electricity Coordination Group. 4.   Regional coordination centres shall report any shortcomings that they identify in the monitoring process under paragraph 1 to the ENTSO for Electricity, the regulatory authorities in the system operation region, ACER and the other competent authorities of Member States responsible for the prevention and management of crisis situations. On the basis of that report, the relevant regulatory authorities of the system operation region may propose measures to address the shortcomings to the regional coordination centres. 5.   Without prejudice to the need to protect security and the confidentiality of commercially sensitive information, regional coordination centres shall make public the reports referred to in paragraphs 3 and 4.

Liability

Article 47

In proposals for the establishment of regional coordination centres in accordance with Article 35, the transmission system operators in the system operation region shall include the necessary steps to cover liability related to the execution of regional coordination centres' tasks. The method employed to provide the cover shall take into account the legal status of regional coordination centres and the level of commercial insurance cover available.

Ten-year network development plan

Article 48

1.   The Union-wide network development plan referred to under point (b) of Article 30(1) shall include the modelling of the integrated network, scenario development and an assessment of the resilience of the system. The Union-wide network development plan shall, in particular: (a) build on national investment plans, taking into account regional investment plans as referred to in Article 34(1) of this Regulation, and, if appropriate, Union aspects of network planning as set out in Regulation (EU) No 347/2013; it shall be subject to a cost-benefit analysis using the methodology established as set out in Article 11 of that Regulation; (b) regarding cross-border interconnections, also build on the reasonable needs of different system users and integrate long-term commitments from investors referred to in Articles 44 and 51 of Directive (EU) 2019/944; and (c) identify investment gaps, in particular with respect to cross-border capacities. In regard to point (c) of the first subparagraph, a review of barriers to the increase of cross-border capacity of the network arising from different approval procedures or practices may be annexed to the Union–wide network development plan. 2.   ACER shall provide an opinion on the national ten-year network development plans to assess their consistency with the Union–wide network development plan. If ACER identifies inconsistencies between a national ten-year network development plan and the Union–wide network development plan, it shall recommend amending the national ten-year network development plan or the Union–wide network development plan as appropriate. If such a national ten-year network development plan is developed in accordance with Article 51 of Directive (EU) 2019/944, ACER shall recommend that the regulatory authority amend the national ten-year network development plan in accordance with Article 51(7) of that Directive and inform the Commission thereof.

Inter-transmission system operator compensation mechanism

Article 49

1.   Transmission system operators shall receive compensation for costs incurred as a result of hosting cross-border flows of electricity on their networks. 2.   The compensation referred to in paragraph 1 shall be paid by the operators of national transmission systems from which cross-border flows originate and the systems where those flows end. 3.   Compensation payments shall be made on a regular basis with regard to a given period in the past. Ex-post adjustments of compensation paid shall be made where necessary, to reflect costs actually incurred. The first period for which compensation payments are to be made shall be determined in the guidelines referred to in Article 61. 4.   The Commission shall adopt delegated acts in accordance with Article 68, supplementing this Regulation, establishing the amounts of compensation payments payable. 5.   The magnitude of cross-border flows hosted and the magnitude of cross-border flows designated as originating or ending in national transmission systems shall be determined on the basis of the physical flows of electricity actually measured during a given period. 6.   The costs incurred as a result of hosting cross-border flows shall be established on the basis of the forward-looking long-run average incremental costs, taking into account losses, investment in new infrastructure, and an appropriate proportion of the cost of existing infrastructure, in so far as such infrastructure is used for the transmission of cross-border flows, in particular taking into account the need to guarantee security of supply. When establishing the costs incurred, recognised standard-costing methodologies shall be used. Benefits that a network incurs as a result of hosting cross-border flows shall be taken into account to reduce the compensation received. 7.   For the purpose of the inter-transmission system operator compensation mechanism only, where transmission networks of two or more Member States form part, in whole or in part, of a single control block, the control block as a whole shall be considered as forming part of the transmission network of one of the Member States concerned, in order to avoid flows within control blocks being considered as cross-border flows under point (b) of Article 2(2) and giving rise to compensation payments under paragraph 1 of this Article. The regulatory authorities of the Member States concerned may decide which of the Member States concerned shall be that of which the control block as a whole is to be considered to form part.

Provision of information

Article 50

1.   Transmission system operators shall put in place coordination and information exchange mechanisms to ensure the security of the networks in the context of congestion management. 2.   The safety, operational and planning standards used by transmission system operators shall be made public. The information published shall include a general scheme for the calculation of the total transfer capacity and the transmission reliability margin based upon the electrical and physical features of the network. Such schemes shall be subject to approval by the regulatory authorities. 3.   Transmission system operators shall publish estimates of available transfer capacity for each day, indicating any available transfer capacity already reserved. Those publications shall be made at specified intervals before the day of transport and shall include, in any event, week-ahead and month-ahead estimates, as well as a quantitative indication of the expected reliability of the available capacity. 4.   Transmission system operators shall publish relevant data on aggregated forecast and actual demand, on availability and actual use of generation and load assets, on availability and use of the networks and interconnections, on balancing power and reserve capacity and on the availability of flexibility. For the availability and actual use of small generation and load assets, aggregated estimate data may be used. 5.   The market participants concerned shall provide the transmission system operators with the relevant data. 6.   Generation undertakings which own or operate generation assets, where at least one generation asset has an installed capacity of at least 250 MW, or which have a portfolio comprising at least 400 MW of generation assets, shall keep at the disposal of the regulatory authority, the national competition authority and the Commission, for five years all hourly data per plant that is necessary to verify all operational dispatching decisions and the bidding behaviour at power exchanges, interconnection auctions, reserve markets and over-the-counter-markets. The per-plant and per hour information to be stored shall include, but shall not be limited to, data on available generation capacity and committed reserves, including allocation of those committed reserves on a per-plant level, at the times the bidding is carried out and when production takes place. 7.   Transmission system operators shall exchange regularly a set of sufficiently accurate network and load flow data in order to enable load flow calculations for each transmission system operator in its relevant area. The same set of data shall be made available to the regulatory authorities, and to the Commission and Member States upon request. The regulatory authorities, Member States and the Commission shall treat that set of data confidentially, and shall ensure that confidential treatment is also given by any consultant carrying out analytical work on their request, on the basis of those data.

Certification of transmission system operators

Article 51

1.   The Commission shall examine any notification of a decision on the certification of a transmission system operator as laid down in Article 52(6) of Directive (EU) 2019/944 as soon as it is received. Within two months of receipt of such notification, the Commission shall deliver its opinion to the relevant regulatory authority as to its compatibility with Article 43 and either Article 52(2) or Article 53 of Directive (EU) 2019/944. When preparing the opinion referred to in the first subparagraph, the Commission may request ACER to provide its opinion on the regulatory authority's decision. In such a case, the two-month period referred to in the first subparagraph shall be extended by two further months. In the absence of an opinion by the Commission within the periods referred to in the first and second subparagraphs, the Commission shall be considered not to raise objections to the regulatory authority's decision. 2.   Within two months of receipt of an opinion of the Commission, the regulatory authority shall adopt its final decision regarding the certification of the transmission system operator, taking the utmost account of that opinion. The regulatory authority's decision and the Commission's opinion shall be published together. 3.   At any time during the procedure, regulatory authorities or the Commission may request from a transmission system operator or an undertaking performing any of the functions of generation or supply any information relevant to the fulfilment of their tasks under this Article. 4.   Regulatory authorities and the Commission shall protect the confidentiality of commercially sensitive information. 5.   Where the Commission has received notification of the certification of a transmission system operator under Article 43(9) of Directive (EU) 2019/944, the Commission shall take a decision relating to certification. The regulatory authority shall comply with the Commission decision.

Back to Regulation (EU) 2019/943 — full text

Articles on this page are reproduced verbatim from official open data. See the attribution line.

Source: EUR-Lex (Publications Office of the EU), © European Union, reuse permitted under Commission Decision 2011/833/EU.