My bookmarksSign up free
Source

Commission Implementing Decision (EU) 2022/2324 of 23 November 2022 amending Decision 2008/294/EC, to include additional access technologies and measures for the operation of mobile communications services on aircraft (MCA services) in the Union (notified under document C(2022) 8321) (Text with EEA relevance)

Commission Implementing Decision (EU) 2022/2324 of 23 November 2022 amending Decision 2008/294/EC, to include additional access technologies and measures for the operation of mobile communications services on aircraft (MCA services) in the Union (notified under document C(2022) 8321) (Text with EEA relevance)

Implementing Decision (EU) 2022/2324 · Decision · 4 articles

Data as of 2026-07-04 · Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗

Article 1

Open ↗

The Annex to Decision 2008/294/EC is replaced by the text in the Annex to this Decision.

Article 2

Open ↗

As early as possible, and in any case by 30 June 2023, the Member States shall make the frequency bands for 5G non-AAS indicated in Table 1 in the Annex available for MCA services on a non-interference and non-protected basis, provided such services meet the conditions set out in the Annex.

Supplementary provisions

ANNEXSupplementary provisions

Open ↗

ANNEX 1.    Frequency bands and systems allowed for MCA Services Table 1 Type Frequency System GSM 1 800 1 710 -1 785 MHz (uplink) 1 805 -1 880 MHz (downlink) GSM complying with the GSM standards as published by ETSI, in particular EN 301 502, EN 301 511 and EN 302 480, or equivalent specifications. UMTS 2 100 (FDD) 1 920 -1 980 MHz (uplink) 2 110 -2 170 MHz (downlink) UMTS complying with the UMTS standards as published by ETSI, in particular EN 301 908-1 EN 301 908-2, EN 301 908-3 and EN 301 908-11, or equivalent specifications. LTE 1 800 (FDD) 1 710 -1 785 MHz (uplink) 1 805 -1 880 MHz (downlink) LTE complying with LTE standards, as published by ETSI, in particular EN 301 908-1, EN 301 908-13, EN 301 908-14, and EN 301 908-15, or equivalent specifications. 5G NR non-AAS 1 710 -1 785 MHz (uplink)1 805 -1 880 MHz (downlink) 5G NR non-AAS complying with the 5G NR standards as published by ETSI, in particular EN 301 908-24 and EN 301 908-25, or equivalent specifications. 2.    Prevention of connection of mobile terminals to ground networks (a) Until 1 January 2026, mobile terminals receiving within the frequency bands and systems listed in Table 2 must be prevented from attempting to register with UMTS mobile networks on the ground: — by the inclusion, in the MCA system, of a network control unit (NCU), which raises the noise floor inside the cabin in mobile receive bands, and/or — by aircraft fuselage shielding to further attenuate the signal entering and leaving the fuselage. Table 2 Frequency bands (MHz) Systems on the ground 925 -960 MHz UMTS 2 110 -2 170 MHz UMTS After this date, MCA operators may decide to continue implementing an NCU in the frequency bands and systems listed in Table 2. (b) In addition to the provisions in paragraph a), MCA operators may decide to implement an NCU for terrestrial systems providing electronic communications services in the frequency bands listed in Table 3. Table 3 Frequency bands (MHz) 460 -470 MHz 791 -821 MHz 925 -960 MHz 1 805 -1 880 MHz 2 110 -2 170 MHz 2 620 -2 690 MHz 2 570 -2 620 MHz 3.    Technical parameters (a) Equivalent isotropic radiated power (EIRP) limits, outside the aircraft, resulting from the NCU/aircraft Base Station (BS) Table 4 Height above ground (m) Maximum EIRP outside the aircraft in dBm/(channel bandwidth) NCU  ( 1 ) Aircraft GSM and LTE BS Aircraft 5G NR non-AAS BS Aircraft UMTS BS and NCU Band: 900 MHz Band: 1 800 MHz Band: 1 800 MHz Band: 2 100 MHz Channel Bandwidth = 3,84 MHz Channel Bandwidth = 200 kHz  ( 2 ) Channel Bandwidth = 5 MHz  ( 3 ) Channel Bandwidth = 3,84 MHz 3 000 -6,2 -13,0 10 1,0 4 000 -3,7 -10,5 13 3,5 5 000 -1,7 -8,5 15 5,4 6 000 -0,1 -6,9 16 7,0 7 000 1,2 -5,6 18 8,3 8 000 2,3 -4,4 19 9,5 (b) EIRP limits outside the aircraft, resulting from the mobile terminal operating on board Table 5 Height above ground Maximum EIRP, outside the aircraft, from the GSM mobile terminal in dBm/200 kHz Maximum EIRP, outside the aircraft, from the LTE mobile terminal in dBm/5 MHz  ( 4 ) Maximum EIRP, outside the aircraft, from the LTE and 5G NR mobile terminal in dBm/5 MHz  ( 5 )  ( 6 )  ( 7 ) Maximum EIRP, outside the aircraft, from the UMTS mobile terminal in dBm/3,84 MHz (m) GSM 1 800 MHz LTE 1 800 MHz LTE and 5G NR 1 800 MHz UMTS 2 100 MHz 3 000 -3,3 1,7 0 3,1 4 000 -1,1 3,9 2 5,6 5 000 0,5 5 4 7 6 000 1,8 5 6 7 7 000 2,9 5 7 7 8 000 3,8 5 8 7 (c) EIRP limits outside the aircraft, resulting from the NCU, in other relevant frequency bands When MCA operators decide to use an NCU to prevent mobile terminals from attempting to register with non UMTS mobile networks on the ground in the frequency bands listed in Table 3, the maximum values indicated in Table 6 apply for the total EIRP outside the aircraft, resulting from the NCU, in conjunction with the values mentioned in Table 4. Table 6 Height above ground (m) Maximum EIRP outside the aircraft, resulting from the NCU 460 -470 MHz 791 -821 MHz 1 805 -1 880 MHz 2 570 -2 690 MHz dBm/1,25 MHz dBm/10 MHz dBm/200 kHz dBm/4,75 MHz 3 000 -17,0 -0,87 -13,0 1,9 4 000 -14,5 1,63 -10,5 4,4 5 000 -12,6 3,57 -8,5 6,3 6 000 -11,0 5,15 -6,9 7,9 7 000 -9,6 6,49 -5,6 9,3 8 000 -8,5 7,65 -4,4 10,4 (d) Operational requirements (1) The minimum height above ground for any transmission from an MCA system in operation must be 3 000 metres. (2) The aircraft Base Station, while in operation, must limit the transmit power of all GSM mobile terminals transmitting in the 1 800 MHz band to a nominal value of 0 dBm/200 kHz at all stages of communication, including initial access. (3) The aircraft Base Station, while in operation, must limit the transmit power of all LTE mobile terminals transmitting in the 1 800 MHz band to a nominal value of 5 dBm/5 MHz at all stages of communication. (4) The aircraft Base Station, while in operation, must limit the transmit power of all UMTS mobile terminals transmitting in the 2 100 MHz band to a nominal value of -6 dBm/3,84 MHz at all stages of communication and the maximum number of users should not exceed 20. (5) The aircraft Base Station, during operation, must limit the transmit power of all 5G NR mobile terminals transmitting in the 1 800 MHz band to a nominal value of 5 dBm/channel at all stages of communication, including initial access. ( 1 )   The aircraft BS is not in operation at 900 MHz, however, an NCU is needed to prevent terminals using other MCA channels from connecting to the 900 MHz UMTS terrestrial networks. ( 2 )   For channel bandwidth other than 200 kHz, a correction, calculated by the formula 10 × log10 (channel bandwidth/(200 kHz)) dB, shall be added to the EIRP values. ( 3 )   For channel bandwidth other than 5 MHz, a correction, calculated by the formula 10 × log10 (channel bandwidth/(5 MHz)) dB, shall be added to the EIRP values. ( 4 )   These conditions apply to the operation of MCA systems installed until 31 December 2022. ( 5 )   These conditions apply to the operation of MCA systems installed after 31 December 2022. ( 6 )   For channel bandwidth other than 5 MHz, a correction, calculated by the formula 10 × log10 (channel bandwidth/5 MHz) dB, shall be added to the EIRP values. ( 7 )   The EIRP is specified per channel regardless of the used channel bandwidth due to the fact that multiple mobile terminals could be operated.

Other acts of the same type
Council Decision (CFSP) 2026/1105 of 18 May 2026 amending Decision 2013/255/CFSP concerning restrictive measures in view of the situation in SyriaCouncil Implementing Decision (CFSP) 2026/1106 of 18 May 2026 implementing Decision 2013/255/CFSP concerning restrictive measures in view of the situation in SyriaCouncil Decision (EU) 2026/1132 of 18 May 2026 on the signing, on behalf of the European Union, of the Protocol amending the Council of Europe Convention on the Prevention of TerrorismCouncil Decision (EU) 2026/1133 of 18 May 2026 on the conclusion, on behalf of the Union, of the Air Transport Agreement between the United States of America, of the first part, the European Union and its Member States, of the second part, Iceland, of the third part, and the Kingdom of Norway, of the fourth part; and on the conclusion, on behalf of the Union, of the Ancillary Agreement between the European Union and its Member States, of the first part, Iceland, of the second part, and the Kingdom of Norway, of the third part, on the application of the Air Transport Agreement between the United States of America, of the first part, the European Union and its Member States, of the second part, Iceland, of the third part, and the Kingdom of Norway, of the fourth partCouncil Decision (EU) 2026/1138 of 18 May 2026 authorising the opening of negotiations for an agreement between the Union and the Council of Europe Development Bank on the conditions for the Union’s membershipCommission Implementing Decision (EU) 2026/1108 of 13 May 2026 concerning certain emergency measures relating to sheep pox and goat pox in Romania and repealing Implementing Decision (EU) 2026/1015 and Implementing Decision (EU) 2025/2415 (notified under document C(2026) 3323)Commission Implementing Decision (EU) 2026/1053 of 12 May 2026 rejecting an application for registration of a geographical indication in accordance with Article 21(1) of Regulation (EU) 2024/1143 of the European Parliament and of the Council (Geyve Ayvası (PDO)) (notified under document C(2026) 3012)Council Decision (EU) 2026/1069 of 12 May 2026 on the position to be taken on behalf of the European Union vis-à-vis the United Kingdom of Great Britain and Northern Ireland regarding the determination under Article 540(2) of the Trade and Cooperation Agreement between the European Union and the European Atomic Energy Community, of the one part, and the United Kingdom of Great Britain and Northern Ireland, of the other part, of the date from which personal data relating to vehicle registration data as referred to in Article 537 of that Agreement may be supplied by Member States to the United KingdomCouncil Decision (CFSP) 2026/1082 of 12 May 2026 on an assistance measure under the European Peace Facility to support the Armed Forces of Bosnia and HerzegovinaCouncil Decision (CFSP) 2026/1084 of 12 May 2026 amending Decision (CFSP) 2021/1143 on a European Union Military Assistance Mission in Mozambique (EUMAM Mozambique)Commission Implementing Decision (EU) 2026/1091 of 12 May 2026 amending the Annex to Implementing Decision (EU) 2023/2447 concerning emergency measures in relation to outbreaks of highly pathogenic avian influenza in certain Member States (notified under document C(2026) 3267)Political and Security Committee Decision (CFSP) 2026/1093 of 12 May 2026 on the appointment of the Head of Mission of the European Union CSDP mission in Mali (EUCAP Sahel Mali) (EUCAP Sahel Mali/1/2026)

Source: EUR-Lex (Publications Office of the EU), © European Union, reuse permitted under Commission Decision 2011/833/EU.

Contents

What to look at next