My bookmarksSign up free
Source

Commission Implementing Regulation (EU) 2023/868 of 27 April 2023 amending Annexes V and XIV to Implementing Regulation (EU) 2021/404 as regards the entries for Canada, Chile, the United Kingdom and the United States in the lists of third countries authorised for the entry into the Union of consignments of poultry, germinal products of poultry and fresh meat of poultry and game birds (Text with EEA relevance)

Commission Implementing Regulation (EU) 2023/868 of 27 April 2023 amending Annexes V and XIV to Implementing Regulation (EU) 2021/404 as regards the entries for Canada, Chile, the United Kingdom and the United States in the lists of third countries authorised for the entry into the Union of consignments of poultry, germinal products of poultry and fresh meat of poultry and game birds (Text with EEA relevance)

Implementing Regulation (EU) 2023/868 · Regulation · 3 articles

Data as of 2026-07-04 · Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗

Article 1

Open ↗

Annexes V and XIV to Implementing Regulation (EU) 2021/404 are amended in accordance with the Annex to this Regulation.

Article 2

Open ↗

This Regulation shall enter into force on the day following that of its publication in the Official Journal of the European Union .

Supplementary provisions

ANNEXSupplementary provisions

Open ↗

ANNEX Annexes V and XIV to Implementing Regulation (EU) 2021/404 are amended as follows: (1) Annex V is amended as follows: (a) in Part 1, Section B is amended as follows: (i) in the entry for Canada, the rows for the zones CA-2.39 and CA-2.40 are replaced by the following: ‘ CA Canada CA-2.39 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   24.4.2022 19.4.2023 CA-2.40 N, P1   25.4.2022 19.4.2023’; (ii) in the entry for Canada, the rows for the zones CA-2.74 to CA-2.83 are replaced by the following: ‘ CA Canada CA-2.74 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   9.7.2022 19.4.2023 CA-2.75 N, P1   21.7.2022 19.4.2023 CA-2.76 N, P1   28.7.2022 19.4.2023 CA-2.77 N, P1   1.8.2022 19.4.2023 CA-2.78 N, P1   23.8.2022 19.4.2023 CA-2.79 N, P1   31.8.2022 19.4.2023 CA-2.80 N, P1   4.9.2022 19.4.2023 CA-2.81 N, P1   9.9.2022 19.4.2023’; (iii) in the entry for Canada, the following rows for the zones CA-2.179 to CA-2.183 are added after the row for the zone CA-2.178: ‘ CA Canada CA-2.179 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   3.4.2023   CA-2.180 N, P1   4.4.2023   CA-2.181 N, P1   5.4.2023   CA-2.182 N, P1   13.4.2023   CA-2.183 N, P1   12.4.2023’;   (iv) in the entry for Chile, the following rows for the zones CL-2.2 to CL-2.7 are added after the row for the zone CL-2.1: ‘ CL Chile CL-2.2 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   19.3.2023   CL-2.3 N, P1   24.3.2023   CL-2.4 N, P1   30.3.2023   CL-2.5 N, P1   10.4.2023   CL-2.6 N, P1   12.4.2023   CL-2.7 N, P1   14.4.2023’;   (v) in the entry for the United Kingdom, the row for the zone GB-2.145 is replaced by the following: ‘ GB United Kingdom GB-2.145 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   17.9.2022 11.4.2023’; (vi) in the entry for the United Kingdom, the row for the zone GB-2.147 is replaced by the following: ‘ GB United Kingdom GB-2.147 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   19.9.2022 11.4.2023’; (vii) in the entry for the United Kingdom, the row for the zone GB-2.150 is replaced by the following: ‘ GB United Kingdom GB-2.150 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   22.9.2022 11.4.2023’; (viii) in the entry for the United Kingdom, the row for the zone GB-2.152 is replaced by the following: ‘ GB United Kingdom GB-2.152 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   23.9.2022 3.4.2023’; (ix) in the entry for the United Kingdom, the row for the zone GB-2.154 is replaced by the following: ‘ GB United Kingdom GB-2.154 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   24.9.2022 31.3.2023’; (x) in the entry for the United Kingdom, the row for the zone GB-2.158 is replaced by the following: ‘ GB United Kingdom GB-2.158 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   1.10.2022 11.4.2023’; (xi) in the entry for the United Kingdom, the row for the zone GB-2.163 is replaced by the following: ‘ GB United Kingdom GB-2.163 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   4.10.2022 31.3.2023’; (xii) in the entry for the United Kingdom, the row for the zone GB-2.165 is replaced by the following: ‘ GB United Kingdom GB-2.165 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   6.10.2022 3.4.2023’; (xiii) in the entry for the United Kingdom, the row for the zone GB-2.172 is replaced by the following: ‘ GB United Kingdom GB-2.172 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   11.10.2022 3.4.2023’; (xiv) in the entry for the United Kingdom, the row for the zone GB-2.179 is replaced by the following: ‘ GB United Kingdom GB-2.179 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   12.10.2022 3.4.2023’; (xv) in the entry for the United Kingdom, the row for the zone GB-2.184 is replaced by the following: ‘ GB United Kingdom GB-2.184 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   13.10.2022 3.4.2023’; (xvi) in the entry for the United Kingdom, the rows for the zones GB-2.193, GB-2.194 and GB-2.195 are replaced by the following: ‘ GB United Kingdom GB-2.193 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   16.10.2022 3.4.2023 GB-2.194 17.10.2022 12.4.2023 GB-2.195 18.10.2022 3.4.2023’; (xvii) in the entry for the United Kingdom, the rows for the zones GB-2.197 and GB-2.198 are replaced by the following: ‘ GB United Kingdom GB-2.197 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   18.10.2022 3.4.2023 GB-2.198 18.10.2022 4.4.2023’; (xviii) in the entry for the United Kingdom, the rows for the zones GB-2.203 and GB-2.204 are replaced by the following: ‘ GB United Kingdom GB-2.203 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   19.10.2022 13.4.2023 GB-2.204 20.10.2022 3.4.2023’; (xix) in the entry for the United Kingdom, the row for the zone GB-2.208 is replaced by the following: ‘ GB United Kingdom GB-2.208 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   21.10.2022 8.4.2023’; (xx) in the entry for the United Kingdom, the row for the zone GB-2.213 is replaced by the following: ‘ GB United Kingdom GB-2.213 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   23.10.2022 12.4.2023’; (xxi) in the entry for the United Kingdom, the rows for the zones GB-2.216 and GB-2.217 are replaced by the following: ‘ GB United Kingdom GB-2.216 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   23.10.2022 3.4.2023 GB-2.217 24.10.2022 31.3.2023’; (xxii) in the entry for the United Kingdom, the row for the zone GB-2.219 is replaced by the following: ‘ GB United Kingdom GB-2.219 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   26.10.2022 12.4.2023’; (xxiii) in the entry for the United Kingdom, the row for the zone GB-2.224 is replaced by the following: ‘ GB United Kingdom GB-2.224 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   27.10.2022 13.4.2023’; (xxiv) in the entry for the United Kingdom, the rows for the zones GB-2.226 and GB-2.227 are replaced by the following: ‘ GB United Kingdom GB-2.226 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   29.10.2022 8.4.2023 GB-2.227 29.10.2022 13.4.2023’; (xxv) in the entry for the United Kingdom, the rows for the zones GB-2.229 and GB-2.230 are replaced by the following: ‘ GB United Kingdom GB-2.229 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   30.10.2022 13.4.2023 GB-2.230 29.10.2022 8.4.2023’; (xxvi) in the entry for the United Kingdom, the row for the zone GB-2.233 is replaced by the following: ‘ GB United Kingdom GB-2.233 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   1.11.2022 13.4.2023’; (xxvii) in the entry for the United Kingdom, the row for the zone GB-2.238 is replaced by the following: ‘ GB United Kingdom GB-2.238 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   2.11.2022 12.4.2023’; (xxviii) in the entry for the United Kingdom, the rows for the zones GB-2.240 and GB-2.241 are replaced by the following: ‘ GB United Kingdom GB-2.240 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   3.11.2022 8.4.2023 GB-2.241 4.11.2022 31.3.2023’; (xxix) in the entry for the United Kingdom, the rows for the zones GB-2.243 and GB-2.244 are replaced by the following: ‘ GB United Kingdom GB-2.243 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   5.11.2022 12.4.2023 GB-2.244 5.11.2022 8.4.2023’; (xxx) in the entry for the United Kingdom, the row for the zone GB-2.247 is replaced by the following: ‘ GB United Kingdom GB-2.247 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   7.11.2022 8.4.2023’; (xxxi) in the entry for the United Kingdom, the row for the zone GB-2.249 is replaced by the following: ‘ GB United Kingdom GB-2.249 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   9.11.2022 4.4.2023’; (xxxii) in the entry for the United Kingdom, the row for the zone GB-2.252 is replaced by the following: ‘ GB United Kingdom GB-2.252 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   11.11.2022 12.4.2023’; (xxxiii) in the entry for the United Kingdom, the rows for the zones GB-2.254 to GB-2.258 are replaced by the following: ‘ GB United Kingdom GB-2.254 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   13.11.2022 8.4.2023 GB-2.255 14.11.2022 4.4.2023 GB-2.256 14.11.2022 8.4.2023 GB-2.257 15.11.2022 8.4.2023 GB-2.258 16.11.2022 8.4.2023’; (xxxiv) in the entry for the United Kingdom, the rows for the zones GB-2.260, GB-2.261 and GB-2.262 are replaced by the following: ‘ GB United Kingdom GB-2.260 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   18.11.2022 11.4.2023 GB-2.261 18.11.2022 8.4.2023 GB-2.262 20.11.2022 4.4.2023’; (xxxv) in the entry for the United Kingdom, the rows for the zones GB-2.265, GB-2.266 and GB-2.267 are replaced by the following: ‘ GB United Kingdom GB-2.265 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   20.11.2022 8.4.2023 GB-2.266 21.11.2022 1.4.2023 GB-2.267 22.11.2022 4.4.2023’; (xxxvi) in the entry for the United Kingdom, the rows for the zones GB-2.270 to GB-2.275 are replaced by the following: ‘ GB United Kingdom GB-2.270 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   27.11.2022 8.4.2023 GB-2.271 28.11.2022 12.4.2023 GB-2.272 29.11.2022 11.4.2023 GB-2.273 7.12.2022 8.4.2023 GB-2.274 8.12.2022 11.4.2023 GB-2.275 11.12.2022 11.4.2023’; (xxxvii) in the entry for the United Kingdom, the rows for the zones GB-2.282 and GB-2.283 are replaced by the following: ‘ GB United Kingdom GB-2.282 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   22.12.2022 3.4.2023 GB-2.283 29.12.2022 12.4.2023’; (xxxviii) in the entry for the United Kingdom, the row for the zone GB-2.286 is replaced by the following: ‘ GB United Kingdom GB-2.286 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   9.1.2023 31.3.2023’; (xxxix) in the entry for the United Kingdom, the row for the zone GB-2.288 is replaced by the following: ‘ GB United Kingdom GB-2.288 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   12.1.2023 5.4.2023’; (xl) in the entry for the United Kingdom, the row for the zone GB-2.291 is replaced by the following: ‘ GB United Kingdom GB-2.291 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   24.1.2023 5.4.2023’; (xli) in the entry for the United Kingdom, the rows for the zones GB-2.293 and GB-2.294 are replaced by the following: ‘ GB United Kingdom GB-2.293 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   2.2.2023 30.3.2023 GB-2.294 15.2.2023 5.4.2023’; (xlii) in the entry for the United States, the row for the zone US-2.257 is replaced by the following: ‘ US United States US-2.257 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   13.9.2022 19.3.2023’; (xliii) in the entry for the United States, the row for the zone US-2.272 is replaced by the following: ‘ US United States US-2.272 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   21.9.2022 25.3.2023’; (xliv) in the entry for the United States, the rows for the zones US-2.277 and US-2.278 are replaced by the following: ‘ US United States US-2.277 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   22.9.2022 23.3.2023 US-2.278 N, P1   23.9.2022 21.3.2023’; (xlv) in the entry for the United States, the rows for the zones US-2.289 and US-2.290 are replaced by the following: ‘ US United States US-2.289 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   3.10.2022 12.4.2023 US-2.290 N, P1   3.10.2022 1.4.2023’; (xlvi) in the entry for the United States, the rows for the zones US-2.293 and US-2.294 are replaced by the following: ‘ US United States US-2.293 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   4.10.2022 6.4.2023 US-2.294 N, P1   5.10.2022 3.4.2023’; (xlvii) in the entry for the United States, the row for the zone US-2.304 is replaced by the following: ‘ US United States US-2.304 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   11.10.2022 6.4.2023’; (xlviii) in the entry for the United States, the row for the zone US-2.306 is replaced by the following: ‘ US United States US-2.306 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   7.10.2022 31.3.2023’; (xlix) in the entry for the United States, the row for the zone US-2.309 is replaced by the following: ‘ US United States US-2.309 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   13.10.2022 12.4.2023’; (l) in the entry for the United States, the row for the zone US-2.312 is replaced by the following: ‘ US United States US-2.312 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   14.10.2022 16.3.2023’; (li) in the entry for the United States, the row for the zone US-2.315 is replaced by the following: ‘ US United States US-2.315 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   18.10.2022 6.4.2023’; (lii) in the entry for the United States, the rows for the zones US-2.320 and US-2.321 are replaced by the following: ‘ US United States US-2.320 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   20.10.2022 19.3.2023 US-2.321 N, P1   25.10.2022 24.3.2023’; (liii) in the entry for the United States, the rows for the zones US-2.329 to US-2.332 are replaced by the following: ‘ US United States US-2.329 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   1.11.2022 28.3.2023 US-2.330 N, P1   1.11.2022 6.4.2023 US-2.331 N, P1   3.11.2022 5.4.2023 US-2.332 N, P1   3.11.2022 5.4.2023’; (liv) in the entry for the United States, the row for the zone US-2.334 is replaced by the following: ‘ US United States US-2.334 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   3.11.2022 20.3.2023’; (lv) in the entry for the United States, the row for the zone US-2.336 is replaced by the following: ‘ US United States US-2.336 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   4.11.2022 20.3.2023’; (lvi) in the entry for the United States, the row for the zone US-2.338 is replaced by the following: ‘ US United States US-2.338 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   7.11.2022 13.4.2023’; (lvii) in the entry for the United States, the rows for the zones US-2.340 and US-2.341 are replaced by the following: ‘ US United States US-2.340 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   8.11.2022 20.3.2023 US-2.341 N, P1   8.11.2022 20.3.2023’; (lviii) in the entry for the United States, the rows for the zones US-2.343, US-2.344 and US-2.345 are replaced by the following: ‘ US United States US-2.343 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   10.10.2022 10.4.2023 US-2.344 N, P1   10.11.2022 20.3.2023 US-2.345 N, P1   10.11.2022 20.3.2023’; (lix) in the entry for the United States, the rows for the zones US-2.372 and US-2.373 are replaced by the following: ‘ US United States US-2.372 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   7.12.2022 13.3.2023; US-2.373 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   7.12.2023 9.4.2023’; (lx) in the entry for the United States, the row for the zone US-2.378 is replaced by the following: ‘ US United States US-2.378 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   12.12.2022 17.3.2023’; (lxi) in the entry for the United States, the rows for the zones US-2.391 and US-2.392 are replaced by the following: ‘ US United States US-2.391 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   20.12.2022 13.4.2023 US-2.392 N, P1   20.12.2022 2.3.2023’; (lxii) in the entry for the United States, the row for the zone US-2.396 is replaced by the following: ‘ US United States US-2.396 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   28.12.2022 29.4.2023’; (lxiii) in the entry for the United States, the row for the zone US-2.398 is replaced by the following: ‘ US United States US-2.398 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   4.1.2023 19.3.2023’; (lxiv) in the entry for the United States, the row for the zone US-2.409 is replaced by the following: ‘ US United States US-2.409 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   6.2.2023 12.4.2023’; (lxv) in the entry for the United States, the row for the zone US-2.414 is replaced by the following: ‘ US United States US-2.414 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   17.2.2023 25.3.2023’; (lxvi) in the entry for the United States, the row for the zone US-2.419 is replaced by the following: ‘ US United States US-2.419 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   23.2.2023 27.3.2023’; (lxvii) in the entry for the United States, the row for the zone US-2.424 is replaced by the following: ‘ US United States US-2.424 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   28.2.2023 31.3.2023’; (lxviii) in the entry for the United States, the following rows for the zones US-2.451 to US-2.455 are added after the row for the zone US-2.450: ‘ US United States US-2.451 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   12.4.2023   US-2.452 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   17.4.2023   US-2.453 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   18.4.2023   US-2.454 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   19.4.2023   US-2.455 BPP, BPR, DOC, DOR, SP, SR, POU-LT20, HEP, HER, HE-LT20 N, P1   19.4.2023’;   (b) Part 2 is amended as follows: (i) in the entry for Canada, the following description of the zones CA-2.179 to CA-2.183 is added after the description of the zone CA-2.178: ‘Canada CA-2.179 Quebec- Latitude 45.39, Longitude -72.88 The municipalities involved are: 3km PZ: Ange-Gardien and Saint-Césaire. 10km SZ: Ange-Gardien, Brigham, Farnham, Granby, Saint-Alphonse-de-Granby, Saint-Césaire, Sainte-Brigide-d’Iberville, and Saint-Paul-d’Abbotsford.. CA-2.180 Quebec- Latitude 45.35, Longitude -72.88 The municipalities involved are: 3km PZ: Ange-Gardien 10km SZ: Ange-Gardien, Brigham, Bromont, Farnham, Granby, Saint-Alphonse, Saint-Alphonse-de-Granby, Saint-Césaire, Saint-Paul-d’Abbotsford. CA-2.181 Ontario- Latitude 42.97, Longitude -81.4 The municipalities involved are: 3km PZ: Komoka 10km SZ: Arva, Delaware, Ilderton, Komoka, London, and Mount Brydges CA-2.182 Quebec- Latitude 45.75, Longitude -72.75 3km PZ: Sainte-Hélène-de-Bagot and Saint-Eugene-de-Grantham 10km SZ: Sainte-Hélène-de-Bagot, Saint-Eugene-de-Grantham, Saint-Guillaume, Saint-Hugues, Saint-Liboire, Sait-Nazaire-d’Acton, Saint-Simon-De-Bagot, and Upton CA-2.183 Quebec- Latitude 45.38, Longitude -71.96 The municipalities involved are: 3km PZ: Sherbrooke 10km SZ: Hatley, Saint-Denis-de-Brompton, and Sherbrooke’; (ii) in the entry for Chile, the following description of the zones CL-2.2 to CL-2.7 is added after the description of the zone CL-2.1: ‘Chile CL-2.2 Maule Region, Province of Linares, Commune of Linares. latitude -35,8517, longitude -71,5796 PZ: Communities: Linares, La Torre, Ballica Norte, Las Flores, San Antonio, Ballica Sur, Salida Cuellar, El Almendro, Las Camelias SZ: Communities: San Juan, El polígono, Llancanao, Ancoa, Miraflores, La Obra, Guadantún, Coironal, Bodega, Maitenes, Los Batros, Los Puquios, Buen Amigo, San Víctor Alamo CL-2.3 Biobío Region, Province of Concepción, Commune of Florida latitude -36.7919, longitude -72.7386 PZ: Communities: Chequén SZ: Communities: Porvenir, San Lorenzo, San Juan, Bodega, Peninhueque, Roa, Granerillos CL-2.4 Valparaíso Region, Province of Quillota, Commune of Nogales Latitude -32,75 Longitude -71,245 PZ: Communities of Pucalán, Nueva Pucalán, El Olivo. SZ: Communities of Los Maquis, Rosario, El Navío, Melón, Ex asentamiento El Melón, Chamisal, Garretón, La Peña CL-2.5 Maule Region, Province of Talca latitude -35,5094, longitude -71,5568 PZ: Commune San Clemente, Commune of Talca. Communities: Flor del Llano, Aurora, El Provenir, Mata Verde, El Fuerte, El Bolsico SZ: Communes: San Clemente, Talca and Maule. Communities: San Clemente, Talca, Santa Elena, Ramadillas, Huilquilemu, Mercedes, Chacarilla, Pirque, Quiñipeumo, Duao, Chequén, San Manuel, Bella Unión, Quebrada de Agua CL-2.6 Biobío Region, Province of Concepción latitude -36.7900, longitude -72.7346 PZ: Commune of Florida, Communities: Chequén SZ: Commune of Florida, and part of commune of Tomé (a zone of 26 km2, separated by a highway). Communities: Porvenir, San Lorenzo, San Juan, Bodega, Peninhueque, Roa, Granerillos CL-2.7 Valparaíso Region, Province of Quillota, Commune of Nogales Latitude -32,7151 Longitude -71,1879 PZ: Communities: Ex asentamiento El Melón, Melón, Garretón SZ: Communities: Los Maquis, Rosario, El Navío, Chamisal, La Peña, Pucalán, Nueva Pucalán, El Olivo’; (iii) in the entry for the United States, the following description of the zones US-2.451 to US-2.455 are added after the description of the zone US-2.450: ‘United States US-2.451 State of New York Putnam 01 Putnam County: A circular zone of a 10 km radius starting with North point (GPS coordinates: 73.5656707°W 41.4959227°N) US-2.452 State of New York Putnam 02 Putnam County: A circular zone of a 10 km radius starting with North point (GPS coordinates: 73.5610665°W 41.5618806°N) US-2.453 State of New York Kings 02 Kings County: A circular zone of a 10 km radius starting with North point (GPS coordinates: 73.9883416°W 40.7246249°N) US-2.454 State of South Dakota Beadle 09 Beadle County: A circular zone of a 10 km radius starting with North point (GPS coordinates: 97.9009159°W 44.4150837°N) US-2.455 State of North Dakota Dickey 03 Dickey County: A circular zone of a 10 km radius starting with North point (GPS coordinates: 98.4439654°W 46.1626533°N)’ (2) in Annex XIV, in Part 1, Section B is amended as follows (i) in the entry for Canada, the rows for the zones CA-2.39 and CA-2.40 are replaced by the following: ‘ CA Canada CA-2.39 POU, RAT N, P1   24.4.2022 19.4.2023 GBM P1   24.4.2022 19.4.2023 CA-2.40 POU, RAT N, P1   25.4.2022 19.4.2023 GBM P1   25.4.2022 19.4.2023’; (ii) in the entry for Canada, the rows for the zones CA-2.74 to CA-2.81 are replaced by the following: ‘ CA Canada CA-2.74 POU, RAT N, P1   9.7.2022 19.4.2023 GBM P1   9.7.2022 19.4.2023 CA-2.75 POU, RAT N, P1   21.7.2022 19.4.2023 GBM P1   21.7.2022 19.4.2023 CA-2.76 POU, RAT N, P1   28.7.2022 19.4.2023 GBM P1   28.7.2022 19.4.2023 CA-2.77 POU, RAT N, P1   1.8.2022 19.4.2023 GBM P1   1.8.2022 19.4.2023 CA-2.78 POU, RAT N, P1   23.8.2022 19.4.2023 GBM P1   23.8.2022 19.4.2023 CA-2.79 POU, RAT N, P1   31.8.2022 19.4.2023 GBM P1   31.8.2022 19.4.2023 CA-2.80 POU, RAT N, P1   4.9.2022 19.4.2023 GBM P1   4.9.2022 19.4.2023 CA-2.81 POU, RAT N, P1   9.9.2022 19.4.2023 GBM P1   9.9.2022 19.4.2023’; (iii) in the entry for Canada, the following rows for the zones CA-2.179 to CA-2.183 are added after the rows for the zone CA-2.178: ‘ CA Canada CA-2.179 POU, RAT N, P1   3.4.2023   GBM P1   3.4.2023   CA-2.180 POU, RAT N, P1   4.4.2023   GBM P1   4.4.2023   CA-2.181 POU, RAT N, P1   5.4.2023   GBM P1   5.4.2023   CA-2.182 POU, RAT N, P1   13.4.2023   GBM P1   13.4.2023   CA-2.183 POU, RAT N, P1   12.4.2023   GBM P1   12.4.2023’;   (iv) in the entry for Chile, the following rows for the zones CL-2.2 to CA-2.7 are added after the rows for the zone CL-2.1: ‘ CL Chile CL-2.2 POU, RAT N, P1   19.3.2023   GBM P1   19.3.2023   CL-2.3 POU, RAT N, P1   24.3.2023   GBM P1   24.3.2023   CL-2.4 POU, RAT N, P1   30.3.2023   GBM P1   30.3.2023   CL-2.5 POU, RAT N, P1   10.4.2023   GBM P1   10.4.2023   CL-2.6 POU, RAT N, P1   12.4.2023   GBM P1   12.4.2023   CL-2.7 POU, RAT N, P1   14.4.2023   GBM P1   14.4.2023’;   (v) in the entry for the United Kingdom, the rows for the zone GB-2.145 are replaced by the following: ‘ GB United Kingdom GB-2.145 POU, RAT N, P1   17.9.2022 11.4.2023 GBM P1   17.9.2022 11.4.2023’; (vi) in the entry for the United Kingdom, the rows for the zone GB-2.147 are replaced by the following: ‘ GB United Kingdom GB-2.147 POU, RAT N, P1   19.9.2022 11.4.2023 GBM P1   19.9.2022 11.4.2023’; (vii) in the entry for the United Kingdom, the rows for the zone GB-2.150 are replaced by the following: ‘ GB United Kingdom GB-2.150 POU, RAT N, P1   22.9.2022 11.4.2023 GBM P1   22.9.2022 11.4.2023’; (viii) in the entry for the United Kingdom, the rows for the zone GB-2.152 are replaced by the following: ‘ GB United Kingdom GB-2.152 POU, RAT N, P1   23.9.2022 3.4.2023 GBM P1   23.9.2022 3.4.2023’; (ix) in the entry for the United Kingdom, the rows for the zone GB-2.154 are replaced by the following: ‘ GB United Kingdom GB-2.154 POU, RAT N, P1   24.9.2022 31.3.2023 GBM P1   24.9.2022 31.3.2023’; (x) in the entry for the United Kingdom, the rows for the zone GB-2.158 are replaced by the following: ‘ GB United Kingdom GB-2.158 POU, RAT N, P1   1.10.2022 11.4.2023 GBM P1   1.10.2022 11.4.2023’; (xi) in the entry for the United Kingdom, the rows for the zone GB-2.163 are replaced by the following: ‘ GB United Kingdom GB-2.163 POU, RAT N, P1   4.10.2022 31.3.2023 GBM P1   4.10.2022 31.3.2023’; (xii) in the entry for the United Kingdom, the rows for the zone GB-2.165 are replaced by the following: ‘ GB United Kingdom GB-2.165 POU, RAT N, P1   6.10.2022 3.4.2023 GBM P1   6.10.2022 3.4.2023’; (xiii) in the entry for the United Kingdom, the rows for the zone GB-2.172 are replaced by the following: ‘ GB United Kingdom GB-2.172 POU, RAT N, P1   11.10.2022 3.4.2023 GBM P1   11.10.2022 3.4.2023’; (xiv) in the entry for the United Kingdom, the rows for the zone GB-2.179 are replaced by the following: ‘ GB United Kingdom GB-2.179 POU, RAT N, P1   12.10.2022 3.4.2023 GBM P1   12.10.2022 3.4.2023’; (xv) in the entry for the United Kingdom, the rows for the zone GB-2.184 are replaced by the following: ‘ GB United Kingdom GB-2.184 POU, RAT N, P1   13.10.2022 3.4.2023 GBM P1   13.10.2022 3.4.2023’; (xvi) in the entry for the United Kingdom, the rows for the zones GB-2.193, GB-2.194 and GB-2.195 are replaced by the following: ‘ GB United Kingdom GB-2.193 POU, RAT N, P1   16.10.2022 3.4.2023 GBM P1   16.10.2022 3.4.2023 GB-2.194 POU, RAT N, P1   17.10.2022 12.4.2023 GBM P1   17.10.2022 12.4.2023 GB-2.195 POU, RAT N, P1   18.10.2022 3.4.2023 GBM P1   18.10.2022 3.4.2023’; (xvii) in the entry for the United Kingdom, the rows for the zones GB-2.197 and GB-2.198 are replaced by the following: ‘ GB United Kingdom GB-2.197 POU, RAT N, P1   18.10.2022 3.4.2023 GBM P1   18.10.2022 3.4.2023 GB-2.198 POU, RAT N, P1   18.10.2022 4.4.2023 GBM P1   18.10.2022 4.4.2023’; (xviii) in the entry for the United Kingdom, the rows for the zones GB-2.203 and GB-2.204 are replaced by the following: ‘ GB United Kingdom GB-2.203 POU, RAT N, P1   19.10.2022 13.4.2023 GBM P1   19.10.2022 13.4.2023 GB-2.204 POU, RAT N, P1   20.10.2022 3.4.2023 GBM P1   20.10.2022 3.4.2023’; (xix) in the entry for the United Kingdom, the rows for the zone GB-2.208 are replaced by the following: ‘ GB United Kingdom GB-2.208 POU, RAT N, P1   21.10.2022 8.4.2023 GBM P1   21.10.2022 8.4.2023’; (xx) in the entry for the United Kingdom, the rows for the zone GB-2.213 are replaced by the following: ‘ GB United Kingdom GB-2.213 POU, RAT N, P1   23.10.2022 12.4.2023 GBM P1   23.10.2022 12.4.2023’; (xxi) in the entry for the United Kingdom, the rows for the zones GB-2.216 and GB-2.217 are replaced by the following: ‘ GB United Kingdom GB-2.216 POU, RAT N, P1   23.10.2022 3.4.2023 GBM P1   23.10.2022 3.4.2023 GB-2.217 POU, RAT N, P1   24.10.2022 31.3.2023 GBM P1   24.10.2022 31.3.2023’; (xxii) in the entry for the United Kingdom, the rows for the zone GB-2.219 are replaced by the following: ‘ GB United Kingdom GB-2.219 POU, RAT N, P1   26.10.2022 12.4.2023 GBM P1   26.10.2022 12.4.2023’; (xxiii) in the entry for the United Kingdom, the rows for the zone GB-2.224 are replaced by the following: ‘ GB United Kingdom GB-2.224 POU, RAT N, P1   27.10.2022 13.4.2023 GBM P1   27.10.2022 13.4.2023’; (xxxiv) in the entry for the United Kingdom, the rows for the zones GB-2.226 and GB-2.227 are replaced by the following: ‘ GB United Kingdom GB-2.226 POU, RAT N, P1   29.10.2022 8.4.2023 GBM P1   29.10.2022 8.4.2023 GB-2.227 POU, RAT N, P1   29.10.2022 13.4.2023 GBM P1   29.10.2022 13.4.2023’; (xxv) in the entry for the United Kingdom, the rows for the zones GB-2.229 and GB-2.230 are replaced by the following: ‘ GB United Kingdom GB-2.229 POU, RAT N, P1   30.10.2022 13.4.2023 GBM P1   30.10.2022 13.4.2023 GB-2.230 POU, RAT N, P1   29.10.2022 8.4.2023 GBM P1   29.10.2022 8.4.2023’; (xxvi) in the entry for the United Kingdom, the rows for the zone GB-2.233 are replaced by the following: ‘ GB United Kingdom GB-2.233 POU, RAT N, P1   1.11.2022 13.4.2023 GBM P1   1.11.2022 13.4.2023’; (xxvii) in the entry for the United Kingdom, the rows for the zone GB-2.238 are replaced by the following: ‘ GB United Kingdom GB-2.238 POU, RAT N, P1   2.11.2022 12.4.2023 GBM P1   2.11.2022 12.4.2023’; (xxviii) in the entry for the United Kingdom, the rows for the zones GB-2.240 and GB-2.241 are replaced by the following: ‘ GB United Kingdom GB-2.240 POU, RAT N, P1   3.11.2022 8.4.2023 GBM P1   3.11.2022 8.4.2023 GB-2.241 POU, RAT N, P1   4.11.2022 31.3.2023 GBM P1   4.11.2022 31.3.2023’; (xxix) in the entry for the United Kingdom, the rows for the zones GB-2.243 and GB-2.244 are replaced by the following: ‘ GB United Kingdom GB-2.243 POU, RAT N, P1   5.11.2022 12.4.2023 GBM P1   5.11.2022 12.4.2023 GB-2.244 POU, RAT N, P1   5.11.2022 8.4.2023 GBM P1   5.11.2022 8.4.2023’; (xxx) in the entry for the United Kingdom, the rows for the zone GB-2.247 are replaced by the following: ‘ GB United Kingdom GB-2.247 POU, RAT N, P1   7.11.2022 8.4.2023 GBM P1   7.11.2022 8.4.2023’; (xxxi) in the entry for the United Kingdom, the rows for the zone GB-2.249 are replaced by the following: ‘ GB United Kingdom GB-2.249 POU, RAT N, P1   9.11.2022 4.4.2023 GBM P1   9.11.2022 4.4.2023’; (xxxii) in the entry for the United Kingdom, the rows for the zone GB-2.252 are replaced by the following: ‘ GB United Kingdom GB-2.252 POU, RAT N, P1   11.11.2022 12.4.2023 GBM P1   11.11.2022 12.4.2023’; (xxxiii) in the entry for the United Kingdom, the rows for the zones GB-2.254 to GB-2.258 are replaced by the following: ‘ GB United Kingdom GB-2.254 POU, RAT N, P1   13.11.2022 8.4.2023 GBM P1   13.11.2022 8.4.2023 GB-2.255 POU, RAT N, P1   14.11.2022 4.4.2023 GBM P1   14.11.2022 4.4.2023 GB-2.256 POU, RAT N, P1   14.11.2022 8.4.2023 GBM P1   14.11.2022 8.4.2023 GB-2.257 POU, RAT N, P1   15.11.2022 8.4.2023 GBM P1   15.11.2022 8.4.2023 GB-2.258 POU, RAT N, P1   16.11.2022 8.4.2023 GBM P1   16.11.2022 8.4.2023’; (xxxiv) in the entry for the United Kingdom, the rows for the zones GB-2.260, GB-2.261 and GB-2.262 are replaced by the following: ‘ GB United Kingdom GB-2.260 POU, RAT N, P1   18.11.2022 11.4.2023 GBM P1   18.11.2022 11.4.2023 GB-2.261 POU, RAT N, P1   18.11.2022 8.4.2023 GBM P1   18.11.2022 8.4.2023 GB-2.262 POU, RAT N, P1   20.11.2022 4.4.2023 GBM P1   20.11.2022 4.4.2023’; (xxxv) in the entry for the United Kingdom, the rows for the zones GB-2.265, GB-2.266 and GB-2.267 are replaced by the following: ‘ GB United Kingdom GB-2.265 POU, RAT N, P1   20.11.2022 8.4.2023 GBM P1   20.11.2022 8.4.2023 GB-2.266 POU, RAT N, P1   21.11.2022 1.4.2023 GBM P1   21.11.2022 1.4.2023 GB-2.267 POU, RAT N, P1   22.11.2022 4.4.2023 GBM P1   22.11.2022 4.4.2023’; (xxxvi) in the entry for the United Kingdom, the rows for the zones GB-2.270 to GB-2.275 are replaced by the following: ‘ GB United Kingdom GB-2.270 POU, RAT N, P1   27.11.2022 8.4.2023 GBM P1   27.11.2022 8.4.2023 GB-2.271 POU, RAT N, P1   28.11.2022 12.4.2023 GBM P1   28.11.2022 12.4.2023 GB-2.272 POU, RAT N, P1   29.11.2022 11.4.2023 GBM P1   29.11.2022 11.4.2023 GB-2.273 POU, RAT N, P1   7.12.2022 8.4.2023 GBM P1   7.12.2022 8.4.2023 GB-2.274 POU, RAT N, P1   8.12.2022 11.4.2023 GBM P1   8.12.2022 11.4.2023 GB-2.275 POU, RAT N, P1   11.12.2022 11.4.2023 GBM P1   11.12.2022 11.4.2023’; (xxxvii) in the entry for the United Kingdom, the rows for the zones GB-2.282 and GB-2.283 are replaced by the following: ‘ GB United Kingdom GB-2.282 POU, RAT N, P1   22.12.2022 3.4.2023 GBM P1   22.12.2022 3.4.2023 GB-2.283 POU, RAT N, P1   29.12.2022 12.4.2023 GBM P1   29.12.2022 12.4.2023’; (xxxviii) in the entry for the United Kingdom, the rows for the zone GB-2.286 are replaced by the following: ‘ GB United Kingdom GB-2.286 POU, RAT N, P1   9.1.2023 31.3.2023 GBM P1   9.1.2023 31.3.2023’; (xxxix) in the entry for the United Kingdom, the rows for the zone GB-2.288 are replaced by the following: ‘ GB United Kingdom GB-2.288 POU, RAT N, P1   12.1.2023 5.4.2023 GBM P1   12.1.2023 5.4.2023’; (xl) in the entry for the United Kingdom, the rows for the zone GB-2.291 are replaced by the following: ‘ GB United Kingdom GB-2.291 POU, RAT N, P1   24.1.2023 5.4.2023 GBM P1   24.1.2023 5.4.2023’; (xli) in the entry for the United Kingdom, the rows for the zones GB-2.293 and GB-2.294 are replaced by the following: ‘ GB United Kingdom GB-2.293 POU, RAT N, P1   2.2.2023 30.3.2023 GBM P1   2.2.2023 30.3.2023 GB-2.294 POU, RAT N, P1   15.2.2023 5.4.2023 GBM P1   15.2.2023 5.4.2023’; (xlii) in the entry for the United States, the rows for the zone US-2.257 are replaced by the following: ‘ US United States US-2.257 POU, RAT N, P1   13.9.2022 19.3.2023 GBM P1   13.9.2022 19.3.2023’; (xliii) in the entry for the United States, the rows for the zone US-2.272 are replaced by the following: ‘ US United States US-2.272 POU, RAT N, P1   21.9.2022 25.3.2023 GBM P1   21.9.2022 25.3.2023’; (xliv) in the entry for the United States, the rows for the zones US-2.277 and US-2.278 are replaced by the following: ‘ US United States US-2.277 POU, RAT N, P1   22.9.2022 23.3.2023 GBM P1   22.9.2022 23.3.2023 US-2.278 POU, RAT N, P1   23.9.2022 21.3.2023 GBM P1   23.9.2022 21.3.2023’; (xlv) in the entry for the United States, the rows for the zones US-2.289 and US-2.290 are replaced by the following: ‘ US United States US-2.289 POU, RAT N, P1   3.10.2022 12.4.2023 GBM P1   3.10.2022 12.4.2023 US-2.290 POU, RAT N, P1   3.10.2022 1.4.2023 GBM P1   3.10.2022 1.4.2023’; (xlvi) in the entry for the United States, the rows for the zones US-2.293 and US-2.294 are replaced by the following: ‘ US United States US-2.293 POU, RAT N, P1   4.10.2022 6.4.2023 GBM P1   4.10.2022 6.4.2023 US-2.294 POU, RAT N, P1   5.10.2022 3.4.2023 GBM P1   5.10.2022 3.4.2023’; (xlvii) in the entry for the United States, the rows for the zone US-2.304 are replaced by the following: ‘ US United States US-2.304 POU, RAT N, P1   11.10.2022 6.4.2023 GBM P1   11.10.2022 6.4.2023’; (xlviii) in the entry for the United States, the rows for the zone US-2.306 are replaced by the following: ‘ US United States US-2.306 POU, RAT N, P1   7.10.2022 31.3.2023 GBM P1   7.10.2022 31.3.2023’; (xlix) in the entry for the United States, the rows for the zone US-2.309 are replaced by the following: ‘ US United States US-2.309 POU, RAT N, P1   13.10.2022 12.4.2023 GBM P1   13.10.2022 12.4.2023’; (l) in the entry for the United States, the rows for the zone US-2.312 are replaced by the following: ‘ US United States US-2.312 POU, RAT N, P1   14.10.2022 16.3.2023 GBM P1   14.10.2022 16.3.2023’; (li) in the entry for the United States, the rows for the zone US-2.315 are replaced by the following: ‘ US United States US-2.315 POU, RAT N, P1   18.10.2022 6.4.2023 GBM P1   18.10.2022 6.4.2023’; (lii) in the entry for the United States, the rows for the zones US-2.320 and US-2.321 are replaced by the following: ‘ US United States US-2.320 POU, RAT N, P1   20.10.2022 19.3.2023 GBM P1   20.10.2022 19.3.2023 US-2.321 POU, RAT N, P1   25.10.2022 24.3.2023 GBM P1   25.10.2022 24.3.2023’; (liii) in the entry for the United States, the rows for the zones US-2.329 to US-2.332 are replaced by the following: ‘ US United States US-2.329 POU, RAT N, P1   1.11.2022 28.3.2023 GBM P1   1.11.2022 28.3.2023 US-2.330 POU, RAT N, P1   1.11.2022 6.4.2023 GBM P1   1.11.2022 6.4.2023 US-2.331 POU, RAT N, P1   3.11.2022 5.4.2023 GBM P1   3.11.2022 5.4.2023   US-2.332 POU, RAT N, P1   3.11.2022 5.4.2023     GBM P1   3.11.2022 5.4.2023’; (liv) in the entry for the United States, the rows for the zone US-2.334 are replaced by the following: ‘ US United States US-2.334 POU, RAT N, P1   3.11.2022 20.3.2023 GBM P1   3.11.2022 20.3.2023’; (lv) in the entry for the United States, the rows for the zone US-2.336 are replaced by the following: ‘ US United States US-2.336 POU, RAT N, P1   4.11.2022 20.3.2023 GBM P1   4.11.2022 20.3.2023’; (lvi) in the entry for the United States, the rows for the zone US-2.338 are replaced by the following: ‘ US United States US-2.338 POU, RAT N, P1   7.11.2022 13.4.2023 GBM P1   7.11.2022 13.4.2023’; (lvii) in the entry for the United States, the rows for the zones US-2.340 and US-2.341 are replaced by the following: ‘ US United States US-2.340 POU, RAT N, P1   8.11.2022 20.3.2023 GBM P1   8.11.2022 20.3.2023 US-2.341 POU, RAT N, P1   8.11.2022 20.3.2023 GBM P1   8.11.2022 20.3.2023’; (lviii) in the entry for the United States, the rows for the zones US-2.343, US-2.344 and US-2.345 are replaced by the following: ‘ US United States US-2.343 POU, RAT N, P1   10.10.2022 10.4.2023 GBM P1   10.10.2022 10.4.2023 US-2.344 POU, RAT N, P1   10.11.2022 20.3.2023 GBM P1   10.11.2022 20.3.2023 US-2.345 POU, RAT N, P1   10.11.2022 20.3.2023 GBM P1   10.11.2022 20.3.2023’; (lix) in the entry for the United States, the rows for the zones US-2.372 and US-2.373 are replaced by the following: ‘ US United States US-2.372 POU, RAT N, P1   7.12.2022 13.3.2023 GBM P1   7.12.2022 13.3.2023 US-2.373 POU, RAT N, P1   7.12.2022 9.4.2023 GBM P1   7.12.2022 9.4.2023’; (lx) in the entry for the United States, the rows for the zone US-2.378 are replaced by the following: ‘ US United States US-2.378 POU, RAT N, P1   12.12.2022 17.3.2023 GBM P1   12.12.2022 17.3.2023’; (lxi) in the entry for the United States, the rows for the zones US-2.391 and US-2.392 are replaced by the following: ‘ US United States US-2.391 POU, RAT N, P1   20.12.2022 13.4.2023 GBM P1   20.12.2022 13.4.2023 US-2.392 POU, RAT N, P1   20.12.2022 2.3.2023 GBM P1   20.12.2022 2.3.2023’; (lxii) in the entry for the United States, the rows for the zone US-2.396 are replaced by the following: ‘ US United States US-2.396 POU, RAT N, P1   28.12.2022 29.4.2023 GBM P1   28.12.2022 29.4.2023’; (lxiii) in the entry for the United States, the rows for the zone US-2.398 are replaced by the following: ‘ US United States US-2.398 POU, RAT N, P1   4.1.2023 19.3.2023 GBM P1   4.1.2023 19.3.2023’; (lxiv) in the entry for the United States, the rows for the zone US-2.409 are replaced by the following: ‘ US United States US-2.409 POU, RAT N, P1   6.2.2023 12.4.2023 GBM P1   6.2.2023 12.4.2023’; (lxv) in the entry for the United States, the rows for the zone US-2.414 are replaced by the following: ‘ US United States US-2.414 POU, RAT N, P1   17.2.2023 25.3.2023 GBM P1   17.2.2023 25.3.2023’; (lxvi) in the entry for the United States, the rows for the zone US-2.419 are replaced by the following: ‘ US United States US-2.419 POU, RAT N, P1   23.2.2023 27.3.2023 GBM P1   23.2.2023 27.3.2023’; (lxvii) in the entry for the United States, the rows for the zone US-2.424 are replaced by the following: ‘ US United States US-2.424 POU, RAT N, P1   28.2.2023 31.3.2023 GBM P1   28.2.2023 31.3.2023’; (lxviii) in the entry for the United States, the following rows for the zones US-2.451 to US-2.455 are added after the rows for the zone US-2.450: ‘ US United States US-2.451 POU, RAT N, P1   12.4.2023   GBM P1   12.4.2023   US-2.452 POU, RAT N, P1   17.4.2023   GBM P1   17.4.2023   US-2.453 POU, RAT N, P1   18.4.2023   GBM P1   18.4.2023   US-2.454 POU, RAT N, P1   19.4.2023   GBM P1   19.4.2023   US-2.455 POU, RAT N, P1   19.4.2023   GBM P1   19.4.2023’;

Other acts of the same type
Regulation (EU) 2022/850 of the European Parliament and of the Council of 30 May 2022 on a computerised system for the cross-border electronic exchange of data in the area of judicial cooperation in civil and criminal matters (e-CODEX system), and amending Regulation (EU) 2018/1726 (Text with EEA relevance)Regulation (EU) 2022/858 of the European Parliament and of the Council of 30 May 2022 on a pilot regime for market infrastructures based on distributed ledger technology, and amending Regulations (EU) No 600/2014 and (EU) No 909/2014 and Directive 2014/65/EU (Text with EEA relevance)Regulation (EU) 2022/868 of the European Parliament and of the Council of 30 May 2022 on European data governance and amending Regulation (EU) 2018/1724 (Data Governance Act) (Text with EEA relevance)Regulation (EU) 2022/869 of the European Parliament and of the Council of 30 May 2022 on guidelines for trans-European energy infrastructure, amending Regulations (EC) No 715/2009, (EU) 2019/942 and (EU) 2019/943 and Directives 2009/73/EC and (EU) 2019/944, and repealing Regulation (EU) No 347/2013Commission Implementing Regulation (EU) 2022/913 of 30 May 2022 amending Implementing Regulation (EU) 2019/1793 on the temporary increase of official controls and emergency measures governing the entry into the Union of certain goods from certain third countries implementing Regulations (EU) 2017/625 and (EC) No 178/2002 of the European Parliament and of the Council (Text with EEA relevance)Commission Implementing Regulation (EU) 2022/828 of 25 May 2022 correcting the Polish language version of Regulation (EU) 2017/2195 establishing a guideline on electricity balancing (Text with EEA relevance)Commission Delegated Regulation (EU) 2022/1357 of 25 May 2022 amending Regulation (EU) 2019/1241 of the European Parliament and of the Council as regards king scallops (Pecten maximus) in the English ChannelCommission Implementing Regulation (EU) 2022/841 of 24 May 2022 conferring protection under Article 99 of Regulation (EU) No 1308/2013 of the European Parliament and of the Council on the name ‘Bolandin’ (PDO)Commission Implementing Regulation (EU) 2022/842 of 24 May 2022 conferring protection under Article 99 of Regulation (EU) No 1308/2013 of the European Parliament and of the Council on the name ‘Abadía Retuerta’ (PDO)Commission Implementing Regulation (EU) 2022/843 of 24 May 2022 approving amendments to the specification for a Protected Designation of Origin or a Protected Geographical Indication [‘Colli Berici’ (PDO)]Commission Implementing Regulation (EU) 2022/859 of 24 May 2022 amending Annex I to Council Regulation (EEC) No 2658/87 on the tariff and statistical nomenclature and on the Common Customs TariffCommission Implementing Regulation (EU) 2022/951 of 24 May 2022 amending the implementing technical standards laid down in Implementing Regulation (EU) 2016/2070 as regards benchmark portfolios, reporting templates and reporting instructions to be applied in the Union for the reporting referred to in Article 78(2) of Directive 2013/36/EU of the European Parliament and of the Council (Text with EEA relevance)

Source: EUR-Lex (Publications Office of the EU), © European Union, reuse permitted under Commission Decision 2011/833/EU.

Contents

What to look at next