Commission Regulation (EU) 2016/1719 Article 17

Commission Regulation (EU) 2016/1719 Article 17

Generation and load data provision methodology

Article 17

1.   No later than six months after the approval of the generation and load data provision methodology established for the day-ahead and intraday time frames referred to in Article 9(6) of Regulation (EU) 2015/1222, all TSOs shall jointly develop a proposal for a single generation and load data provision methodology for delivering the generation and load data required to establish the common grid model for long-term time frames. The proposal shall be subject to consultation in accordance with Article 6. The methodology shall take into account and complement the generation and load data provision methodology according to Article 16 of Regulation (EU) 2015/1222. 2.   When developing the generation and load data provision methodology, the requirements set in Article 16 of Regulation (EU) 2015/1222 shall apply.

Read the full instrument → · Read this in context: Section 3 — Common grid model →

Other provisions in Section 3 — Common grid model

Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗ · Data as of 2026-07-04

CitationArticle 17 of Commission Regulation (EU) 2016/1719 (LawPlayer, data as of 2026-07-04)

© European Union, https://eur-lex.europa.eu, 1998-2026. Reuse authorised under Commission Decision 2011/833/EU, provided the source is acknowledged.

What to look at next