Generation and load data provision methodology
Article 17
1. No later than six months after the approval of the generation and load data provision methodology established for the day-ahead and intraday time frames referred to in Article 9(6) of Regulation (EU) 2015/1222, all TSOs shall jointly develop a proposal for a single generation and load data provision methodology for delivering the generation and load data required to establish the common grid model for long-term time frames. The proposal shall be subject to consultation in accordance with Article 6. The methodology shall take into account and complement the generation and load data provision methodology according to Article 16 of Regulation (EU) 2015/1222. 2. When developing the generation and load data provision methodology, the requirements set in Article 16 of Regulation (EU) 2015/1222 shall apply.