Treatment of relevant assets located in a distribution system or in a closed distribution system
Article 90
1. Each TSO shall coordinate with the DSO the outage planning of internal relevant assets connected to its distribution system. 2. Each TSO shall coordinate with the CDSO the outage planning of internal relevant assets connected to its closed distribution system.