My bookmarksSign up free

Commission Regulation (Euratom) 2025/974 ANNEX IV

Commission Regulation (Euratom) 2025/974 ANNEX IV

MATERIAL BALANCE REPORT (MBR)

ANNEX IVSupplementary provisions

ANNEX IV MATERIAL BALANCE REPORT (MBR) Header Label/tag Content Comments # MBA Character (4) MBA code of reporting MBA 1 Report type Character (1) M for Material Balance Report 2 Report date Date (DDMMYYYY) Date on which the report was completed 3 Start report Date (DDMMYYYY) Starting date of MBR (date of last PIT + 1 day) 4 End report Date (DDMMYYYY) End date of MBR (date of current PIT) 5 Report number Number Sequential number, no gaps 6 Line count Number Total number of lines reported 7 Reporting person Character (64) Name of person responsible for the report 8 Entries Label/tag Content Comments # IC code Character (2) Type of inventory change 9 Line number Number Sequential number, no gaps 10 Element category Character (1) Category of nuclear material 11 Element weight Number (24,3) Element weight 12 Isotope Character (1) G for U-235, K for U-233, J for a mixture of U-235 and U-233 13 Fissile weight Number (24,3) Weight of fissile isotope 14 Obligation Character (5) Safeguard obligation 15 Correction Character (1) D for deletions, A for additions forming part of a deletion/addition pair, L for late lines (stand-alone additions) 16 Previous report Number Report number of line to be corrected 17 Previous line Number Line number of line to be corrected 18 Comment Character (256) Operator comment 19 CRC Number Hash code of line for quality control purposes 20 Previous CRC Number Hash code of line to be corrected 21 Explanatory notes 1. MBA: Code of the reporting material balance area. This code is notified to the installation concerned by the Commission. 2. Report type: M for material balance reports. 3. Report date: Date on which the report was completed. 4. Start report: Start date of MBR, date of the day immediately following the day of the previous physical inventory taking. 5. End report: End date of MBR, date of current physical inventory taking. 6. Report number: Sequential number used for inventory change reports, material balance reports and physical inventory listings, no gaps. 7. Line count: Total number of lines reported. 8. Reporting person: Name of the person responsible for the report. 9. IC code: The different types of inventory information and of inventory change shall be entered in the sequence indicated below. The following codes shall be used: Keyword Code Explanation Beginning physical inventory PB Physical inventory at the beginning of the reporting period (shall be equal to the physical inventory at the end of the previous reporting period). Separate lines per element and per safeguard obligation Inventory changes (only codes in the list below)   For each type of inventory change, one consolidated line (per element and per safeguard obligation) has to be entered for the entire reporting period (first increases, then decreases). Ending book inventory BA Book inventory at the end of the reporting period. It shall be equal to the arithmetic sum of the MBR entries above. Separate lines per element and per safeguard obligation Ending physical inventory PE Physical inventory at the end of the reporting period. Separate lines per element and per safeguard obligation Material unaccounted for MF Material unaccounted for. Shall be calculated as ‘ending physical inventory (PE)’ minus ‘ending book inventory (BA)’. Separate lines per element and per safeguard obligation For inventory changes, one of the following codes shall be used: Keyword Code Explanation Receipt RD Receipt of nuclear material from a material balance area within the European Union. Import RF Import of nuclear material from a third country. Receipt from non-safeguarded activity RN Receipt of nuclear material from a non-safeguarded activity (Article 39). Shipment SD Transfer of nuclear material to a material balance area within the European Union. Export SF Export of nuclear material to a third country Shipment to non-safeguarded activity SN Transfer of nuclear material to a non-safeguarded activity (Article 39). Transfer to conditioned waste TC Nuclear material contained in waste that is measured or estimated on the basis of measurements, and which has been conditioned in such a way (e.g. in glass, cement, concrete or bitumen) that it is not suitable for further nuclear use. Installations may be authorized to use this code based on a reasoned and justified request and agreed reporting modalities. Separate records shall be kept for this type of material. Transfer to a geological disposal area TG Transfer of nuclear material which is neither considered as retained nor as conditioned waste into a geological disposal area. Discards to the environment TE Nuclear material that is measured or estimated on the basis of measurements, and which has been irrevocably discarded to the environment as the result of a planned discharge (Article 36(1)(a)). Transfer to retained waste TW Nuclear material generated from processing or from an operational accident contained in waste that is measured or estimated on the basis of measurements, and which has been transferred to a specific location within the material balance area from which it could be retrieved and which is deemed to be not recoverable for the time being. Separate records shall be kept for this type of material. Retransfer from conditioned waste FC Retransfer of conditioned waste to the inventory of the material balance area. This applies whenever conditioned waste undergoes processing. Retransfer from a geological disposal area FG Retrieval of nuclear material from a geological disposal area after it was declared as transfer to that geological disposal area. Use of this code requires a special report to be sent to the Commission. Retransfer from retained waste FW Retransfer of retained waste to the inventory of the material balance area. This applies whenever retained waste is retrieved from the specific location within the material balance area, either for any processing involving the separation of elements in the material balance area or for any shipment from the material balance area. Accidental loss LA Irretrievable and inadvertent loss of a quantity of nuclear material as the result of an operational accident. Use of this code requires a special report to be sent to the Commission. Accidental gain GA Nuclear material unexpectedly found, except when detected in the course of a physical inventory taking. Use of this code requires a special report to be sent to the Commission. Decommissioning gain GD Nuclear material arisen during decommissioning activities or exceptional operations. Installations may be authorized to use this code based on a reasoned and justified request. Category change CE Accountancy transfer of a quantity of nuclear material from one category (Article 21) to another as a result of an enrichment process (only one line to be reported per category change). Category change CB Accountancy transfer of a quantity of nuclear material from one category (Article 21) to another as a result of a blending operation (only one line to be reported per category change). Category change CC Accountancy transfer of a quantity of nuclear material from one category (Article 21) to another for all types of category change not covered by codes CE and CB (only one line to be reported per category change), such as during irradiation or for exceptional and justified reasons. Change in particular obligation BR Accountancy transfer of a quantity of nuclear material from one particular safeguard obligation to another (Article 19(1)), to balance the total uranium stock following a blending operation (only one line to be reported per change of obligation). Change in particular obligation PR Accountancy transfer of a quantity of nuclear material from one particular safeguard obligation to another (Article 19(1)), used when nuclear material enters or leaves an accountancy pool (only one line to be reported per change of obligation). Change in particular obligation SR Accountancy transfer of a quantity of nuclear material from one particular safeguard obligation to another (Article 19(1)), following an obligation exchange or a substitution (only one line to be reported per change of obligation). The use of this code requires prior authorization (Article 20(1)). Change in particular obligation CR Accountancy transfer of a quantity of nuclear material from one particular safeguard obligation to another (Article 19(1)), for all cases not covered by codes BR, PR or SR (only one line to be reported per change of obligation). Nuclear production NP Increase in the quantity of nuclear material due to nuclear transformation. Nuclear loss NL Decrease in the quantity of nuclear material due to nuclear transformation. Shipper/receiver difference DI Shipper/receiver difference. New measurement NM Quantity of nuclear material, in one particular batch, accounted for in the nuclear material balance area, being the difference between a newly measured quantity and the quantity formerly accounted for, and which is neither a shipper/receiver difference nor a correction. Roundings RA Rounding adjustment to make the sum of the quantities reported in a given period coincide with the ending book inventory of the material balance area. Isotope adjustment R5 Adjustment to make the sum of the isotope quantities reported coincide with the ending book inventory for U-235 of the material balance area. Material production MP Quantity of nuclear material, obtained from substances originally not subject to safeguards, which has become subject to safeguards because its concentration now exceeds the minimum levels. Termination of use TU Quantity of nuclear material considered as irrecoverable for practical or economic reasons which is incorporated in end products used for non-nuclear purposes (Article 36(1)(b)). The use of this code requires prior authorization. Termination of safeguards TZ Quantity of nuclear material considered as irrecoverable for practical or economic reasons which is contained in waste in very low concentrations measured or estimated on the basis of measurements, even if these materials are not discarded to the environment (Article 36(1)(c)). Installations may be authorized to use this code based on a reasoned and justified request and agreed reporting modalities. 10. Line number: Sequential number starting with 1, no gaps. 11. Element category: The element category of the nuclear material, using the category codes as laid out in Annex III (25) to this Regulation. 12. Element weight: The weight of the element category referred to in field 11 shall be reported. All weights shall be reported in grams. The decimal digits appearing in the accounting lines can be reported up to a maximum of three decimal places. 13. Isotope: This code indicates the kind of fissile isotopes involved and shall be used when the weight of fissile isotopes is reported. Use the codes as laid out in Annex III (27) to this Regulation. 14. Fissile weight: Unless otherwise stated in the particular safeguard provisions, the weight of fissile isotopes shall only be reported for enriched uranium and category changes involving enriched uranium. All weights shall be reported in grams. The decimal digits appearing in the accounting lines can be reported up to a maximum of three decimal places. 15. Obligation: Indication of the particular safeguard obligation assumed by the Community under an Agreement concluded with a third country or an international organisation, to which the material is subject (Article 19). It may also correspond to a pool code, where authorised pursuant to Article 20. The Commission shall communicate the appropriate codes to the installations on request. 16. Correction: Corrections have to be made by deleting the wrong line(s) and adding the correct one(s), where appropriate. The following codes shall be used: Code Explanation D Deletion. The line to be deleted shall either be: — identified by indicating in field 17 the report number (6) and in field 18 the line number (11), as well as in field 21 the CRC (20) which were declared for the original line. Other fields need not be reported; or — repeated in its entirety. Fields may contain codes no longer in use under this Regulation A Addition (forming part of a deletion/addition pair). The correct line shall be reported with all data fields, including the ‘previous report’ field (17) and the ‘previous line’ field (18). The ‘previous line’ field (18) shall repeat the line number (10) of the line being replaced by the deletion/addition pair L Late line (stand-alone addition). The late line to be added shall be reported with all data fields, including the ‘previous report’ field (17). The ‘previous report’ field (17) shall contain the report number (6) of the report in which the late line should have been included 17. Previous report: Indicate the report number (6) of the line to be corrected. 18. Previous line: For deletions, or additions forming part of a deletion/addition pair, indicate the line number (10) of the line to be corrected. 19. Comment: Free-text comment field for short comments by operator. 20. CRC: Hash code of line for quality control purposes. The Commission shall inform the operator of the algorithm to be used. 21. Previous CRC: Hash code of the line to be corrected. GENERAL REMARKS CONCERNING THE COMPLETION OF THE REPORTS General remarks 2, 3, 4, 5 and 6 at the end of Annex III apply mutatis mutandis .

Read the full instrument →

Other provisions in Commission Regulation (Euratom) 2025/974

Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗ · Data as of 2026-07-04

CitationANNEX IV of Commission Regulation (Euratom) 2025/974 (LawPlayer, data as of 2026-07-04)

© European Union, https://eur-lex.europa.eu, 1998-2026. Reuse authorised under Commission Decision 2011/833/EU, provided the source is acknowledged.

What to look at next