Schedule SCHEDULESupplementary
(Section 2) RENEWABLE RESOURCES, FEED-IN TARIFF RATES, EFFECTIVE PERIOD AND ANNUAL DEGRESSION RATES First Column Second Column Third Column Fourth Column Fifth Column Effective period Annual Feed-in tariff rate Renewable (commencing from degression Description of qualifying renewable energy installation (in ringgit per resource the feed-in tariff rate kilowatt hour) commencement date) Biogas (a) Renewable energy installation having an installed Basic feed-in tariff capacity of: rate (i) up to and including 4 megawatts 0.32 16 years 0.5 % (ii) above 4 megawatts, and up to and including 0.30 16 years 0.5 % 10 megawatts (iii) above 10 megawatts, and up to and including 0.28 16 years 0.5 % 30 megawatts (b) Renewable energy installation having any one or Bonus feed-in tariff more of the following criteria in addition to (a) rate in addition to above: basic feed-in tariff rate (i) use of gas engine technology with electrical + 0.02 16 years 0.5 % efficiency of above 40% (ii) use of locally manufactured or assembled gas + 0.01 16 years 0.5 % engine technology (iii) use of landfill or sewage gas as fuel source + 0.08 16 years 1.8 % First Column Second Column Third Column Fourth Column Fifth Column Effective period Annual Feed-in tariff rate Renewable (commencing from degression Description of qualifying renewable energy installation (in ringgit per resource the feed-in tariff rate kilowatt hour) commencement date) Biomass (a) Renewable energy installation having an installed Basic feed-in tariff capacity of: rate (i) up to and including 10 megawatts 0.31 16 years 0.5 % (ii) above 10 megawatts, and up to and including 0.29 16 years 0.5 % 20 megawatts (iii) above 20 megawatts, and up to and including 0.27 16 years 0.5 % 30 megawatts (b) Renewable energy installation having any one or Bonus feed-in tariff more of the following criteria in addition to (a) rate in addition to Laws of Malaysia above: basic feed-in tariff rate (i) use of gasification technology + 0.02 16 years 0.5 % (ii) use of steam-based electricity generating systems + 0.01 16 years 0.5 % with overall efficiency of above 14% (iii) use of locally manufactured or assembled + 0.01 16 years 0.5 % gasification technology (iv) use of municipal solid waste as fuel source + 0.10 16 years 1.8 % ACT 725 Small Renewable energy installation having an installed 0.24 21 years 0% hydropower capacity of up to and including 10 megawatts Renewable energy installation having an installed 0.23 21 years 0% capacity of above 10 megawatts, and up to and including 30 megawatts Solar (a) Renewable energy installation having an installed Basic feed-in tariff photovoltaic capacity of: rate (i) up to and including 4 kilowatts 1.23 21 years 8.0 % (ii) above 4 kilowatts, and up to and including 1.20 21 years 8.0 % 24 kilowatts (iii) above 24 kilowatts, and up to and including 1.18 21 years 8.0 % 72 kilowatts Renewable Energy (iv) above 72 kilowatts, and up to and including 1.14 21 years 8.0 % 1 megawatt (v) above 1 megawatt, and up to and including 0.95 21 years 8.0 % 10 megawatts (vi) above 10 megawatts, and up to and including 0.85 21 years 8.0 % 30 megawatts First Column Second Column Third Column Fourth Column Fifth Column Effective period Annual Feed-in tariff rate Renewable (commencing from degression Description of qualifying renewable energy installation (in ringgit per resource the feed-in tariff rate kilowatt hour) commencement date) (b) Renewable energy installation having any one or Bonus feed-in tariff more of the following criteria in addition to (a) rate in addition to above: basic feed-in tariff rate (i) use as installations in buildings or building + 0.26 21 years 8.0 % structures (ii) use as building materials + 0.25 21 years 8.0 % (iii) use of locally manufactured or assembled solar + 0.03 21 years 8.0 % photovoltaic modules (iv) use of locally manufactured or assembled solar + 0.01 21 years 8.0 % Laws of Malaysia inverters All intermediate calculations and the final feed-in tariff rates under this Schedule shall be rounded to the fourth decimal place in ringgit per kilowatt hour and a figure of five or more in the fifth decimal place shall result in a rounding up of the fourth decimal. DICETAK OLEH PERCETAKAN NASIONAL MALAYSIA BERHAD, KUALA LUMPUR BAGI PIHAK DAN DENGAN PERINTAH KERAJAAN MALAYSIA