Subject matter and scope

Article 1

Open ↗

This Decision lays down rules concerning the determination of the start-up and shut-down periods referred to in point (27) of Article 3 and in point 1 of Part 4 of Annex V to Directive 2010/75/EU. This Decision shall apply to combustion plants covered by Chapter III of Directive 2010/75/EU.

Definitions

Article 2

Open ↗

For the purposes of this Decision the following definitions apply: (1) ‘minimum start-up load for stable generation’ means the minimum load compatible with the steady operation of the generating combustion plant following start-up initiation after which the plant is able to safely and reliably deliver its output to a network, grid, heat accumulator or industrial site; (2) ‘minimum shut-down load for stable generation’ means the minimum load at which point the plant can no longer safely and reliably deliver its output to a network, grid, heat accumulator or industrial site and is considered to be shutting down.

General rules for determining start-up and shut-down periods

Article 3

Open ↗

For determining the end of the start-up period and the beginning of the shut-down period, the following rules shall apply: (1) the criteria or parameters used to determine start-up and shut-down periods shall be transparent and externally verifiable; (2) the determination of start-up and shut-down periods shall be based on conditions allowing a stable generation process safeguarding health and safety; (3) periods during which a combustion plant, after start-up, is operating stably and safely with fuel supply but without the export of heat or electricity or mechanical energy shall not be included in the start-up or shut-down periods.

Determination of start-up and shut-down periods in the permit

Article 4

Open ↗

1.   For the purposes of the determination of start-up and shut-down periods in the permit of the installation comprising the combustion plant, the measures referred to in Article 14(1)(f) of Directive 2010/75/EU shall include: (a) at least one of the following: (i) the end point of the start-up period and the start point of the shut-down period expressed as load thresholds, in accordance with Articles 6, 7 and 8 and considering that the minimum shut-down load for stable generation may be lower than the minimum start-up load for stable generation as the combustion plant may be able to operate stably at a lower load once it has reached a sufficient temperature following a period of operation; (ii) discrete processes or thresholds for operational parameters, which are associated with the end of the start-up period, and with the start of the shut-down period, and which are clear, easily monitored and applicable to the technology used, as set out in Article 9; (b) measures ensuring that the start-up and shut-down periods are minimised as far as practicable; (c) measures ensuring that all abatement equipment is brought into operation as soon as is technically practicable. For the purposes of the first subparagraph, account shall be taken of the technical and operational characteristics of the combustion plant and its units, and the technical requirements for operating the abatement techniques installed. 2.   If any aspects relating to the plant that affect start-up and shut-down periods change, including the installed equipment, fuel type, plant role in the system and installed abatement techniques, the permit conditions related to start-up and shut-down periods shall be reconsidered and, if necessary, updated by the competent authority.

Determination of start-up and shut-down periods for combustion plants consisting of two or more units

Article 5

Open ↗

1.   For the purpose of calculating the average emission values as set out in point 1 of Part 4 of Annex V to Directive 2010/75/EU, the following rules shall apply for determining the start-up and shut-down periods of combustion plants consisting of two or more units: (a) the values measured during the start-up period of the first unit starting up and during the shut-down period of the last combustion unit shutting down shall be disregarded; (b) the values determined during other start-up and shut-down periods of individual units shall be disregarded only if they are measured or, where no measurement is technically or economically feasible, calculated separately for each of the units concerned. 2.   For the purpose of point (27) of Article 3 of Directive 2010/75/EU, the start-up and shut-down periods of combustion plants consisting of two or more units shall only consist of the start-up period of the first combustion unit starting up and the shut-down period of the last combustion unit shutting down. For combustion plants for which points 2, 4 and 6 of Part 1 of Annex V to Directive 2010/75/EU allow the application of an emission limit value to part of the plant discharging its waste gases through one or more separate flues within a common stack, the start-up and shut-down periods may be determined for each of those parts of the combustion plant separately. The start-up and shut-down periods for a part of the plant shall then consist of the start-up period of the first combustion unit starting up within that part of the plant and the shut-down period of the last combustion unit shutting down within that part of the plant.

Determination of start-up and shut-down periods for combustion plants generating electricity or delivering power for mechanical drive using load thresholds

Article 6

Open ↗

1.   For combustion plants generating electricity and for combustion plants for mechanical drive, the start-up period shall be considered to end at the point when the plant reaches the minimum start-up load for stable generation. 2.   The shut-down period shall be considered to begin at the initiation of termination of fuel supply after reaching the point of the minimum shut-down load for stable generation from where on generated electricity is no longer available for the grid or generated mechanical power is no longer useful for the mechanical load. 3.   The load thresholds to be used for determining the end of the start-up period and the start of the shut-down period for electricity generating combustion plants and to be included in the plant’s permit shall be a fixed percentage of the rated electrical output of the combustion plant. 4.   The load thresholds to be used for determining the end of the start-up period and the start of the shut-down period for combustion plant for mechanical drive and to be included in the plant’s permit shall be a fixed percentage of the mechanical power output of the combustion plant.

Determination of start-up and shut-down periods for heat generating combustion plants using load thresholds

Article 7

Open ↗

1.   For heat-generating combustion plants, the start-up period shall be considered to end when the plant reaches the minimum start-up load for stable generation and heat can be safely and reliably delivered to a distributing network, to a heat accumulator or used directly on a local industrial site. 2.   The shut-down period shall be considered to begin after reaching the minimum shut-down load for stable generation when heat can no longer be safely and reliably delivered to a network or used directly on a local industrial site. 3.   The load thresholds to be used for determining the end of the start-up period and the beginning of the shut-down period for heat generating combustion plants and to be included in the plant’s permit shall be a fixed percentage of the rated thermal output of the combustion plant. 4.   Periods in which heat-generating plants are heating up an accumulator or reservoir without exporting heat shall be considered as operating hours and not as start-up or shut-down periods.

Determination of start-up and shut-down periods for combustion plants generating heat and electricity using load thresholds

Article 8

Open ↗

For combustion plants generating electricity and heat, the start-up and shut-down periods shall be determined as set out in Articles 6 and 7, taking into account both the electricity and heat generated.

Determination of start-up and shut-down periods using operational parameters or discrete processes

Article 9

Open ↗

For determining the minimum start-up load and the minimum shut-down load for stable generation, at least three criteria shall be defined, with the end of start-up or start of shut-down periods reached when at least two of the criteria have been met. These criteria shall be chosen from the following: (1) discrete processes set out in the Annex or equivalent processes that suit the technical characteristics of the plant; (2) thresholds for the operational parameters set out in the Annex, or equivalent operational parameters that suit the technical characteristics of the plant.

Supplementary provisions

ANNEXSupplementary provisions

Open ↗

ANNEX DISCRETE PROCESSES AND OPERATIONAL PARAMETERS ASSOCIATED WITH START-UP AND SHUT-DOWN PERIODS 1.    Discrete processes associated with the minimum start-up load for stable generation 1.1. For solid fuel-fired boilers: complete transition from using the stability auxiliary burners or supplementary burners to operating with normal fuel only. 1.2. For liquid fuel-fired boilers: start of the main fuel feed pump and when burner oil pressure stabilises, and for which fuel flow rate may be used as an indicator. 1.3. For gas turbines: point where the combustion mode switches to fully premixed steady state combustion mode, or ‘idle speed’. 2.    Operational parameters 2.1. Oxygen content of the flue gases. 2.2. Flue gas temperature. 2.3. Steam pressure. 2.4. For heat producing plants: enthalpy and heat transfer fluid rate. 2.5. For liquid and gas fired plants: fuel flow rate, specified as a percentage of the rated fuel flow capacity. 2.6. For steam boiler plants: temperature of steam at the exit of the boiler.

Other acts of the same type
Council Implementing Decision (CFSP) 2020/118 of 27 January 2020 implementing Decision (CFSP) 2017/1775 concerning restrictive measures in view of the situation in MaliCommission Decision (EU) 2021/104 of 24 January 2020 on SA.39182 (2017/C) (ex 2017/NN) (ex 2014/CP) – Alleged illegal aid to AS Tartu Agro (notified under document C(2020) 252) (Only the Estonian text is authentic)Commission Decision (EU) 2020/108 of 23 January 2020 amending the Annex to the Monetary Agreement between the European Union and the Republic of San MarinoCommission Decision (EU) 2020/109 of 23 January 2020 amending the Annex to the Monetary Agreement between the European Union and the Vatican City StateCommission Implementing Decision (EU) 2020/113 of 23 January 2020 amending Decision 2009/11/EC authorising methods for grading pig carcasses in Spain (notified under document C(2020) 232) (Only the Spanish text is authentic)Commission Delegated Decision (EU) 2020/548 of 23 January 2020 amending Annex V to Directive 2005/36/EC of the European Parliament and of the Council as regards the evidence of formal qualifications and titles of training courses (notified under document C(2020) 229) (Text with EEA relevance)Commission Implementing Decision (EU) 2020/95 of 22 January 2020 amending Implementing Decision (EU) 2016/2323 establishing the European List of ship recycling facilities pursuant to Regulation (EU) No 1257/2013 of the European Parliament and of the Council (Text with EEA relevance)Decision (EU) 2020/141 of the European Central Bank of 22 January 2020 amending Decision ECB/2010/29 on the issue of euro banknotes (ECB/2020/7)Commission Decision (EU) 2020/450 of 22 January 2020 on the aid scheme SA.29150 – 2010/C (ex 2010/NN) implemented by Germany on the fiscal carry-forward of losses in case of restructuring of companies in difficulty (Sanierungsklausel) (notified under document C(2020) 254) (Only the German text is authentic) (Text with EEA relevance)Council Decision (EU) 2020/48 of 21 January 2020 amending Decision (EU) 2019/274 on the signing, on behalf of the European Union and of the European Atomic Energy Community, of the Agreement on the withdrawal of the United Kingdom of Great Britain and Northern Ireland from the European Union and the European Atomic Energy Community (Text with EEA relevance)Council Decision (EU) 2020/142 of 21 January 2020 on the conclusion of the Protocol between the European Union, the Swiss Confederation and the Principality of Liechtenstein to the Agreement between the European Community and the Swiss Confederation concerning the criteria and mechanisms for establishing the State responsible for examining a request for asylum lodged in a Member State or in Switzerland regarding access to Eurodac for law enforcement purposesCouncil Decision (EU) 2020/244 of 20 January 2020 on the conclusion, on behalf of the Union, of the Enhanced Partnership and Cooperation Agreement between the European Union and its Member States, of the one part, and the Republic of Kazakhstan, of the other part