Determination of start-up and shut-down periods for combustion plants generating electricity or delivering power for mechanical drive using load thresholds

Article 6

1.   For combustion plants generating electricity and for combustion plants for mechanical drive, the start-up period shall be considered to end at the point when the plant reaches the minimum start-up load for stable generation. 2.   The shut-down period shall be considered to begin at the initiation of termination of fuel supply after reaching the point of the minimum shut-down load for stable generation from where on generated electricity is no longer available for the grid or generated mechanical power is no longer useful for the mechanical load. 3.   The load thresholds to be used for determining the end of the start-up period and the start of the shut-down period for electricity generating combustion plants and to be included in the plant’s permit shall be a fixed percentage of the rated electrical output of the combustion plant. 4.   The load thresholds to be used for determining the end of the start-up period and the start of the shut-down period for combustion plant for mechanical drive and to be included in the plant’s permit shall be a fixed percentage of the mechanical power output of the combustion plant.

Read the full instrument →

Other provisions in 2012/249/EU: Commission Implementing Decision of 7 May 2012…

Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗ · Data as of 2026-07-04

CitationArticle 6 of 2012/249/EU: Commission Implementing Decision of 7 May 2012… (LawPlayer, data as of 2026-07-04)

© European Union, https://eur-lex.europa.eu, 1998-2026. Reuse authorised under Commission Decision 2011/833/EU, provided the source is acknowledged.

What to look at next