Determination of start-up and shut-down periods using operational parameters or discrete processes

Article 9

For determining the minimum start-up load and the minimum shut-down load for stable generation, at least three criteria shall be defined, with the end of start-up or start of shut-down periods reached when at least two of the criteria have been met. These criteria shall be chosen from the following: (1) discrete processes set out in the Annex or equivalent processes that suit the technical characteristics of the plant; (2) thresholds for the operational parameters set out in the Annex, or equivalent operational parameters that suit the technical characteristics of the plant.

Read the full instrument →

Other provisions in 2012/249/EU: Commission Implementing Decision of 7 May 2012…

Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗ · Data as of 2026-07-04

CitationArticle 9 of 2012/249/EU: Commission Implementing Decision of 7 May 2012… (LawPlayer, data as of 2026-07-04)

© European Union, https://eur-lex.europa.eu, 1998-2026. Reuse authorised under Commission Decision 2011/833/EU, provided the source is acknowledged.

What to look at next