Commission Regulation (EU) 2016/1719 Article 31

Commission Regulation (EU) 2016/1719 Article 31

Regional design of long-term transmission rights

Article 31

1.   Long-term cross-zonal capacity shall be allocated to market participants by the allocation platform in the form of physical transmission rights pursuant to the UIOSI principle or in the form of FTRs — options or FTRs — obligations. 2.   All TSOs issuing long-term transmission rights shall offer long-term cross-zonal capacity, through the single allocation platform, to market participants for at least annual and monthly time frames. All TSOs in each capacity calculation region may jointly propose to offer long-term cross-zonal capacity on additional time frames. 3.   No later than six months after the entry into force of this Regulation, TSOs in each capacity calculation region where long-term transmission rights exist shall jointly develop a proposal for the regional design of long-term transmission rights to be issued on each bidding zone border within the capacity calculation region. No later than six months after the coordinated decisions of the regulatory authorities of the bidding zone border to introduce long-term transmission rights pursuant Article 30(2), TSOs of the concerned capacity calculation region, shall jointly develop a proposal for the regional design of long-term transmission rights to be issued on each bidding zone border within the concerned capacity calculation region. Regulatory authorities of Member States in which the current regional design of long-term transmission rights is part of a TSO cross-border re-dispatch arrangement for the purpose of ensuring that operation remains within operational security limits may decide to maintain physical long-term transmission rights on its bidding zone borders. 4.   The proposals referred to in paragraph 3 shall include a time schedule for implementation and at least the description of the following items specified in the allocation rules: (a) type of long-term transmission rights; (b) forward capacity allocation time frames; (c) form of product (base load, peak load, off-peak load); (d) the bidding zone borders covered. 5.   The proposals shall be subject to consultation in accordance with Article 6. For the proposed long-term transmission rights to be issued, each TSO shall duly consider the result of the consultation. 6.   The allocation of physical transmission rights and FTRs — options in parallel at the same bidding zone border is not allowed. The allocation of physical transmission rights and FTRs — obligations in parallel at the same bidding zone border is not allowed. 7.   A review of long-term transmission rights offered on a bidding zone border may be launched by: (a) all regulatory authorities of the bidding zone border, at their own initiative; or (b) all regulatory authorities of the bidding zone border based upon a recommendation from the Agency or joint request by all TSOs of the concerned bidding zone border. 8.   All TSOs in each capacity calculation region shall be responsible for undertaking the review as provided for in paragraph 9. 9.   Each TSO involved in the review of long-term transmission rights shall: (a) assess the offered long-term transmission rights taking into account the characteristics in paragraph 4; (b) if considered necessary, propose alternative long-term transmission rights, taking into account the result of the assessment in subparagraph (a); (c) carry out a consultation in accordance with Article 6 regarding: (i) the results of the assessment of the offered long-term transmission rights; (ii) if applicable, the proposal for alternative long-term transmission rights. 10.   Following the consultation referred to in paragraph 9(c) and within three months of the issuance of the decision to launch a review, the TSOs of the capacity calculation region concerned shall jointly submit a proposal to the competent regulatory authorities to maintain or amend the type of long-term transmission rights.

Read the full instrument → · Read this in context: Section 2 — Options for cross-zonal transmission risk hedging →

Other provisions in Section 2 — Options for cross-zonal transmission risk hedging

Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗ · Data as of 2026-07-04

CitationArticle 31 of Commission Regulation (EU) 2016/1719 (LawPlayer, data as of 2026-07-04)