My bookmarksSign up free

PD 475 TITLE I—TELECOMMUNICATIONS

Section 2–17 · 15 provisions

Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails.Read the official text ↗

Miscellaneous Projects.

Section 2

SEC. 2. Miscellaneous Projects.—The following sums, or so much thereof as may be necessary are hereby appropriated, out of the general funds in the national treasury, not otherwise appropriated, subject to the provisions hereinafter set forth, for the purposes mentioned hereunder. a) For the maintenance and/or repair of public buildings, shrines and monuments, including ground and outside installations: Provided, That, so much as may be necessary but not to exceed Pl,000,000 of this sum shall be made available for Malacañang buildings and Mansion and Guest Houses in Baguio: Provided, further, That P50,000 of this sum shall be made available for the maintenance of the Mabini Shrine in Tanauan, Batangas, including the salaries of the two caretakers of the shrine who shall be the two nearest surviving kin of Apolinario Mabini 10,000,000 b) For the operation, maintenance and repair of airports, buildings and outside installations, including the purchase of necessary materials and supplies 10,000,000 c) For the maintenance, repair and operation of existing air navigation facilities, including the purchase of necessary materials and supplies 15,000,000 d) For the operation and maintenance of River Control Dredging Fleet, including the deepening and widening of rivers and esteros for flood control and drainage purposes and acquisition of necessary spare parts, supplies and equipment 5,000,000 e) For the maintenance of existing flood control and drainage structures including operation, construction, and maintenance of flood control hydraulic models 5,000,000 f) For the emergency repair of damages of existing river control works 5,000,000 g) For the prosecution of pre-investment studies, regional planning, project pre-feasibility and feasibility studies, preliminary engineering and other activities necessary and prior to actual project implementation, including administrative services and training directly identified with the studies and purchase of equipment, materials, and supplies as may be authorized by the National Economic and Development Authority upon recommendation of the Secretary of Public Works, Transportation and Communications and other department heads concerned 50,000,000 h) For the prosecution of necessary detailed engineering of projects authorized in this and other public works measures, including detailed surveys, soil investigations, detailed designs preparation of specifications and contract documents, and other related activities that are necessary prior to actual construction, as may be authorized by the National Eco-nomic and Development Authority upon recommendation of the Secretary of Public Works, Transportation and Communications and other department heads concerned 100,000,000 i) For the purchase of necessary rights-of-way for the implementation of projects authorized in this and other public works measures as may be authorized by the National Economic and Development Authority upon recommendation of the Secretary of Public Works, Transportation and Communications and other department heads concerned 80,000,000 ___________ Total for Section 2 P280,000,000 ==========

Apportionment of the Portworks Special Fund.

Section 3

SEC. 3. Apportionment of the Portworks Special Fund.— The following sums, or so much thereof as may be necessary are hereby apportioned and authorized to be released out of the Portworks Special Fund as provided in Act No. 3592, as amended, not otherwise apportioned, to implement the portworks projects which pertain to the Capital Development Program of the Administration, subject to the provisions hereinafter set forth and for the purposes mentioned hereunder: TITLE K—PORTWORKS AND MARITIME NAVIGATION 1. For the construction, installation, improvements, rehabilitation, reconstruction, including project preparation and purchase of necessary materials and supplies, of the projects summarized hereunder: (a) National Ports 1. Port of Manila P 80,000,000 2. Port of Davao, Sasa 35,000,000 3. Port of Davao, Santa Ana 5,000,000 4. Port of Iligan, Iligan City 10,000,000 5. Port of Cotabato (Polloc), Cotabato City 10,000,000 6. Port of Cagayan de Oro City 7,000,000 7. Port of General Santos City 13,000,000 8. Port of Nasipit, Agusan 67,000,000 9. Port of Zamboanga City 45,000,000 10. Various National Ports 50,000,000 ___________ Total for National Ports P322,000,000 ========== (b) Municipal Ports 11. Port of Orani, Bataan 100,000 12. Port of Orion, General Capinpin, Bataan 250,000 13. Port of Macalilon, Quezon 150,000 14. Port of Mamburao, Mindoro Occidental 75,000 15. Port of Balatao, Talisay, Batangas 230,000 16. Port of Santo Tomas Wharf, Tingloy, Batangas 100,000 17. Port of Sagnay, Bugalon, Cama rines Sur 150,000 18. Port of Matnog, Sorsogon 100,000 19. Port of Castilla, Sorsogon 300,000 20. Port of Estancia, Iloilo 100,000 21. Port of Catagbacan, Lo-on, Bohol 65,000 22. Port of Ubay, Bohol 100,000 23. Port of Barrio Matarinao, Salcedo, Eastern Samar 100,000 24. Port of Marvo Allen, Northern Samar 100,000 25. Port of Lavezares, Barobaybay, Northern Samar 150,000 26. Port of Pambujan, Paninirongan, Northern Samar 100,000 27. Port of Padre Burgos, Leyte 100,000 28. Port of Taguilon, Zamboanga del Sur 130,000 29. Port of Davao, Dawa Alicia 100,000 30. Port of Benoni, Camiguin 100,000 31. Port of Medina, Misamis Oriental 100,000 32. Port of Jasaan, Misamis Oriental 100,000 33. Port of Gingoog, Misamis Oriental 150,000 34. Port of Tamparan, Lanao del Sur 100,000 35. Port of Lianga, Surigao del Sur 100,000 36. Port of Cortes, Surigao del Sur 120,000 37. Port of Cantilan, Surigao del Sur 300,000 38. Various Municipal Ports 2,000,000 Total for Municipal Ports P 5,570,000 ___________ P327,570,000 Total for Ports ========== 2. For the survey, investigation, construction, rehabilitation, reconstruction, dredging, reclamation, improvement, and/or completion of other national ports including supplies to be alloted by the Secretary of Public Works, Transportation and Communications upon the recommendation of the Director of Public Works P 20,000,000 3. For the survey, investigation, construction, rehabilitation, reconstruction, dredging, reclamation, improvement, and/or completion of municipal ports and harbors including purchase of necessary materials and supplies to be alloted by the Secretary of Public Works, Transportation and Communications upon recommendation of the Director of Public Works 5,000,000 4. For the construction, installation, rehabilitation, reconstruction, repair and/or improvement of lighthouse stations and/or other aides to navigation, including the survey and investigation of sites and the purchase of necessary materials and supplies, to be alloted by the Secretary of Public Works, Transportation and Communications upon recommendation of the Director of Public Works 5,000,000 ___________ Total for Section 3 Portworks Special Funds P357,570,000 ========== SPECIAL PROVISIONS

Program of Work Required Before Prosecuting Public Works.

Section 4

SEC. 4. Program of Work Required Before Prosecuting Public Works.—Before prosecuting any public works project, the district, city or project engineer concerned shall prepare a program of works for approval by the Department Head concerned for any project with an estimated cost of more than P500,000; by the Bureau Head concerned for any project with an estimated cost more than P200,000 but not more than P500,000; by the Regional Director concerned for any project with an estimated cost of more than P50.000 but not more than P200,000; and, by the District or City Engineer concerned for any project with an estimated cost of P50,000 or less. In no case shall construction funds be remitted to field offices or construction work on a project be started before the program of work is approved. No program of work for any project which requires special site investigation, survey, and construction plans shall be approved unless such plans are used as basis of the program: Provided, That for project with an estimated cost of P100,000 or more the PERT/CPM technique shall be used and a time-scaled diagram of the activities as well as a monthly cash flow shall be made part of the program of work. The program of work for any project shall not be amended except in case of unforeseen contingencies or any change in field conditions or other similar circumstances in which case an amendment may be allowed provided that such amendment will not result in the impairment of the expected accomplishment in excess of fifteen per centum thereof. SEC. 5. Preliminary Studies.—In the implementation of the work, a general plan of operations shall be prepared to indicate the methods and procedures to be followed. This plan will cover and organize all relevant fields of study, delineation or responsibilities for undertaking each phase, specifying all analytical procedures and resources to be required for conducting the studies: Provided, That the appropriation shall include administrative services directly identified with the studies and purchase of equipment, materials and supplies.

Rental of Equipment.

Section 6

SEC. 6. Rental of Equipment.—Rental of equipment shall not be deducted at the time of the release of funds for public works or even in anticipation of use of the equipment but shall be paid based on actual use when the appropriation so released is P25,000 or less. When the appropriation so released is above P25,000 and use of rented equipment is anticipated, then deduction for rental shall be made at the time of the release of funds but such deduction shall not exceed ten per centum of the released appropriation: Provided, That should the amount so deducted be in excess of actual rental, the balance of such deduction should be remitted immediately to the district or city engineering office concerned.

Preference to Local Labor.

Section 7

SEC. 7. Preference to Local Labor.—In the execution and construction of any public works project, the labor requirements shall be filled by laborers from the sitio, barrio, poblacion or municipality where the project is being undertaken. However, in case of skilled labor, it may be procured elsewhere within the province where the project is located; and in the case of specialized skilled labor, it may be procured outside the province where the project is located.

Use of Private Consulting Service.

Section 8

SEC. 8. Use of Private Consulting Service.—For any public works project with an estimated cost of P200.000 or more, the Secretary of Public Works, Transportation and Communications may hire the services of Filipino or associated Filipino and foreign consultants or consulting firms whenever available, for a fee not exceeding two and one-half per centum of the estimated cost to review the project or plans and specifications devised by the bureau or office concerned, or for a fee not exceeding six per centum of the estimated cost to prepare the projects including plans and specifications thereof: Provided, That except for projects financed by loans from international lending institutions or projects financed in pursuance of bilateral agreements with foreign governments or their instrumentalities whose foreign consultants services are required, the participation of the Filipino consultants and/or implementing agency concerned in such, combined services shall be maximized.

Prosecution of Public Works Projects by Administration.

Section 9

SEC. 9. Prosecution of Public Works Projects by Administration.—The provisions of any law, rules or regulation to the contrary notwithstanding and irrespective of the source of funds, all public works projects with a cost of Two Hundred Thousand Pesos (P200,000) or less may be done by administration by the bureau or agency concerned without benefit of public bidding subject to the provision of Section seven, hereof. Public works projects with a cost of more than Two Hundred Thousand Pesos (P200, 000), shall, after public bidding, be awarded by contract. If there are no responsible bids for the project, or the bids are higher than the government estimate on the cost of the project, the project may be prosecuted by administration by the bureau or agency concerned after securing the approval of the Department Head. In case of urgent necessity or emergency, projects costing more than P200.000 may be prosecuted by administration without benefit of public bidding upon representation by the bureau or agency concerned, subject to favorable recommendation of the Department Head and approval by the President of the Philippines.

Purchase of Sites.

Section 10

SEC. 10. Purchase of Sites.—Any appropriation herein authorized for construction of any project shall be understood to cover the acquisition or purchase of sites whenever such acquisition or purchase is necessary for the prosecution of the project.

Purchase of Materials and Supplies.

Section 11

SEC. 11. Purchase of Materials and Supplies.—The Department Head concerned is authorized, in the interest of public service, subject to bidding and auditing requirements, to procure the necessary materials and supplies, needed for the construction, reconstruction, improvement, repair and/or maintenance of any public works project, regardless of the source of funds: Provided, That when such materials and supplies are obtainable locally in the district, city or neighboring districts, the same may be procurred by the District or City Engineer without prior authority from the Department Head: Provided, further, That, no surcharge shall be imposed for the service of procuring such materials and supplies: Provided, furthermore, That the cost of such materials and supplies shall not exceed the estimated cost of such materials and supplies stated in the approved program of work as provided under Section Four hereof.

Engineering Surcharge and Other Overhead Expenses.

Section 12

SEC. 12. Engineering Surcharge and Other Overhead Expenses.—No national surcharge shall be collected from the appropriation or expenditures authorized for any category of public works and all surcharges to be collected by the District or City Engineering office for administrative, overhead and engineering expenses, including the compensation and travel expenses as provided in Section Nine hereof and all other deductions shall not exceed ten per centum of expenditures of appropriation for any public works projects, so that ninety per cent of said appropriation shall be expended directly for the project: Provided, That nine per cent of said expenditures shall accrue to the District or city engineering office and one per cent shall accrue to the regional engineering offices concerned: Provided, further, That such surcharges shall be under the custody of the disbursing officers of the said engineering offices: Provided, finally, That such surcharges may be used for the purchase of motor vehicles and equipment.

Public Works Appropriations under this Decree, are National Disbursing Funds: Exceptions.

Section 13

SEC. 13. Public Works Appropriations under this Decree, are National Disbursing Funds: Exceptions.—All funds appropriated under the provisions of this Decree shall, when released, be carried in the account books of the treasurers or special disbursing funds and all projects herein specified are classified as national projects: Provided, That provincial fund allocated as counterpart shall not be considered as national fund.

Inter changeability of Financing Methods.

Section 14

SEC. 14. Inter changeability of Financing Methods.—The President of the Philippines or his duly authorized representative may modify the financing methods indicated in this Decree and previous Public Works Acts and Decree, so as to enable the Department Head concerned to undertake the projects authorized to be financed either from general revenue, from proceeds from the sale of bonds, from loans, or from a combination of these sources of funds, and, with respect to the portworks projects under Presidential Decree No. 3, from Portworks Special Fund, and/or from any of the aforementioned sources or from a combination thereof.

Other Financing Methods.

Section 15

SEC. 15. Other Financing Methods.—The provisions of existing laws, executive orders, rules and regulations to the contrary notwithstanding, the proceeds from the payment for reparations goods may be used for financing projects authorized in this Decree and any Public Works Act, including- the purchase of necessary equipment, construction materials and supplies.

Reports.

Section 16

SEC. 16. Reports.—The Department Head concerned shall submit an accomplishment report to the President. Such report shall include the appropriations released as of the date of said report and the percentage of work accomplished, further work to be done to complete the program of broad categories of public works and his recommendations if any, for transfer of appropriations or for program changes to be incorporated in the next Public Works Appropriations Measure.

Effectivity.

Section 17

SEC. 17. Effectivity.—This Decree shall take effect immediately. Done in the City of Manila, this 3rd day of June, in the year of Our Lord, nineteen hundred and seventy-four. (Sgd.) FERDINAND E. MARCOS President of the Philippines By the President: (Sgd.) ALEJANDRO MELCHOR Executive Secretary

Back to PD 475 — full text

Provisions on this page are reproduced verbatim from official open data. See the attribution line.

Source: Supreme Court E-Library, Republic of the Philippines. Philippine laws are public documents (works of the government).