熱門推薦罰單破解實戰交通警察名師 25 年經驗,親授警察臨檢、檢舉魔人、科技執法、車禍糾紛的執法邏輯看課程介紹
購物車我的課程我的書籤免費註冊
The Railways and Other Guided Transport Systems (Safety) Regulations 2006

The Railways and Other Guided Transport Systems (Safety) Regulations 2006 Sch 10 para 31

Sch 10 para 31

The organisation must have procedures to guarantee conformity with the essential requirements for interoperability, including updates throughout the lifecycle, by— (a) ensuring compliance with the specifications related to the basic parameters for interoperability as set out in the relevant NTSNs ; (b) verifying in all circumstances the consistency of the maintenance file with the authorisation of placing-in-service, including the requirements of a safety authority or the safety authority for the tunnel system, the declarations of conformity to NTSNs , the declarations of verification, and the technical file; (c) managing any substitution in the course of maintenance in compliance with the requirements of the relevant NTSNs ; (d) identifying the need for risk assessment regarding the potential impact of the substitution in question on the safety of the railway system; (e) managing the configuration of all technical changes affecting the system integrity of the vehicle.

Read this section in the full act → · Open its part →

Read the official text ↗

Contains public sector information licensed under the Open Government Licence v3.0.