The Railways (Interoperability) Regulations 2011

The Railways (Interoperability) Regulations 2011 reg 7

reg 7 Authorisation decision

(1) The Safety Authority must determine an application by— (a) authorising the placing in service of the structural subsystem; or (b) refusing the application for authorisation. (2) The Safety Authority must, and may only, issue an authorisation for the placing in service of a structural subsystem, where it is satisfied that— (a) the UK declaration of verification , if required, has been drawn up in accordance with Schedule 5 ; (b) the project subsystem is technically compatible with the rail system into which it is being integrated; ... (c) the project subsystem has been so designed, constructed and installed as to meet the essential requirements relating to that subsystem when placed in service; and, (d) the project entity has satisfactorily completed any tests required by regulations 5(4), and 6(4) and 6(5). (3) The Safety Authority may include conditions in an authorisation. (4) In this regulation “ conditions ” means— (a) restrictions or limitations on the use of the structural subsystem; or (b) requirements that must be met by a time specified in the authorisation. (5) The Safety Authority must consider an application under regulation 6(1) as soon as possible and make the decision as to whether to issue an authorisation on or before— (a) in the case of a vehicle with a TSI conform authorisation from an EU Member State , the later of— (i) the date falling two months after the Safety Authority receives the technical file; and (ii) if the applicant receives a notice under regulation 6(4) before the date referred to in (i), the date falling one month after the provision of all the information, risk analysis and results of the checks required by the notice; and (b) in the case of a vehicle with an authorisation from an EU Member State which is not a TSI conform authorisation, the later of— (i) the date falling four months after the Safety Authority receives the technical file; and (ii) if the applicant receives a notice under regulation 6(5) before the date referred to in (i), the date falling two months after the provision of all the information, risk analysis and results of the checks required by the notice. (6) Where paragraph (5) applies and the Safety Authority fails to make a decision by the date required, the vehicle is deemed to be authorised with effect from the beginning of the day which is three months after that date.

Read this section in the full act → · Open its part →

Read the official text ↗

Contains public sector information licensed under the Open Government Licence v3.0.