熱門推薦罰單破解實戰交通警察名師 25 年經驗,親授警察臨檢、檢舉魔人、科技執法、車禍糾紛的執法邏輯看課程介紹
購物車我的課程我的書籤免費註冊
The Pressure Equipment (Safety) Regulations 2016

The Pressure Equipment (Safety) Regulations 2016 reg 11

reg 11 Declaration of conformity and UK marking

(1) Where the conformity of pressure equipment or an assembly referred to in regulation 6 or 7 with the essential safety requirements has been demonstrated by a relevant conformity assessment procedure, the manufacturer must, before placing the pressure equipment or assembly on the market— (a) draw up a declaration of conformity in accordance with regulation 48 ( ... declaration of conformity); (b) affix the UK marking in accordance with regulation 49 (CE marking); and (c) where applicable, ensure that the identification number of the approved body is affixed in accordance with regulation 49. (2) The requirement in paragraph (1)(b) does not apply in cases where— (a) the conformity assessment procedure followed in accordance with regulation 41 is either module A2, C2, F or G; and (b) the conformity assessment procedure has been carried out by a user inspectorate. (3) The manufacturer must keep the ... declaration of conformity up-to-date. (4) Where pressure equipment or an assembly is subject to more than one enactment requiring the drawing up of a declaration of conformity, the manufacturer must draw up a single declaration of conformity which identifies each enactment by its title.

Read this section in the full act → · Open its part →

Read the official text ↗

Contains public sector information licensed under the Open Government Licence v3.0.