Sch 2 para 3
(1) Any civil works concerning the physical infrastructure of a railway (except the Docklands Light Railway) which have a cost of less than £7,000,000, a duration of less than 14 working days or a total length of less than 500 metres. (2) “ Railway ” has the meaning given in section 67(1) of the Transport and Works Act 1992 .