reg 1
A description of the project and of the regulated activity, including in particular: (a) a description of the location of the project and the regulated activity; (b) a description of the physical characteristics of the whole project and regulated activity , including where relevant, requisite demolition works, and the land-use requirements during the construction and operational phases; (c) a description of the main characteristics of the operational phase of the project and the regulated activity (in particular any production process): for instance, energy demand and energy used, the nature and quantity of the materials and natural resources (including water, land, soil and biodiversity) used; (d) an estimate, by type and quantity, of expected residues and emissions (such as water, air, soil and subsoil pollution, noise, vibration, light, heat, radiation and quantities and types of waste produced during the construction and operation phases) resulting from the operation of the proposed project and the regulated activity.