熱門推薦罰單破解實戰交通警察名師 25 年經驗,親授警察臨檢、檢舉魔人、科技執法、車禍糾紛的執法邏輯看課程介紹
購物車我的課程我的書籤免費註冊
The Town and Country Planning (General Permitted Development) (Amendment) (Wales) Order 2019

The Town and Country Planning (General Permitted Development) (Amendment) (Wales) Order 2019 s 3

s 3 Minor operations: recharging electric vehicles

In Part 2 (minor operations) after Class C insert— Permitted development D. The installation, alteration or replacement within an area lawfully used for off-street parking, of an electrical outlet mounted on a wall for recharging electric vehicles. Development not permitted D.1 Development is not permitted by Class D if the outlet and its casing would— (a) exceed 0.2 cubic metres; (b) face onto and be within two metres of a highway; or (c) be within a site designated as a scheduled monument. Permitted development E. The installation, alteration or replacement within an area lawfully used for off-street parking, of an upstand with an electrical outlet mounted on it for recharging electric vehicles. Development not permitted E.1 Development is not permitted by Class E if the upstand and the outlet would— (a) exceed 1.6 metres in height from the level of the surface used for the parking of vehicles; (b) be within two metres of a highway; (c) be within a site designated as a scheduled monument; or (d) result in more than one upstand being provided for each parking space.

Read this section in the full act →

Read the official text ↗

Contains public sector information licensed under the Open Government Licence v3.0.