My bookmarksSign up free

Commission Regulation (Euratom) No 302/2005 ANNEX II

Commission Regulation (Euratom) No 302/2005 ANNEX II

GENERAL DESCRIPTION OF THE SITE ( 1 )

ANNEX IISupplementary provisions

ANNEX II GENERAL DESCRIPTION OF THE SITE ( 1 ) Site identification Declaration No ( 2 ) Declaration date Reporting period ( 3 ) Comments ( 4 ) Entry ( 5 ) Ref. ( 6 ) MBA code ( 7 ) Building ( 8 ) General description, including use of contents ( 9 ) Comments ( 10 )                                                                                     Name and signature of the site representative: ………… Explanatory notes ( 1 ) The initial declaration should include all nuclear installations, and all other buildings on their sitesas described in Article 2(21). A separate entry should be made for each building on the site. Subsequent annual update declarations should include only those sites and buildings which have undergone a change since the previous declaration. A map of the site shall be attached with the initial declaration and updated when necessary. ( 2 ) The ‘Declaration No’ is a sequential number for each site, starting with ‘1’ for the initial site declaration. ( 3 ) The ‘Reporting period’ for the initial declaration is an ‘as of’ date, while for all subsequent annual updates the appropriate entry is the beginning and the ending date of the time period. It is understood that the information provided is valid as of the ending date. All dates should be reported using the DDMMYYYY format. ( 4 ) Comments applicable to the whole of the site. ( 5 ) Each ‘Entry’ in each declaration should be numbered sequentially, beginning with ‘1’. ( 6 ) The ‘Ref.’ column should be used to refer to another entry. The contents of the ‘Ref.’ column consist of the relevant declaration and entry numbers (e.g. 10-20 refers to entry 20 of declaration 10). The reference indicates that the current entry adds to or updates information reported earlier. Several references may be inserted, if necessary. ( 7 ) The ‘MBA code’ column should make reference to the MBA code to which the building in this entry belongs. ( 8 ) The ‘Building’ column should include a building number or other designation that provides an unambiguous identification of the building on the schematic map of the site. ( 9 ) The ‘General description’ for each building should include: (a) the approximate size of the building in terms of the number of floors and the total square metres of floor space; (b) the use of the building, including any prior uses of the building that might be relevant to interpreting other information, such as the results of environmental sampling, available to the Commission; and (c) the main contents of the building, where this is not readily apparent from the stated use. However, descriptions of activities previously provided in the Basic Technical Characteristics questionnaire need not be repeated. ( 10 ) Comments applicable to each entry. NB: Under Article 79 of the Treaty, those subject to safeguards requirements shall notify the authorities of the Member State concerned of any communications they make to the Commission pursuant to Article 78 and the first paragraph of Article 79 of the Treaty. This form, duly completed and signed, or the equivalent form in electronic format, must be forwarded to the European Commission, Euratom Safeguards, L-2920 Luxembourg.

Read the full instrument →

Other provisions in Commission Regulation (Euratom) No 302/2005

Compiled from an official source version. Later amendments or repeals may not be reflected; the official text prevails. · Read the official text ↗ · Data as of 2026-07-04

CitationANNEX II of Commission Regulation (Euratom) No 302/2005 (LawPlayer, data as of 2026-07-04)

© European Union, https://eur-lex.europa.eu, 1998-2026. Reuse authorised under Commission Decision 2011/833/EU, provided the source is acknowledged.

What to look at next