s 32 Charge for supply of electricity to be ascertained by appropriate meter
(1) Where a consumer is to be charged for his supply of electricity whether wholly or partly by reference to the quantity of electricity supplied, the supply shall be given through, and the quantity of electricity shall be ascertained by, an appropriate meter. (2) The meter shall be provided by the licensee, whether by way of sale, hire or loan. (3) The meter shall be installed on the consumer’s premises in a position to be determined by the licensee, unless in certain circumstances it is more reasonable to place it outside the premises or in some other position. (4) If the consumer refuses or fails to have his supply of electricity through the appropriate meter provided and installed in accordance with subsections (2) and (3) the licensee may refuse to give or may discontinue the supply. (5) For the purposes of this section a meter is an appropriate meter for use in connection with any particular supply of electricity if it is of a pattern of construction which, having regard to the terms on which the supply is to be charged for, is particularly suitable for such use.