法律人 LawPlayer logo

資料由法律人 LawPlayer整理提供·UK legislation / curated by LawPlayer from legislation.gov.uk

Statutory Instrument

The Dogger Bank Creyke Beck Offshore Wind Farm (Amendment) Order 2020

Citation
S.I. 2020/329
As at
Sections
4
Section 1Citation and commencement

This Order may be cited as the Dogger Bank Creyke Beck Offshore Wind Farm (Amendment) Order 2020 and comes into force on 23rd March 2020.

Section 2Amendment to the Dogger Bank Creyke Beck Offshore Wind Farm Order 2015

The Dogger Bank Creyke Beck Offshore Wind Farm Order 2015 is amended in accordance with this Order.

Section 3Amendments to Part 1 (Authorised development) of Schedule 1 (Authorised project)

(1) Part 1 (Authorised development) of Schedule 1 (Authorised project), is amended as follows.

(2) In the description of Project A offshore works, in paragraph (a) of the description of Work No. 1A, for “up to 1.2 gigawatts”, substitute “more than 100 megawatts”.

(3) In the description of Project B offshore works, in paragraph (a) of the description of Work No. 1B, for “up to 1.2 gigawatts” substitute “more than 100 megawatts”.

Section 4Amendment to Part 3 (Requirements) of Schedule 1 (Authorised project)

(1) Part 3 (Requirements) of Schedule 1 (Authorised project) is amended as follows.

(2) In paragraph 4(2), for the words “must be of such a size that if they were installed to the maximum permitted gross generating capacity specified for those works the total rotor-swept area for each Work No. would not exceed 4.35 square kilometres”, substitute “must not exceed a total rotor-swept area for each Work No. of 4.35 square kilometres”.

4 sections

Cite this legislation

The Dogger Bank Creyke Beck Offshore Wind Farm (Amendment) Order 2020 (legislation.gov.uk, OGL v3.0). Retrieved via LawPlayer, https://lawplayer.com/uk/act/uksi-2020-329 (accessed 2026-07-06)

Contains public sector information licensed under the Open Government Licence v3.0.

OGL-3

本頁資料來源:legislation.gov.uk (The National Archives)·整理提供:法律人 LawPlayer· lawplayer.com