法律人 LawPlayer logo

資料由法律人 LawPlayer整理提供·UK legislation / curated by LawPlayer from legislation.gov.uk

Statutory Instrument

The M4 Motorway (Junction 30 (Pentwyn) Slip Roads) (Trunking) Scheme 2006

Citation
S.I. 2006/3383 (W.)
As at
Sections
3
Section 1

The lengths of existing special road described in the Schedule to this scheme and shown by heavy black lines on the deposited plan are to become trunk road from the date this Scheme comes into force.

Section 2

In this Scheme:—

(1) All measurements of distance are measured along the route of the relevant highway;

(2) “the deposited plan” (“ y plan a adneuwyd ”) means the plan numbered HA16/1 NAFW 3 and called the M4 Motorway (Junction 30 (Pentwyn) Slip Roads) (Trunking) Scheme 2006 signed by authority of the Minister for Enterprise, Innovation and Networks and deposited at the National Assembly for Wales, Record Storage and Retrieval Unit ( RSRU ), Neptune Point, Ocean Way, Cardiff;

(3) “trunk road” (“ cefnffordd ”) means the special road mentioned in article 1 and the Schedule to this Scheme.

Section 3

This Scheme shall come into force on 21 December 2006 and will be called the M4 Motorway (Junction 30 (Pentwyn) Slip Roads) (Trunking) Scheme 2006.

3 sections

Cite this legislation

The M4 Motorway (Junction 30 (Pentwyn) Slip Roads) (Trunking) Scheme 2006 (legislation.gov.uk, OGL v3.0). Retrieved via LawPlayer, https://lawplayer.com/uk/act/wsi-2006-3383 (accessed 2026-07-07)

Contains public sector information licensed under the Open Government Licence v3.0.

OGL-3

本頁資料來源:legislation.gov.uk (The National Archives)·整理提供:法律人 LawPlayer· lawplayer.com