熱門推薦罰單破解實戰交通警察名師 25 年經驗,親授警察臨檢、檢舉魔人、科技執法、車禍糾紛的執法邏輯看課程介紹
購物車我的課程我的書籤免費註冊
The Simple Pressure Vessels (Safety) Regulations 2016

The Simple Pressure Vessels (Safety) Regulations 2016 Sch 2 para 15

Sch 2 para 15 Manufacturing

(1) The manufacturer must take all measures necessary so that the manufacturing process and its monitoring ensure conformity of the manufactured vessels with the type described in the Type examination certificate and with the applicable requirements of these Regulations. (2) Before commencing manufacture, the manufacturer must provide an approved body of his choice with all necessary information, and in particular— (a) the technical documentation referred to in paragraph 2(2)(c), together with — (i) the certificates relating to the suitable qualification of the welding operations and of the welders or welding operators; (ii) the inspection slip for the materials used in the manufacture of parts and components contributing to the strength of the vessel; and (iii) a report on the examination and tests performed; (b) the Type examination certificate; (c) a document describing the manufacturing processes and all of the predetermined systematic measures taken to ensure conformity of the vessels with the type described in the Type examination certificate, which document must include— (i) a description of the means of manufacture and checking appropriate to the construction of the vessels; (ii) an inspection document describing the appropriate examinations and tests to be carried out during manufacture, together with the procedures in respect thereof and the frequency with which they are to be performed; (iii) an undertaking to carry out the examinations and tests in accordance with the inspection document and to ensure that a hydrostatic test or, subject to the agreement of the relevant authorities, a pneumatic test is carried out on each vessel manufactured at a test pressure equal to 1.5 times the design pressure; and (iv) the addresses of the places of manufacture and storage and the date on which manufacture is to commence. (3) The examinations and tests referred to in paragraph 15(2)(c)(iii) must be— (i) carried out under the responsibility of qualified staff who are independent of production personnel; and (ii) the subject of a report. (4) The approved body must, before the date on which any manufacture begins, examine the documents referred to in paragraphs 15(2)(a) and (c) in order to certify their conformity with the Type examination certificate.

Read this section in the full act → · Open its part →

Read the official text ↗

Contains public sector information licensed under the Open Government Licence v3.0.