熱門推薦罰單破解實戰交通警察名師 25 年經驗,親授警察臨檢、檢舉魔人、科技執法、車禍糾紛的執法邏輯看課程介紹
購物車我的課程我的書籤免費註冊
The Measuring Instruments Regulations 2016

The Measuring Instruments Regulations 2016 Sch 1F para 6

Sch 1F para 6 Power supply failure

A measuring system shall either be provided with an emergency power supply device that will safeguard all measuring functions during the failure of the main power supply device or be equipped with means to save and display the data present in order to permit the conclusion of the transaction in progress and with means to stop the flow at the moment of the failure of the main power supply device.

Read this section in the full act → · Open its part →

Read the official text ↗

Contains public sector information licensed under the Open Government Licence v3.0.