(1) In this Order, except where the context otherwise requires—
“deposited plan and sections” means the plan and sections signed on behalf of the Secretary of State and marked “Plan and sections referred to in the Scottish Transport Group (Castle Bay Pier) Empowerment Order 1988”, of which copies are deposited at the offices of the Secretaries of State for Scotland and Transport and with Caledonian MacBrayne Limited, Harbour Office, Castlebay;
“the Group” means the Scottish Transport Group constituted under the Transport Act 1968 ;
“harbourmaster” means the harbourmaster appointed by the Group and includes his authorised deputes and assistants and any person authorised by the Group to act in that capacity;
“level of high water” means the level of mean high-water springs;
“limits of deviation” means the limits of deviation shown on the deposited plan;
“the pier” means the existing pier and quay wall at Castle Bay;
“the pier premises” means the quays, piers, landing places and all other works, land (including land covered by water) and buildings for the time being vested in or occupied or administered by the Group for the purposes of the pier undertaking as from time to time authorised;
“tidal work” means so much of any work as is on, under or over tidal waters or tidal lands below the level of high water;
“work” means the work authorised by this Order, or as the case may require any part thereof, and includes any work constructed pursuant to article 7 below.
(2) Except in relation to article 7 below, all dimensions stated in any description of works or lands in this Order shall be construed as if the words “or thereabouts” were inserted after each such dimension.
(3) Any reference in this Order to a work identified by the number of that work shall be construed as a reference to the work of that number authorised by this Order.