法律人 LawPlayer logo

資料由法律人 LawPlayer整理提供·UK legislation / curated by LawPlayer from legislation.gov.uk

Statutory Instrument

The Leeds City Council (Crown Point Bridge Improvement) Scheme 1992 Confirmation Instrument 1992

Citation
S.I. 1992/2967
As at
Sections
6
Section 1

The Leeds City Council (Crown Point Bridge Improvement) Scheme 1992 is hereby confirmed without modifications.

Section 2

The said Scheme as confirmed (hereinafter referred to as “the Scheme”) is set out in the Schedule hereto and copies of the Scheme with its accompanying plan are deposited at The Department of Transport, 43 Marsham Street, London SW1P 3PY and at the offices of the City Engineer, Leeds City Council, 2nd Floor, Dudley House, 133 Albion Street, Leeds, LS2 8JX.

Section 3

The Scheme will become operative on the date on which notice that it has been confirmed is first published in accordance with paragraph 1 of Schedule 2 to the Highways Act 1980.

Section 4

This Instrument may be cited as the Leeds City Council (Crown Point Bridge Improvement) Scheme 1992 Confirmation Instrument 1992.

Section 1

The Council are authorised to construct over the Aire and Calder Navigation and the navigable waters of the River Aire the bridge specified in the Schedule to this Scheme as part of the highway Crown Point Road which they are proposing to improve between East Street and a point 60 metres south of Bowman Lane in the City of Leeds.

Section 2

This Scheme may be cited as the Leeds City Council (Crown Point Bridge Improvement) Scheme 1992.

6 sections

Cite this legislation

The Leeds City Council (Crown Point Bridge Improvement) Scheme 1992 Confirmation Instrument 1992 (legislation.gov.uk, OGL v3.0). Retrieved via LawPlayer, https://lawplayer.com/uk/act/uksi-1992-2967

Contains public sector information licensed under the Open Government Licence v3.0.

OGL-3

本頁資料來源:legislation.gov.uk (The National Archives)·整理提供:法律人 LawPlayer· lawplayer.com