This Order may be cited as the Meldon Quarry Branch Line Order 1993 and shall come into force on 1st February 1994.
資料由法律人 LawPlayer整理提供·UK legislation / curated by LawPlayer from legislation.gov.uk
The Meldon Quarry Branch Line Order 1993
In this Order
“ the Acts ” means the Okehampton Railway Act 1862 , the Okehampton Railway Act 1864 and the Devon and Cornwall Railway Act 1868 ;
“ the Company ” means Euston Holdings Limited; and
“the Designated Land ” means the land in the County of Devon occupied by the line of railway (including Meldon Viaduct and the discontinued line of railway) from a point at Coleford Junction at 296 kilometres 31 metres from London Waterloo to a point 323 kilometres 580 metres from London Waterloo at the bridge to the south-west of Sourton Down known as bridge number 618.
In so far as the Designated Land is thereby affected, for the references in the Acts to the British Railways Board or their predecessors there shall be substituted references to the Company.
Cite this legislation
The Meldon Quarry Branch Line Order 1993 (legislation.gov.uk, OGL v3.0). Retrieved via LawPlayer, https://lawplayer.com/uk/act/uksi-1993-2805
Contains public sector information licensed under the Open Government Licence v3.0.
本頁資料來源:legislation.gov.uk (The National Archives)·整理提供:法律人 LawPlayer· lawplayer.com