The M66 Motorway (Bury Easterly Bypass Northern Section) and Connecting Roads Scheme 1973 (hereinafter referred to as “the Principal Scheme”) is varied as follows:
(1)
(a) in article 2 of the Principal Scheme for the words “the deposited plan”substitute the words “the deposited plan and the further plan”;
(b) after the first sub-paragraph of article 4 of the Principal Scheme insert the following sub paragraph —
(c) for paragraph 1 of Schedule 2 to the Principal Scheme substitute —
(1) Junction with Rochdale Road (A58) at Heap Bridge
Two routes to connect the northbound and southbound carriageways of the Motorway with a roundabout to be constructed as part of Rochdale Road (A58) at Heap Bridge (the special roads along these routes being respectively given the reference letter A on the deposited plan and the reference letter B on the further plan).
(2) The heavy black line given the reference letter B on the deposited plan referred to in the Principal Scheme shall be disregarded.