(1) In this Order—
“deposited plan and section” means the plan and section prepared in triplicate, signed by the Head of Ports Division in theDepartment of Transport and marked “Plans and section referred to in the Inverness Harbour Revision Order 1997”, of which two copies are deposited at the offices of the Secretary of State for Transport and one at the principal office of the Trustees;
“level of highwater” means the level of mean high water springs;
“limits of deviation” means the limits of deviation shown on the deposited plans;
“tidal work” means so much of any work authorised by this Order as is on, under or over tidal waters or tidal lands below the level of high water;
“Trustees” means the Trustees of the Harbour of Inverness;
“undertaking” means the undertaking of the Trustees for the time being authorised;
“works” means the works authorised by this Order or, as the case may require, any part thereof.
(2) This Order shall be read as if the words “or thereabouts” were inserted after each distance mentioned in article 3 of this Order.