法律人 LawPlayer logo

資料由法律人 LawPlayer整理提供·UK legislation / curated by LawPlayer from legislation.gov.uk

Statutory Instrument

The M60 Motorway (Improvement Between Junctions 5 and 8) Connecting Roads Scheme 1999

Citation
S.I. 1999/2724
As at
Sections
15
Section 1

This Scheme may be cited as the M60 Motorway (Improvement Between Junctions 5 and 8) Connecting Roads Scheme 1999, and shall come into force on 18th October 1999.

Section 2

In this Scheme:

(a) all measurements of distance are measured along the route of the relevant highway or, as the case may be, to the soffit of the relevant bridge;

(b)

(i) “connecting road” means a special road along a route described in Schedule 1 to this Scheme;

(ii) “the Motorway” means the M60 Motorway;

(iii) “the plan” means the plan numbered HA 16/1 CNW 355, marked “The M60 Motorway (Improvement Between Junctions 5 and 8) Connecting Roads Scheme 1999”, signed by authority of the Secretary of State for the Environment, Transport and the Regions, and deposited at the Highways Agency, St. Christopher House, Southwark Street, London SE1 0TE; and

(iv) “the special roads” means each connecting road.

Section 3

The Secretary of State is authorised to provide the special roads for the exclusive use of traffic of Classes I and II of the classes of traffic set out in Schedule 4 to the Highways Act 1980.

Section 4

The centre line of each of the special roads is indicated by a heavy black line on the plan.

Section 5

Each of the special roads shall become a trunk road on the date when this Scheme comes into force.

Section 6

The Secretary of State is authorised to construct—

(a) the bridge specified in Schedule 2 to this Scheme as part of the connecting roads respectively given the numbers 3 and 4 on the plan;

(b) the bridge specified in Schedule 3 to this Scheme as part of the connecting road given the number 4 on the plan; and

(c) the bridge specified in Schedule 4 to this Scheme as part of the connecting road given the number 2 on the plan.

Section 1Specification

Points of commencement and termination: the bridge commences at a point approximately 210 metres South of Barfoot Bridge over the River Mersey. The bridge terminates at a point approximately 310 metres South of Barfoot Bridge over the River Mersey.

Section 2Specification

Type of Construction: three span composite steel and reinforced concrete bridge deck supported on in-situ reinforced concrete substructure. Intermediate support columns with crossheads.

Section 3Specification

Headroom: 4.8 metres above Normal Water Level.

Section 1

Points of commencement and termination: the bridge commences at a point approximately 200 metres North-east of Crossford Bridge on the A56, Chester Road. The bridge terminates at a point approximately 270 metres North-east of Crossford Bridge on the A56, Chester Road.

Section 2

Type of Construction: three span composite steel and reinforced concrete bridge deck supported on in-situ reinforced concrete substructure. Intermediate support columns with crossheads.

Section 3

Headroom: 12.0 metres above Normal Water Level.

Section 1

Points of commencement and termination: the bridge commences at a point approximately 155 metres North-east of Crossford Bridge on the A56, Chester Road. The bridge terminates at a point approximately 170 metres North-east of Crossford Bridge on the A56, Chester Road.

Section 2

Type of Construction: two span composite steel and reinforced concrete bridge deck supported on in-situ reinforced concrete substructure. Intermediate support column with crosshead.

Section 3

Headroom: 6.8 metres minimum above Normal Water Level.

15 sections

Cite this legislation

The M60 Motorway (Improvement Between Junctions 5 and 8) Connecting Roads Scheme 1999 (legislation.gov.uk, OGL v3.0). Retrieved via LawPlayer, https://lawplayer.com/uk/act/uksi-1999-2724

Contains public sector information licensed under the Open Government Licence v3.0.

OGL-3

本頁資料來源:legislation.gov.uk (The National Archives)·整理提供:法律人 LawPlayer· lawplayer.com