(1) This Order may be cited as the Electricity (Exemption from the Requirement for a Generation Licence) (No. 2) Order 2003 and shall come into force on 11th January 2004.
(2) This Order does not extend to Scotland.
資料由法律人 LawPlayer整理提供·UK legislation / curated by LawPlayer from legislation.gov.uk
(1) This Order may be cited as the Electricity (Exemption from the Requirement for a Generation Licence) (No. 2) Order 2003 and shall come into force on 11th January 2004.
(2) This Order does not extend to Scotland.
In this Order—
“ the Act ” means the Electricity Act 1989;
“Cambrian Wind Energy” means Cambrian Wind Energy Limited, registered in England and Wales with number 3343483;
“Cefn Croes generating station” means the wind farm known as Cefn Croes Wind Farm situated at Ceredigion in Wales;
“Global Renewable Energy Partners” means Global Renewable Energy Partners UK Marine Limited, registered in England and Wales with number 04130301;
“licensed generator” means the holder of a licence under section 6(1)(a) of the Act;
“licensed transmitter” means the holder of a licence under section 6(1)(b) of the Act;
“Kentish Flats generating station” means the offshore wind farm known as Kentish Flats Offshore Wind Farm situated in the outer Thames Estuary at Kentish Flats approximately 8.5 kilometres north of Herne Bay, Kent; and
“total system” means the transmission system in England and Wales of the licensed transmitter and all distribution systems in England and Wales.
Exemption is granted from section 4(1)(a) of the Act to Cambrian Wind Energy in respect of the Cefn Croes generating station.
Exemption is granted from section 4(1)(a) of the Act to Global Renewable Energy Partners in respect of the Kentish Flats generating station.
(1) The exemption granted by article 3 to Cambrian Wind Energy is subject to compliance with the conditions specified in paragraph (2) below.
(2)
(a) Cambrian Wind Energy is not a licensed generator.
(b) the Cefn Croes generating station is connected to the total system and is not normally capable of exporting more electrical power than 100 megawatts to the total system, disregarding power temporarily provided in excess of 100 megawatts due to technical circumstances outside the reasonable control of Cambrian Wind Energy.
(1) The exemption granted by article 4 to Global Renewable Energy Partners is subject to compliance with the conditions specified in paragraph (2) below.
(2)
(a) Global Renewable Energy Partners is not a licensed generator.
(b) The Kentish Flats generating station is connected to the total system and is not normally capable of exporting more electrical power than 100 megawatts to the total system, disregarding power temporarily provided in excess of 100 megawatts due to technical circumstances outside the reasonable control of Global Renewable Energy Partners.
The Electricity (Exemption from the Requirement for a Generation Licence) (No. 2) Order 2003 (legislation.gov.uk, OGL v3.0). Retrieved via LawPlayer, https://lawplayer.com/uk/act/uksi-2003-3318
Contains public sector information licensed under the Open Government Licence v3.0.
本頁資料來源:legislation.gov.uk (The National Archives)·整理提供:法律人 LawPlayer· lawplayer.com